Hospital logistics staff work summary sample (selected 6)
A period of time in the work has come to an end inadvertently, this is a period of precious work time, we have gained a lot of time to write a good work summary, analysis of the work of the past period of time. But how to write a work summary to be outstanding? The following is my compilation of hospital logistics staff work summary sample (selected 6), for your reference and reference, I hope to help friends in need.
Hospital logistics staff work summary 1
Logistics Department in the hospital leadership of the correct leadership and help, in the relevant brother section of strong support and assistance, the Logistics Department to overcome the difficulties of fewer staff, things mixed, this year for the hospital to do a lot of work.
First, the work of dealing with emergencies
Due to the aging of the hospital pipeline and man-made and other reasons, the front building and the back of the building of the sewage pipeline and the heating pipeline is often clogged and pipe bursting and other accidents. After the discovery of the situation, we will immediately organize the relevant logistics personnel to repair, can in the shortest possible time to deal with the problem, to protect the orderly conduct of medical work. These include the occurrence of several roof leaks on the first floor and the bursting of heating pipes in the operating room on the first floor, as well as the bursting of heating pipes on the back four floors.
March 4 of this year, more than 12:00 midnight, due to the patient's family drunken trouble, the hospital a door glass broken, I received a call immediately after the hospital to understand the situation, and do a proper treatment. The damaged door was repaired on the 2nd day, and the normal work of the hospital was not affected because of the damage to the glass.
Second, energy saving and water, electricity, fire safety management work to strengthen
The arrival of winter, so that the hospital's electricity consumption increased significantly, due to the increase in the use of warmer, electric heater, water heater, etc., so that part of the hospital's electric gate super-negative combination of the use of a serious burned. It also caused impact and harm to the work of some departments. According to this situation, in February this year, we re-formulated the electricity, water, fire safety system, were issued to each section. And the whole hospital has a heater, electric heater, water heater and the equipment that uses electricity to do the registration. in September we did a comprehensive inspection of the facilities of all departments of the hospital. Part of the electric switch, lamps, and patients hot meal location of the wire and other places have been replaced and repaired, eliminating unsafe hidden dangers.
In July, we used the barrel of water in the hospital to strengthen the management of refinement, and replaced the manufacturer, from the original 6.50 yuan per barrel modulation to the current 5.50 yuan per barrel, the use of barrels of water from the original unified storage, to the current distribution to the various floors, for the departments to lay the foundation for a separate accounting. Only barrels of water and physical examination with bottled water a year for the hospital to save money about xx yuan.
In addition, we also need to purchase some daily supplies for the departments to do staff, tap the potential of the hospital's internal items to reduce unnecessary expenditures. Logistics is a very important part of the hospital work, is a complex systems engineering, with the deepening of health reform, the establishment of a socialist market economy, the reform of logistics is imperative, based on their own, change the concept of awareness, change the hospital want me to serve as I want to serve the hospital, to grasp the people-centered management, is the key to the work of the hospital logistics support. Only people-oriented to cultivate the staff's sense of ownership, and effectively play the staff's initiative, creativity, and establish a "patient-centered" sense of service, in order to comprehensively improve the level of logistical services, and promote the synchronization of logistics and medical development.
In the year of xx, under the leadership of the hospital department, I actively participate in the hospital's political thinking, business learning and hospital, outside the activities, and the organization of the undergraduate staff to carry out a number of planned political learning and related business learning, to improve their own ideological understanding and service skills, and conscientiously complete the work of the hospital department of the work tasks, enthusiastic service in the hospital departments, in the new situation, based on their own work, awareness, transformation, and the development of the logistics and medical synchronization development. Based on their own work, raise awareness, change the concept, bearing in mind the principle of logistics around the clinical turn, proactive and relevant personnel in my department to the departments to do a good job of service.
This year, in order to save money, things as much as possible, according to each person's strengths and skills, the organization of the relevant personnel, do-it-yourself production of the case shelves, drug storage racks, financial security bar, the drugstore security bars, patient first aid trolleys, TV racks, examination beds, diagnostic treatment beds, medical instrument carts, etc., sewing; surgical gowns, hand-washing clothes, surgical bag cloths, quilts, mattresses, pillows, bedding, such as singles. According to the market price, for our hospital to save money this year nearly 20,000 yuan, in the logistics management, the logistics departments to implement the optimization of the combination, staff reduction and efficiency. For example: the original boiler room operation has 7 people, water room 1 person, the combination of operation, set up 6 people can be.
