Site job responsibilities

On-site job responsibilities

In today's society, the frequency of the use of job responsibilities is on the rise, the development of job responsibilities can effectively regulate the operation behavior. Then how to develop job duties to play its greatest role? The following is my site for you to organize the job duties, only for reference, welcome to read.

Site job responsibilities 1

1. Familiar with the construction drawings, in accordance with the drawings according to the actual site to develop the professional pre-construction materials budget, reported to the engineering director for review, handing over the material department to prepare materials.

2. Into the construction site to set an example of strict compliance with the construction management system, according to the standard construction, strict quality control.

3. Coordination of this specialty and other related professions, the relationship between the cross operation, can not be resolved Times supervisor.

4. Familiar with the construction drawings, participate in the drawing review, responsible for the construction of the organizational design, program, progress of renovation and sporadic civil engineering construction.

5. In-depth construction site, timely detection and correct treatment of general technical problems in construction, found that the major technical problems, if not to be resolved by themselves to report to solve the problem at all levels.

1, responsible for the financial system, invoice system, fee control system or SAP financial module system management, operation and technical support work.

2, responsible for the implementation of RPA financial robot development, management and operation and maintenance support.

3, responsible for the invoice system in the user's question and answer and solve.

4, according to the financial center and store financial system needs to develop solutions.

5, according to customer needs, analysis, design and provide project solutions.

6, responsible for undertaking the implementation of project documentation and implementation work assigned by the project manager.

7, responsible for the financial system functional testing and user manual preparation.

8, responsible for the training document update and daily question and answer work.

1, according to the hospital business objectives decomposition of individual sales targets, through customer development, tapping the potential, improve service and other ways, with the promotional program to achieve individual sales targets;

2, responsible for hospital service etiquette requirements, warm, sincere reception of customers, professional knowledge, good communication skills for customers to solve the problem and recommend the hospital to customers service projects;

3, close communication and cooperation with doctors, in-depth development of customer consumption potential;

4, is responsible for guiding the old customers to recommend new customers, the development of customer relationship resources;

5, to assist customers to handle the formalities and preparations for the work, such as the payment of fees, medication, preoperative preparation;

6, is responsible for regular or irregular return visits to the customer to understand the customer's satisfaction with the company's services, treatment, and so on. The company's service satisfaction, treatment effects and service needs, maintain good customer relations;

7, responsible for customer data management: collection, recording of visiting customer data information, according to the hospital regulations by the medical department unified archiving management; respect for customer privacy, do a good job customer information?

8, is responsible for completing the daily work performance statistics, customer-related information into the customer management system;

9, is responsible for the cleanliness of the work area: to keep the work area clean, neat and tidy; do a good job of the items of the stereotypes positioning.

Site Job Responsibilities 4

1, familiar with the state and the project location of the engineering cost policies, documents and quota norms, based on the most appropriate relevant provisions and quotas to prepare and review the cost budget.

2, collect, organize the professional costing information materials, investigate and grasp the market dynamics, the price of equipment, materials, labor, etc. used in the project, regular quarterly inquiry work, regular maintenance and updating of the company's costing information database.

3, familiar with the construction drawings, participate in the project drawing review and technical briefing, on-site field survey according to the bidding design program, participate in the bidding documents, bid preparation and contract evaluation.

4, participate in the construction contract signed with the A party, A supply materials and negotiation, signed with the supplier of the company's own bulk of the main material and negotiation, signed with the construction team construction and negotiation. According to the signing of various types of contracts on the project cost of economic indicators for comparison, to make cost analysis.

5, with the project staff to prepare the construction schedule, according to the production schedule to do a good job in each production phase of the construction budget, regularly submitted to the leadership of the company's economic operation of the project report.

6, with the project manager to do a good job of project cost accounting, regularly to the construction site of the project department, combined with the project to analyze the construction costs of engineering materials, labor costs and other construction costs, approved the proportion of consumption of a variety of resources, strict control of the project construction costs, to prevent exceeding the cost of the budget in the construction process.

7, timely handling of the project site occurred in the project visa single, and in turn, number management, to ensure the smooth progress of the final account of the project. Responsible for the division of the project payment node amount, audit project progress payments.

