Assistant engineer work summary

A period of time in the work of the unconscious has come to an end, this period of time since the work, harvest a lot of achievements, let's summarize, and recorded in the work summary. So how to write a new style of work summary? Here is my help to organize the assistant engineer work summary (General 6), welcome to learn and reference, I hope to help you.

Assistant Engineer Job Summary 1

Since the work, in the unit leadership of the careful cultivation and teaching, through their own continuous efforts, both ideological learning or work, have made great progress and great gains, now the work is summarized as follows:

A professional knowledge as well as the improvement of skills

The theory of life is based on life, but also on the work of the people. p> Theory from life and higher than life and ultimately restored to life, 20xx years of work, I y appreciate the process of transformation.

In the work I realized that I have to learn a lot of things, through various channels, whether it is learning or the guidance of the old staff, I continue to absorb the new knowledge and apply the practice, participate in some engineering tests, starting from a small place, the big picture, learning and asking questions, and put forward different requirements at the right time, and constantly summarize the lessons learned from the work to enhance their own capabilities at the same time, to make up for some of their own shortcomings.

The first thing I'd like to say is that I'm not sure if I'm going to be able to do this.

"Nothing is too big or too small, we must do our best", no matter how big or small the matter is, we must do our best to complete it, because every time I finish a job, I will gain some knowledge, "accumulate small streams and become a river", through ten years of hard work, I have in all aspects. I'm not sure how much I'm going to get out of this.

Second, the work of the experience

Mindset determines everything. I think, the work must be: can suffer, can work can dedicate, can endure, so as to have gained, have improved. A year of work, I learned how to face difficulties, how to do a good job, and establish a correct outlook on life and values.

After participating in different sizes of projects and topics, I feel that as a machinery manufacturing maintenance staff, we must be careful, serious, responsible, every step of the work should be steady, familiar with the process of equipment maintenance, welding quality requirements to be high, the specification is more familiar with the heart, in addition to this, still need to learn the relevant, and the professional linkage between the knowledge, with the knowledge of the armed themselves, always

In this case, I'm not sure if I'm a good person.

In this 20xx year's work I participated in the company's many technological reform and innovation work, in the past work, in the leadership of the kind care and enthusiasm of colleagues to help, after continuous efforts and learning, I adapt to and like this work, with a certain technical work ability, but there are still some shortcomings, I know that in the future work, I still need to strengthen the learning, overcome the shortcomings, and strive for their own work. I know that in the future work, I still need to strengthen the study, overcome the shortcomings, and strive to improve their professional and technical level.

At the same time, I realize that the rapid development of the nuclear energy industry in today's society, the requirements of nuclear safety will correspondingly have higher requirements, in order to meet the needs of the community, to keep pace with the development of the unit, I should accelerate the learning of new theories and new technologies, hard work, growth and exercise in practical work, and continue to accumulate experience, improve their business level and technical skills, for the development of the unit, to contribute to the development of society. For the development of society to contribute to their own strength.

Assistant Engineer Work Summary 2

I in 20xx x month, by the Personnel and Labor Bureau of the primary job evaluation committee identified, obtained the title of assistant mechanical engineer. In the company galloped during the period, I mainly did the following work:

First, in the production, conscientiously fulfill the duties of the production scheduler, for the successful completion of the xx production to do their part. xx production is the centralized embodiment of the work of the branch, the completion of the indicators or not, have a direct impact on the realization of the overall objectives of the branch. As a production dispatcher, I am aware of the great responsibility on my shoulders, how to coordinate the water, electricity and gas balance of the production departments, to ensure the smooth progress of production work, complete or overcompletion of the branch and the section issued by the production targets for a few days, and strive to achieve high-energy, low-consumption, high sugar production, production of sugar, tightly focused on their own duties and objectives, I am on the whole of the production of each link of the attention and tracking! I will pay attention to and follow up every link of the production, from the big picture, from the small place to start, do not miss every detail, from the cane into the factory stacking to sugar packaging factory, that a link in the problem or fluctuations, I will appear on the scene in a timely manner, and the operators take measures to deal with it, and can not be resolved to the section chief and the competent leader to report, so that the problem can be resolved in a timely manner, to ensure that the production work goes smoothly and the realization of the various production indexes.

Second, to participate in equipment maintenance and technical reform work, with their accumulated experience and professional and technical knowledge to guide and assist the workshop to complete the routine maintenance of equipment and equipment technical reform work.

During this year's overhaul, I guided and assisted the clean workshop to complete the transformation of the sedimentation tank and vacuum suction filter juice pumping system transformation, but also participate in the installation of the syrup floating system, 20xx annual overhaul period, approved by the company agreed to the branch of the cooking workshop packaging room to install two electronic power packaging scales, the competent leadership of the branch arranged for the installation and need to transform the equipment design, and guide the department according to the packaging room. The competent leader of the branch arranged Yang Yinhua to be responsible for the design of the installation and the equipment to be remodeled, and guided the department to carry out the installation according to the design drawings, and the installed and remodeled equipment was used after a squeezing season without any abnormality, which achieved the expected purpose.