Laundry original two people, the implementation of the next collection, the next delivery, in order to ensure the quality of cleaning under the premise that the damage is not found in a timely manner to repair, to increase the number of service projects, case personnel and management of goods accounts, the management of bills, boiler management personnel and the issuance of goods, water supply and drainage systems and machinery and other maintenance work, janitorial and management of the destruction of medical waste and the hospital's daily sanitation, etc., the trolley driver in the case of the car does not affect normal participation in logistical maintenance and other work, the work of the company is not a good idea. In the annual power, heating, water supply and drainage, electricity and other systems of maintenance, comprehensive governance, security, fire safety, hospital environmental health, hospital green, landscaping, consultation, publicity, oxygen, supply of goods, equipment installation and maintenance, metering, communications, vehicle management, doors, windows, glass, medical waste management and other work, can be highly responsible to implement the completion of the work. I have a high sense of responsibility to implement the completion of the work. And participate in the hospital general duty and hospital infection work.
Hospital logistics staff work summary 220xx year in a busy and fulfilling through, in general, a year, I share the management of the work of the more, the work of a wide range of tasks, heavy tasks, great responsibility, as I correctly understand the leadership of the work of the deployment of the better fulfillment of the duties as an administrative position and as a professional and technical positions, play a leadership and management and organizational and coordinating capacity, fully mobilize the staff's work enthusiasm, better fulfillment of the responsibilities as an executive and as a professional and technical positions. Work enthusiasm, better completed the whole year in charge and co-management of the work task.
Now a brief review of the summary is as follows:
First, grasp the logistics management, and vigorously enhance the level of service
The logistics management work involves a wide range of miscellaneous, a year we strengthen supervision and management to enhance the level of service as a guide, from a variety of aspects, and strive to do a good job of logistics work.
I am mainly responsible for the office supplies warehouse management and life logistics support work, can do a planned and timely requisition of office supplies, do not waste, no excessive inventory and so on. For the sections to do a good job of service, in a timely manner, quality and quantity of office supplies needed to send to the sections. Monthly inventory, familiar with the library items, clear.
Office equipment and daily life failures and problems can be dealt with in a timely manner, can not be dealt with when the professionals to deal with, so as not to interfere with the normal operation of the work. In the logistical work of the support and cooperation of colleagues. Through our efforts to cooperate, successfully completed the XX year of logistics and warehouse management work.
Second, vehicle management and maintenance
This year, we reformed the car system, unified scheduling management, so that the car has an application, return to the car has a record of the workflow; at the same time, the vehicle oil has also developed a relevant supervision process, to rule out the occurrence of private use of public vehicles.
In the safe operation of the vehicle we signed a car with the driver safety responsibility to ensure the safety of the car, to comply with traffic rules. In order to ensure the normal operation of the work, strengthen the vehicle management, do a good job of the normal maintenance and repair of the vehicle, for the work of our hospital to provide a better service.
Third, do a good job of the hospital health work to create a beautiful environment to do a good job of security
The two health workers to carry out a profound, humane ideological training and specific work details and responsibilities of training and guidance. The development of the relevant health responsibility system, the requirements of the daily turn more, often sweeping, diligent wipe, at any time to find problems in a timely manner. Weekly sweep, weekly check.
To the hospital sheets and covers and other medical supplies and staff uniforms in a timely manner, classification, clean washing, drying, distribution and other work.
The hospital security personnel, security defense, electricity, fire, waterproof training, strengthen the security consciousness, to do when reminded and often check.
Four, to assist the office, conscientious and responsible
In the office is mainly with the director of the office to complete the daily work of the hospital, do a good job of clerical statistics, better completed the leadership of the office of the health and reception work. In the hospital with the rich and colorful activities, active staff cultural life, to create a healthy and harmonious corporate humanities environment, to promote corporate culture, smart civilization recommendations, show our hospital positive spirit.
Fifth, graphic design network promotion
As I have studied some related knowledge and skills, so in the unit is temporarily short of graphic designers and network engineers, I strive to learn the relevant professional knowledge, with the heart to do a better job in this area. I believe that after our office members *** with hard work and study, will certainly make progress in these areas and make achievements.