8, to assist the project manager to do a good job of all kinds of economic forecasting tasks, to participate in the budget of the project under construction and completion of the final accounts, real-time preparation of the final account of the project, with the relevant departments of the company to do a good job of the final account of the project to send the audit and audit tasks.

9, do a good job of summarizing and archiving project cost documents. Participate in the internal acceptance work of the project department and audit the settlement of the internal site.

10, the strict implementation of confidentiality measures, do a good job of the confidentiality of the budget documents.

11, build the company's pre-settlement and progress statement ledger, fill in the relevant statements.

12, to assist the Ministry of Finance on the project costing.

13, to complete other work assigned by the leadership.

Site Job 5

Job Responsibilities

Job Description :

1. Anhui, Shanghai, Fujian region of customer satisfaction indicators, coordinating the work of engineers in the region to arrange, visit the provincial sales and quality agents;

2. Follow the department's work requirements for the work of the region is responsible for customer satisfaction;

3. Control of the regional service costs, the construction of the department of the proposal, *** with the enhancement of the team's service capabilities.

Requirements :

1. Healthcare industry service work management positions for more than 3 years of work experience, have a good sense of service and communication skills;

2. Specific a certain degree of the overall situation, there is to enhance the team's awareness, follow the company *** with the growth of a strong willingness to 3. Strong spirit of teamwork.

1, in strict accordance with the operating specifications, with the Ministry of project implementation, coordination of construction units, do a good job on-site product installation and commissioning work to ensure that the product meets the user to use.

2, timely solution to the site equipment failure, summarize the problem, put forward reasonable suggestions.

3, participate in the production department of electrical assembly group of daily product assembly, debugging tasks, and to ensure production safety and efficiency.

4, do a good job in the production site 6S daily activities to ensure that the production site specification.

5, to complete other temporary tasks assigned by the superior.

site duties 7

1, coordination between the types of work with each other, the organization of a reasonable ` arrangement of lap, do a good job of the deployment of a variety of machinery.

2, with the raw materials, semi-finished products inspection and acceptance.

3, reasonable deployment of labor, grasp the quality of the work of the dynamic situation, the organization of the quality of self-inspection, mutual inspection, to stop the violation of the requirements of the process and the norms of the wrong behavior. Correct and penalize the illegal and unauthorized operation teams and individuals.

4, is responsible for the issuance of the construction task list, the limit of material orders, supervise the workers in accordance with the ratio of materials, to eliminate material waste.

5, grasp the jurisdiction of the standardized management of the site, timely organization of the material into and out of the work and meet the requirements of civilized construction.

6, the loss caused by the quality of construction, we must promptly investigate, analyze the cause, assess the loss, develop corrective measures and methods, approved by the project manager to deal with timely.

Responsibilities:

1, familiar with the construction technology, acceptance standards and mandatory specifications for building water supply and drainage and electrical and other installation projects; the implementation of the project developed by the Ministry of quality assurance program, the implementation of quality assurance measures.

2, responsible for presiding over the installation project work, familiar with the construction contract, construction drawings, construction specifications, participate in drawing review and technical briefing, inspection of the projects, responsible for the progress of water and electricity installation projects, quality, safety and other inspection work.

3, participate in the preparation of the construction organization design, responsible for the preparation of the installation of construction programs and construction of temporary water and electricity programs; seriously implement the operating specifications, guidance and supervision of construction personnel in accordance with the drawings of the construction, strict implementation of the safety, technical delivery system, do a good job of quality inspection and safety construction work.

4, to participate in the site of the hydropower project contract management, strict implementation of the provisions of the hydropower project contract, to ensure that the completion of the hydropower project contract performance, to assist in dealing with the implementation of the hydropower project contract implementation process of disputes, claims and other matters.

5, listen to the leadership of the Ministry of Engineering arrangements, subject to the statute of the Ministry of Engineering. Completion of the company's leadership assigned to its work.

Requirements:

1, more than 5 years of management experience in plumbing and electrical installation.

2, water supply and drainage, electrical automation and other related professional specialties and above, with the installation of class construction certificate, intermediate and above.

3, understand the construction industry safety, quality of the relevant laws, regulations and rules, procedures, norms and standards.

4, can use professional knowledge of the project under construction inspection, installation project progress, quality, data and other aspects of the analysis, requirements, and can be uploaded and downloaded to supervise the implementation of rectification of the project department.

