Linear guide is best placed horizontally, if placed 45 degrees diagonally, the guide is easy to bend.
Linear guide installation mode: horizontal installation mode and vertical installation mode two. The following is an example of the above silver linear guide for you to talk about the guide rail assembly method.
Taiwan on the silver linear guide assembly:
1, horizontal installation method
Standard horizontal installation is the simplest way of assembly. It can maintain high precision and accuracy when subjected to shock and vibration. And easy to install, easy to dismantle the equipment as well as the upper silver rail, clear, maintenance and so on.
①Horizontal pressure fixing This is the simplest application method to solve the shock and vibration
②Screw fixing When our installation is limited by space, screw fixing is used, and the number of screws can be increased when needed.
③Tapered block fixed because of the angle of the tapered block will produce horizontal pressure
④Pin fixed, we generally do not use this method, in general, the installation of the rail by the screws will be fine. If the pin is installed, it is very difficult to maintain and clean in the later stage.
2, vertical installation
General vertical installation is also to be fixed by screws, but not good to run the horizontal pressure to carry on the parallelism of the silver rail, the installation of screws, may be due to uneven force, resulting in the use of 2 parallel to the total height of the guide rail tolerance is relatively large, the impact on the accuracy of the equipment. Then because the vertical force point is not the same, this will cause the upper silver guide rail easy to damage, and for the load force is not good to calculate. May be due to the problem of load, resulting in damage to the guide rail.
The last point, Dongguan Qiwei electromechanical talk about inverted installation, in this case, the force is inverted vertical, Dongguan Qiwei electromechanical example, itself HGH35CA on the silver rail dynamic load is 600KG, however, because it is vertically mounted, in the operation of the equipment, but also to calculate the vertical direction of the vertical force as well as the vertical force of the machine's own weight, in this case, the customer selection, the best! According to the upper silver rail information above the load multiplied by three times the load selection, so as to ensure the normal operation of the equipment as well as life.
Qiwei re-emphasize one point, for the combination of Taiwan on the silver rail form, in the installation, the base part must be flat to ensure that within 2 silk, one side of the side of the bed as a reference side, one side of the installation while playing the table, while the other should be installed with a good one as a reference rail, installation. After the installation of the upper silver rail, to test the 2 upper silver rail isometric (generally in the C level of the upper silver rail within 3 silk is considered normal), as well as their walking parallelism. To ensure the correct installation of the rail.