Six, strengthen the market publicity efforts and management
This year's advertising and publicity in the form of a variety of radio, newspapers, television, Internet and ground marketing. Ground marketing has physical examination, magazines, calendars and hanging promotional signs in the countryside.
Physical examination is mainly done in March-August, the effect is not bad, but because of the whole environment and other aspects of the impact of the physical examination activities to September on the suspension.
The village hangs publicity signs, a wider radius, the effect is also good, through the understanding that some patients are through the village to see the publicity signs after the call to consult.XX *** hung 1266 signs, we hang the signs taking into account the source of the patient's situation, the city and the four counties are divided into the heavy side area; we try to take into account the publicity signs in the selection of the location of the life of the long term and eye-catching, so require the responsibility of the staff of the sign. Therefore, we ask the staff to treat each sign responsibly, so that every family is willing to let our hospital to hang the sign and can do a good job to protect the work. Hang to the high place easy to see, not easy to be damaged place, mostly for the villagers of the house hilltop, do a good job of long-term maintenance and replacement work. At the same time we are hanging, but also doing face-to-face publicity work with people, wherever we go, can make the surrounding villagers to leave a good impression on us, to do the village has our hospital billboards and publicity.
Hospital logistics staff work summary 320xx year is about to pass, our logistics department in the hospital leadership of the correct leadership and help, in the relevant brother departments vigorously support and assistance. Our logistics department overcame the difficulties of fewer staff, miscellaneous things, and did a lot of work for the hospital. Also better completed the logistics of the year's work, now summarized as follows:
First, the work of dealing with emergencies
Due to the aging of the hospital pipeline and man-made and other reasons, the front and back of the building's sewage pipeline and heating line from time to time there is a blockage and pipe bursting and other accidents occur. After the discovery of the situation, we will immediately organize the relevant logistics personnel to carry out emergency repairs, can be in the shortest possible time to deal with the problem, to ensure the orderly implementation of medical work. This includes a number of roof leaks on the first floor and the bursting of heating tubes in the operating room on the first floor, as well as the bursting of heating tubes on the fourth floor.
This year's x month x day of midnight more than 12 o'clock, due to the patient's family drunken trouble, the hospital a gate glass broken, I received a call immediately after the hospital to understand the situation, and do a proper treatment. The next day the damaged door was fixed, and the normal work of the hospital was not affected by the damage to the glass.
Second, energy saving and water, electricity, fire safety and maintenance of the enhancement
The arrival of winter, so that the hospital's electricity consumption clearly increased by (in the heater, electric heaters, water heaters, etc. to increase the amount of use, so that part of the hospital's electric gate super-negative combination of the use of a serious burned. Also to part of the work of the department caused by the impact and harm. According to this situation, we have reformulated the system of electricity, water and fire safety in this year, which were issued to each department. And the whole hospital has a heater, electric heater, water heater and the use of electricity in large equipment one by one to do the registration. x month we have done a complete 'large-scale investigation of the facilities of the hospital's various departments. Part of the electric switch, lamps, and the location of the patient's hot meal wires and other locations have been replaced and repaired, eliminating unsafe hidden dangers.
x month, we used the barrel of water in the hospital to enhance the maintenance of the refinement and replacement of the manufacturer, from the original 6.50 yuan per barrel modulation to the current 5.50 yuan per barrel, the use of barrels of water from the original unified storage, to the current distribution of the floors, for the departments to lay the foundation for the separate accounting. Only barrels of water and medical examination with bottled water a year for the hospital to save money about xx yuan.
In addition, we also need to purchase for the departments of some of the daily necessities to do staff, tap the potential of the hospital's internal goods, reduce unnecessary expenditure.