In the xx annual overhaul period, I also participated in the transformation of the workshop pretreatment system, and reference to the arrangement of the cane knife in other factories, to determine a group and two groups of cane knife machine knife row method, with down the effect is good. This year, in the maintenance period, under the arrangement of the leadership, with reference to the first two groups of cane knife machine knife arrangement method, the third group of cane knife machine cane knife rearrangement and increase, now use the effect is good.

Third, in addition to completing the above two major tasks, in the section, but also took the initiative to undertake most of the spare parts map mapping tasks; at the same time both the branch of the management of the technical file; also involved in the quality of purchased materials to verify; in November 20xx, but also participated in the company's standardized management system in the preparation of the technical standards system.

In the science and technology is changing rapidly, more and more fierce competition today, I personally realize that, constantly learning new knowledge, grasp new skills, and constantly improve their business level and work skills, in order to meet the needs of the work and adapt to the development of society.

In the work process, I will continue to learn from experienced colleagues and workshop operators to learn their own not really grasp the technology or skills, and learn to use, the production process of some of the information is also collected and organized, transformed into information to prepare for the required; spare time to look through some professional books, view some professional websites, learning and grasp some of the advanced knowledge of the professional and technical knowledge; but also look at some of the governance Or other aspects of the books or websites, learning a variety of knowledge, to improve their overall ability.

In the future, I will improve my own quality through continuous learning and practice, so that their progress and social development synchronization to meet the needs of the work.

The above summary, please give leadership comments.

Assistant Engineer Job Summary 3

Time is running out, turn around and graduate a year, looking back at the past year, from looking for work to now to thank a lot of people, there are a lot of gains, there are a lot of regrets, "the past can not be reminded of the future can be chased", the gains or to thank those who have the voice and the silent teacher, the regrets can only be in the future work to further study, and strive to do ZhiMing and line no fault.

The following is a year in the last year to experience some of the experience of two sites: after graduation, the first site is the eighth sewage treatment plant in Kunming City, from July 23, 20XX started to December 28, 20XX through the water shear, is included in the national five-year plan of the national key projects, one of the projects Dianchi governance, the project's daily treatment capacity of 100,000 tons, using the AAO process, the project mainly consists of Pile long screw drilling air-filled pile foundation, deep 4, 5 ~ 5 meters pit excavation, the main civil construction, equipment installation, green planting, test traffic, as the first project after graduation, I am very lucky to be able to talk to a rich experience in the field, coordination ability is very strong, sincere understanding of the subordinates of our "teacher.

Sewage treatment plant as one of the water works, elevation control, seepage and leakage prevention is the focus of the project and the difficulties, especially the expansion joints position of the rubber stopper construction, because in the position of the construction joints there is only a rubber stopper, is the weak point of the water structures, in this regard, the Supervision Department in accordance with the principle of pre-control beforehand, through the issuance of the Supervision work contact sheet and the construction unit engineering department for technical briefing! In this regard, the supervision department according to the principle of pre-control, by sending the supervision work contact list and technical briefing to the engineering department of the construction unit to improve the attention of the construction unit to this part, in the construction process through the inspection, standby to correct the installation of non-standardized waterstop in a timely manner, in the process of inspection focus on checking the location of expansion joints, in the concrete pouring through the standby measures to control the location of expansion joints in the quality of the concrete pouring.

Because the project is located next to the Dianchi pond, the base elevation stratum is mainly silt layer, in the steel pipe pre-burial construction, due to the narrow working surface, silt layer soaked in water leading to the base bearing capacity reduction, to the pipeline hardening of the substrate to the difficulty of the excavation, the excavation of the surface of the narrow also to the pit safety hazards, in this regard, to take the excavation of a short, fast strategy, frequency, pit excavation in a timely manner after the basement treatment and pipeline lifting and installation, the pit on both sides of the steel sheet pile reinforcement to ensure safety. The use of steel sheet pile reinforcement to ensure safety, because the plant working surface arrangement is compact, parallel, cross-construction synchronization, many construction units, the interference between processes is very large, the dispute between the construction units of the dispute over resources, the Supervision Department of the organization of the civil construction (the main body, pipelines, roads, corrosion control), equipment installation, greening the construction units to meet, according to the actual progress of the staggering of the construction of each construction unit's construction position, and to concentrate on priority To solve the impact of the construction of the construction of the right-of-way, the green construction unit is required to wait until the completion of the construction of the plane layout before entering the construction, in the construction units to work together, Kunming City, the eighth sewage treatment plant in 157 days on the completion of the test water.