5, strong sense of responsibility, strong principles, strong resistance to pressure, with the ability to upload and download, left and right communication and liaison.

6, can often travel.

7, with a certain degree of computer expertise.

Job Description:

-Responsible for answering the front desk consulting phone calls, to solve a variety of customer concerns;

-Responsible for the reception of customers to the hospital consulting, explaining a variety of surgical procedures in detail, to complete the consulting process;

-Perfect customer information, do a good job of system registration;

-To improve the customer information, to do a good job of system registration;

-Active, proactive and responsible for the work of the customer, to improve the customer information, to do a good job of system registration.

Requirements:

-secondary education, graduated from medical cosmetology, clinical, nursing, marketing and other related majors;

- more than 1 year of plastic surgery hospital network, telephone cosmetic plastic surgery consulting or other consulting positions work experience;

-love the industry, engaged in the medical plastic surgery cosmetic consulting or health care work;

-love the industry, engaged in medical plastic surgery consulting or health care work;

-consulting with customers to ensure the quality of the service.

-Strong communication skills, talk generously, clear articulation, agile thinking, strong affinity;

-Have excellent teamwork and service consciousness, personality enthusiasm, optimism, positive, strong resistance to pressure;

-Good image, good temperament is preferred.

1, study, implementation of the state and construction administration issued by the construction laws, norms, regulations, technical standards; familiar with the capital construction program, construction procedures and construction laws, and specific application in the actual work.

2, familiar with the structural characteristics and key parts of the construction project, master the construction site of the surrounding environment, social (including demolition and relocation, etc.) and economic and technological conditions; responsible for the positioning of the project, alignment, leveling, settlement observation records.

3, familiar with the review of drawings and related information, participate in drawing review; participate in construction budgeting; preparation of monthly construction operation plan and resource plan.

4, the strict implementation of process standards, acceptance and quality inspection and evaluation standards, as well as a variety of professional and technical procedures, the development of quality, safety and other measures, in strict accordance with the drawings, technical standards, the construction of construction organization design, and often supervise and inspect; to participate in the quality inspection and evaluation; participate in the quality of the accident investigation.

5, do a good job in the construction of the task and technical delivery of work, and construction guidance, inspection and acceptance.

6, do a good job on-site material acceptance visa and management; do a good job of hidden project acceptance and volume of work visa.

7, to participate in the completion of the acceptance of the work in the Shi Ding; to assist the finalization of the final account of the project.

8, timely and accurately collect and organize the construction production process, technical activities, material use, labor deployment, capital turnover, economic activity analysis of the original records, ledgers and statistical reports, keep a good diary.

9, drawing as-built drawings, organizing unit project completion quality pre-test, responsible for organizing all the technical files.

10, participate in the completion of the return visit activities, the need for repair, maintenance projects, as soon as possible to organize the implementation of personnel.

11, to complete other tasks assigned by the project manager.

Site duties 11

1, responsible for all the company's warehouse management process, the company warehouse management system building experience;

2, improve the warehousing and logistics of the standard workflow, the development of operating norms, improve efficiency, reduce costs, the warehouse work planning and progress control, rational allocation of resources;

3, is responsible for guiding, managing, monitoring the relevant Personnel training in business operations, improve the quality of work and service attitude, do a good job of subordinate personnel performance assessment;

4, the implementation of the warehouse work plan, the warehouse's daily operations for guidance, inspection, supervision, evaluation and improvement, effective control of the warehouse, to ensure that the warehouse daily operations in a smooth and orderly;

5, responsible for the material planning and inventory management, optimize the efficiency of distribution and distribution cost control;

5, responsible for material planning and inventory management, optimizing distribution Cost control;

6, is responsible for the reasonable setup and optimization of the warehouse area planning and layout, efficient use of warehouse area and volume, control of warehousing operating costs;

7, is responsible for the establishment of the warehouse security system, to ensure the safety of goods, warehouse assets, personnel operations;

8, is responsible for the warehouse of the day-to-day acceptance of the materials, warehousing, storage, inventory, reconciliation, shipment work

Site duties 12

Responsibilities:

1, responsible for construction project accounts processing, reimbursement documents, report preparation, funding approval, etc.;

2, increase or decrease in personnel for the project attendance report, that is, personnel-related work, etc.;

3, to assist the project manager to prepare the funds weekly, monthly, yearly plan statement;

4, to assist the Ministry of Finance docking;

5, to assist the work of the temporary arrangements for the departments;

6, timely and accurate conveyance of instructions and implementation of the higher level;

7, the timely completion of the Ministry of Finance requirements of the reports;

8, to complete the project team, suppliers, reconciliation, payment applications;

9, the completion of the higher level of the arrangement of other matters. Other affairs.