Hospital logistics staff work summary 4
When the silk coolness and gusts of cold wind accompanied by, when pieces of yellow leaves and points of white frost depend on each other, xx year hospital work in a period of pay and smile harvest. Logistics section, under the leadership of the hospital superiors, under the hard work of all employees, comprehensively around the protection and internal construction of the two major tasks, seriously organize logistics services, creating a quiet, harmonious hospital atmosphere; carefully carry out logistics work, improve the relevant rules and regulations, and strive to grasp the internal team building, and achieve more outstanding results, specifically in the following areas:
Second, carefully carry out the greening project, vigorously chemical hospital The main work is: the first half of the completion of the hospital green belts and sidewalk boards along the stone transformation, the second half of the completion of the prevention and treatment of termites. Following the completion of the square greening in front of the elderly building, the greening of the front lawn of the outpatient building and the renewal of the sidewalk board project immediately. Our Section carefully supervised the construction process and did our best to complete the work in only two months. Aiming at the characteristics of termite reproduction and growth, our department is soberly aware of the great harm of termites to the patients' body and the strong threat to the hospital's chemical beautification, and actively carries out the prevention and treatment of termites, which removes the obstacles to the protection of the hospital's chemical industry. Three, to adapt to the development trend of the hospital, and strive to optimize the work of the canteen First, in order to reduce operating costs, the implementation of the canteen contracted to strengthen the supervision of the food. xx years ago, the hospital canteen has been taken in the form of self-management, manpower and material resources to invest in the larger, higher operating costs. In order to change this situation, it was decided by the hospital office that the canteen would be contracted out this year. My section responded positively to this decision, coordinated and cooperated with the relevant work, supervised the accounts of the cafeteria, and set up a hospital catering committee. In the first half of the year, the department **** held three meetings to discuss the issues involved, providing timely and effective feedback to patients and urging the cafeteria to improve its food in a timely manner. From the current operational situation, basically achieved the purpose of reducing costs, guaranteeing supply and improving the level of food. Secondly, the original boiler room was dismantled and the north wall was repaired. In March, I organized the demolition of the original boiler room, in June to repair the north wall. Not only to ensure the safety of construction, but also to achieve the purpose of the best use of materials. In addition, according to the characteristics of our hospital, there are more than 200 elderly people and more than 100 mentally ill people eating in the cafeteria. In order to ensure that the work of the cafeteria is carried out safely and smoothly, our section has improved the relevant rules and regulations and upgraded the internal management level. Build rules and regulations, the establishment of a sound mechanism of constraints, to strengthen the staff's understanding of the job responsibility system; fulfill their duties, do a good job of preventive supervision, to prevent food hygiene and safety accidents; according to the law, the serious investigation and punishment of disciplinary disorder personnel. Fourth, adhere to the post, timely completion of the maintenance of any The hospital site is large, the number of departments, making the maintenance work complex and heavy. However, the members of my section overtime, hard-working, on-call, in a timely manner to complete a variety of sporadic maintenance tasks in the hospital, to ensure that the water, electricity and air conditioning in place in a timely manner, lights and other facilities and equipment for the effective operation. Fifth, based on their own duties, and actively do a good job in the procurement of materials Whenever the Spring Festival, Dragon Boat Festival, Mid-Autumn Festival and other major festivals, the Logistics Section actively do a good job in the procurement of these major festivals and welfare materials and distribution. Six, innovation, maintain a positive mindset In order to make the hospital work can be carried out smoothly and efficiently, to ensure the smooth operation of the hospital water and electricity equipment to protect the hospital water and electricity use of the safety of the Section this year to send two water and electricity work professional training, and reflect good. In the words of Asia's richest businessman Li Ka-shing: "Watch the world with your own eyes, always maintain a sense of innovation!" Logistics work is complicated and heavy, involving a wide range of influence. But logistics is essential and vital. However, I believe that through the efforts of my section, logistics staff will work seriously, upwardly mobile, and add color to the work of the hospital! Our company was formally stationed in xx hospital on February 21, xx, for the hospital to provide ward environment cleaning, hospital security guards, specimen delivery and other related logistics support services. Since the station, in order to do a good job of logistics management services, to achieve quality services and hospital services to meet the requirements of satisfaction, all of our company's logistics staff to forge ahead, innovation, unity and cooperation, serious and hard work, to complete the work of the task, and achieve good results. Now the xx year logistics management services are summarized as follows: First, establish a sense of service, seriously do a good job of logistics management services As our logistics workers to firmly establish a sense of service to "strive to do hospitals satisfied with the logistics" as the