The second site is also one of the Dianchi Lake management project in Kunming, Dianchi Lake south shore interceptor sewer construction, the start date of November 20xx to date, the project proposed investment of 470 million, the main body of the specifications of the 3x3m and 1x3m rainfall and sewage diversion box culvert, the total length of 8 kilometers, is the form of BT financing, the construction of up to nine parties, respectively, the property owner, the owner of the construction period, project management company, investment supervisor, engineering supervision, construction supervision and management, the construction company, the construction company, the construction company, the project manager, the project manager, the project manager, the project manager, the project manager, the project manager, and the project manager. Investment supervision, engineering supervision, four construction units.

Because of the many construction units, especially by the financial crisis, the BT party financing is blocked in the case of rush, the construction of the parties to the conflict is prominent, to the supervision of the coordination of the work has brought great challenges, the construction of technical difficulties for the main deep pit excavation and support, local pit depth of up to 9 meters, which pit safety has become one of the focus of the work, pit support is divided into bored piles and Larsen steel sheet piles. In the form of third-party pit monitoring hired by the owner, combined with the third-party test results, on-site timely treatment of large deformation of the location, daily inspection of pit deformation, experience of the two projects, the supervision of the actual work of the majority of the site, the internal work and coordination, the project supervision department is not a construction unit of the Ministry of Technology, program management is one of the priorities of the work of the supervisory staff, in order to manage a project is the first job Management of a good construction unit of several leaders, to convince people with reason and virtue, to provide quality service to the owners at the same time to help the most needy construction units, the project as their own project to manage.

Assistant Engineer Job Summary 4

I have been in the xx company x years, engaged in the safety officer, quality inspector, project manager and other work, years of experience in construction management so that I y appreciate the importance of the project department of the construction of technical management, which is to ensure that the construction of safety, quality, progress of the final purpose of the realization of the security, is now on the project management in recent years summarized as follows:

< strong> A safe production

Safe and civilized construction is vital for a project. On the one hand, through meetings, documents, briefings and other forms, so that the project personnel to establish civilized construction is also to create economic benefits of the ideological concept, for the safe and civilized construction management to consolidate the ideological basis; at the same time, the development and implementation of the project department safety management regulations, safety operating procedures and safety and technical measures plan, the organization of the new recruits to the safety of the ideological, safety and technical education on security, security organizations and safety technology to carry out job technical training, regular Organize safety skills assessment, deal with the opinions put forward by workers in time, and organize regular safety inspection of the project department. The implementation of hidden danger rectification measures to eliminate the occurrence of safety accidents; on the other hand, the establishment of the establishment of the project department safety management network, equipped with full-time safety technicians, give full play to the role of the project department personnel; monthly organization of the project department personnel to inspect the construction team, and set up a reward and punishment system, drive the full participation of safety and civilization of the construction, safety and civilization of the construction of the responsibility of the implementation of the person.

Second, quality control

Quality control is the key measure of good engineering, is the center of the construction work, as follows:

1, the establishment of a quality management system

In practice, always adhere to the "according to the design and construction of the relevant norms Quality is the root of the project, in the construction of the construction in strict accordance with the norms, found that the problem is solved in a timely manner, the quality of hidden dangers nipped in the bud.

2, the management of raw materials

Strictly require the project department of each raw material used in the project should be verified by the manufacturer of the relevant data, and through the test qualified before being put into use in the project; at the same time, the establishment of qualified manufacturers file, all with data to speak, to ensure that the qualification rate of raw materials.

3, on-site construction quality management

Requirements for the project quality inspectors to the site every day to check the unqualified items, require each team to find out the reasons for immediate rectification, while improving the measures to prevent before the event.

4, process quality management

The most basic content of quality management is process quality management, process quality management is to find deviations and analyze the constraints affecting the quality of the process, and eliminate these factors, so that the quality of the process is controlled within a certain range to ensure that the quality of each process.

Three, progress control

In order to achieve the completion of the project on schedule, clearly require the construction progress of each individual project, the plan must meet the overall target requirements, the progress of each individual project plan and construction measures must be reviewed and approved by the technical staff, and in the process of implementation of the inspection, to see whether it is in line with the design of the construction organization, and on the critical Work processes should be careful to implement construction measures to ensure that the project is completed on schedule.

Assistant Engineer Job Summary 5

I have been working in the unit for 2 years. These 2 years is an important part of my life journey. Through the lens of the past 2 years, experience from a freshly graduated students to enter the community. Employees of this environment and role change and adaptation, to thank the leadership and colleagues of my training and care, review the past 2 years, I have a lot of thoughts and experience. In the leadership of the attentive care, in the help of colleagues, through their own efforts, in all aspects have made some progress, better to complete their own work. Now the thought, work situation is briefly summarized.