Job Requirements:

1, finance, accounting college degree or above, and holds a certificate of accounting or accountant title

2, with two years or more relevant experience in the construction industry, fresh graduates (learning ability) can also be;

3, familiar with the new tax law and the new accounting standards of the normative requirements, proficient in the construction industry accounting process, skilled operation of financial software and office software;

3, familiar with the new tax law and new accounting standards, proficient in the construction industry accounts process, skilled in the operation of financial software and office software;

4, familiar with the new tax law and new accounting standards of the normative requirements of the construction industry. Operation of financial software and office software;

4, with good learning ability, ditch can coordinate ability, teamwork, sense of responsibility, rigorous work; strong principles;

5, can withstand a certain degree of pressure, can be long-term stability is good;

site duties 13

Description of duties:

1. Relevant information materials

4, the company arranged other related work

Requirements:

1, college and above

2, finance-related work experience is preferred

Site Job Responsibilities14

1, the project's bulk materials, such as; reinforcing bars, cement, timber, templates, Steel pipes and bulk supplies are purchased by the company's material supply department, and sporadic materials and change materials are purchased by the project department's material clerk.

2, master the project's master plan and monthly and weekly plans, and prepare the project material supply plan.

3, according to the material supply plan for market inquiry, comparison of goods, and then report to the manager to determine the price.

4, familiar with the progress of the project and the market situation, according to the plan for procurement, and to meet the quality of progress requirements.

5, master the performance of the material, quality requirements, according to the test batch to provide certificates to the technician.

6, the need for re-inspection of the material, according to the inspection batch for re-inspection, re-inspection sheet to the technician.

7, grasp the regional price information of materials, and supply units, collect first-hand information.

8, grasp the inventory of materials to adjust the material supply program in a timely manner. Purchase of materials that do not meet the requirements, to eliminate the use of the project, to negotiate a solution.

9, mastering the supply price of materials and budget prices, such as material supply price is greater than the budget price of timely feedback to the budgeter for approval procedures.

10, timely grasp of the site of the project changes in a timely manner for materials.

11, material timely storage, timely reimbursement, reimbursement time can not exceed three days.

12, supervise the use of materials, material waste, damage should be stopped in a timely manner, and the relevant personnel to propose penalties.

13, carefully and completely fill out the bill of lading, and the bill of lading will be kept in good condition and archived.

1, lead the operations team, and ensure that the team's KPIs to meet the required standards, to ensure that the team's overall quality of service excellence;

2, the management of departmental personnel, to solve the problems encountered by the personnel in the wiring and to give timely guidance to ensure the normal completion of the business process;

3, responsible for the daily communication with the corresponding departments of the company;

3, responsible for communication with the corresponding departments of the company to carry out

4, build the project team healthy, positive, upward, cohesive corporate culture, increase the stability of personnel and team centripetal force;

5, according to the workload of the reasonable approval of leave and other attendance requirements, control arrangements for departmental personnel rest, meals, overtime, and training and other matters;

6, and constantly optimize the project team's workflow, enhance work efficiency;

6, and optimize the project team's workflow, and enhance work efficiency;

6, and optimize the work of the project team, and optimize the work of the project team. Enhance work efficiency;

7, dealing with the daily management of the project team, and assist the director of customer service to deal with other related matters;

8, to assist the director of customer service personnel recruitment, training, counseling, management, incentives, etc. to set up and implement the work;

9, to assist the director of customer service to build a system of rules and regulations to improve the department, and to monitor and feedback on implementation;

9, to assist the director of customer service to establish a chapter and improve departmental regulations, and to monitor and feedback on implementation. Supervision and feedback;

10, for customer complaints tracking and return visits, customer requirements and satisfaction with the treatment of statistical feedback to the data commissioner.

;