First, constantly strengthen the study, and further improve their overall quality. With good political and business quality is the prerequisite and necessary conditions to do a good job.

Second, dedicated, better fulfillment of their job responsibilities. All work-oriented, subject to the leadership arrangements, and strive to familiarize themselves with the work environment and content in as short a time as possible, and conscientiously complete each task assigned by the leadership; their own work is not a long time, their own qualities and business level from the actual requirements of the work there is still a big gap, but I was able to overcome the difficulties, and strive to learn, correct attitude, and actively ask for advice from other comrades and learn, can be down-to-earth, Seriously do my job, adhere to the theory and practice, learning to apply. Not only to be able to work buried head to forget to work, but also to be able to go back to the time, every detail of the work of the check, the work of the experience to summarize and analyze, always put the interests of the company in the first place.

In these two years of work in contact with a lot of new things, produced a lot of new problems, but also learned a lot of new knowledge, new experience, so that their own ideological understanding and working ability to have a new improvement and further improve, but there are still some problems and shortcomings. First, the work of the initiative to the leadership to report to the leadership of the more, for the leadership to pay attention to think of ways less. Secondly, the professional knowledge is not fine enough, not real enough, not enough, not enough to master, make the work passive. Third, to deal with some working relationships can not be handy. In the future work, to further enhance, and strive to improve their own quality, timely correction and make up for their own shortcomings and defects, better adapted to the needs of the work.

Assistant Engineer Job Summary 6

I graduated in June 20xx, enrolled in construction engineering, and then continued in the University of specialization, in June 20xx year year successfully graduated. I have been engaged in the construction industry since 20xx, supervision department work. In these three years, I have been working in the first line of supervision of construction projects, to do the theory and practice, theory and practice combined, the business knowledge excellence, so that their professional knowledge and skills continue to improve, for the management of the project to lay a solid foundation. Now I work more than three years since the professional and technical work is summarized as follows:

First, ideological and moral

I have been very supportive of the party's policies and guidelines, care and study of national current affairs and politics, and adhere to a high standard to strictly require themselves, I can strictly abide by the laws and regulations, and can set up and maintain the correct outlook on life, values and socialist concept of honor and shame. I can abide by laws and regulations, establish and maintain a correct outlook on life, values and socialist concept of honor and shame. In recent years, I have been insisting on watching news reports and other news columns or newspapers and magazines, through the understanding of national events and people's voices, in order to better study the implementation of the party's and country's routes, policies and guidelines, and to maintain their own political awareness can be "with the times".

Second, professional ethics

In the focus on improving the ideological character at the same time, but also do not forget to pay attention to personal cultivation and professional ethics training and improvement. I have always insisted on learning about the construction project management and other aspects of the laws, regulations, rules, systems and norms, standards, to be loyal, law-abiding, honest and self-disciplined, hard work, and constantly strive to improve the quality of their work. I have always been modest and studious, study the business, dedication, serious and responsible work, strong sense of responsibility, with good professional ethics, in strict accordance with the "integrity, law-abiding, fair, scientific" principle of construction supervision and management work. Dedicated to his work, law-abiding, down-to-earth, diligent and meticulous in his work; helpful in life, united and caring for others. Able to integrate into the team, unity, play the collective wisdom and strength, **** with the work of the cause. Work actively to the company's leadership, experienced colleagues to learn construction project management experience and professional knowledge, and constantly improve their own business level, better able to perform their duties.

Third, professional skills

During the school period, I was awarded the Hubei Provincial Department of Housing and Urban-Rural Development issued by the construction worker training certificate and budgeter training certificate. I work in the process of continuous refueling and charging for their own, participated in the training and assessment of supervisors, supervisors continue to re-education. Seriously study the relevant laws and regulations, professional and technical knowledge, can be closely linked to the theory and practice, with theory to guide practice, and summarize the work experience in practice, in order to enrich their theoretical level, achieved twice the result with half the effort.

In recent years, I have systematically study the theoretical knowledge of the profession, adhere to the work in the first line of construction supervision, focusing on theory and practice, mastered a number of construction engineering professional skills.

Fourth, work achievements and fulfillment of duties

Since joining the work, I have been insisting on the first line of supervision of construction projects, participate in the construction of a number of projects, including the city of the district project, the plant, Wuzhou City, Fuxing Times Square 5 # building, the city of renovation projects. In addition, independent site supervisor of the project are, after the building project, apartment, production workshop. In the actual work, I always maintain a conscientious and responsible, rigorous and pragmatic attitude to work, study hard with an open mind, and constantly strengthen the theoretical knowledge, improve the level of professionalism, after three years of exercise, has grown into the backbone of the project site supervisors.