goal, fully mobilize the work of each logistics workers. Fully mobilize the enthusiasm of each logistical staff, with a pragmatic style of work, with the innovative development of the work of the idea, the implementation of fine management, standardized logistics services; through the efforts of hard work, serious work, the logistics work to a new level, to obtain the satisfaction of the service object. Second, strengthen the learning and training, to create a good business logistics management service team We logistics workers to study hard, improve their political awareness, change their mindset, establish a sense of service, and to do a good job in all logistics services. To strengthen the learning and training of business knowledge and business skills, and effectively improve the level of logistics service work. We should fully recognize and affirm the status and role of logistics management services in the hospital work, correctly recognize their own value, establish self-improvement, self-esteem, self-esteem of the psychological, enhance the sense of pride and responsibility to do a good job of service work, and give full play to its due role. Three, to strengthen the scientific management, to provide quality logistics management services 1, do a good job in the ward environment cleaning and other logistical management services Our logistics staff seriously responsible and meticulous to do a good job in the ward environment cleaning work, to maintain the cleanliness of the wards for the patient to create a good and comfortable medical environment. While doing a good job of cleaning the ward environment, the various types of daily infrastructure to do regular inspections, found that the problem of timely rectification, to ensure that the infrastructure is intact, to play the biggest and best potential for patients to provide medical care, life protection. xx xx inpatient building opened on 13 xx, our services extended to 2 # inpatient building, dedicated to do a good job of logistics management services, so that the xx inpatient building logistics management services on a new level, to obtain the majority of patients' satisfaction. In order to further improve the hospital's logistics services, our company set up a central delivery center on March 22, xx, to improve the logistics support service capacity, to provide strong support for the clinical front line. 2, strengthen the safety and security, build a harmonious hospital Our company to improve security awareness, strengthen security, and strive to build a harmonious hospital. (1) to establish and improve the corresponding rules and regulations, improve the emergency response plan for emergencies, establish and improve the implementation of rules suitable for hospital safety management, strict implementation of the system, the implementation of accountability, rewards and punishments. (2) the establishment of a sound safety inspection mechanism to strengthen the supervision of hospital safety, inspection and rectification of hidden dangers, to ensure that the hospital is safe, without any safety incidents. (3) Strengthen the inspection of safety infrastructure, fire facilities, anti-theft devices and other safety infrastructure to continuously improve, to ensure that nothing is wrong. (4) Grasp the daily inspection and hidden danger investigation. Regular initiative to carry out safety self-examination and self-correction, focusing on checking whether the power supply, electrical circuit, electrical equipment, etc. is safe; fire extinguishers, hydrant water belt, safety alarm equipment is intact; doors, windows and safety precautions are intact; duty system and duty personnel are implemented; electricity, fire, gas is standardized, found hidden security problems immediately supervise rectification until acceptance. (5) to strengthen the duty watch, strict reporting system. Important parts of the hospital, strictly adhere to the daily inspection and 24-hour on duty system; in the national important holidays and major activities, major events and special weather conditions, adhere to the 24-hour on duty and daily zero reporting system to ensure hospital safety. 3, saving water and electricity resources, to eliminate waste Water and electricity are important resources, is to ensure that the hospital's normal working and living order is essential to the material conditions. In order to save water and electricity resources, to eliminate waste, our company reasonable and scientific water and electricity. (1) to strengthen publicity to raise awareness of conservation, water and electricity are commodities, to practice economy, care of all water and electricity facilities, do not waste a drop of water, a degree of electricity, everyone takes the initiative to eliminate the constant flow of water, long lights and other running, bubbling, dripping, leaking waste phenomenon. (2) to strengthen the water and electricity inspection, to eliminate waste, set up a person on the whole hospital water and electricity and public **** regional water and electricity facilities to patrol, to ensure that everyone saves water and electricity, to eliminate the phenomenon of "running, risking, dripping, leaking" phenomenon, and at the same time, to strengthen the analysis of energy efficiency, energy-saving digging, energy-saving supervision and other all-round management. Four, the establishment of emergency plans to ensure the stable development of logistics management services In order to ensure the stable development of logistics management services, to prevent the emergence of unforeseen circumstances and accidents, our company in the management of the establishment of an emergency plan, through the study of the emergency plan and drill, basically mastered the essentials of the emergency plan. In the emergency plan, our company especially formulated the human resources related emergency plan, in order to promote the re-employment project and social harmony and stability to make greater contributions. Fifth, the direction of future efforts In order to further improve the work of logistics management services, improve the quality of service, to obtain everyone's satisfaction. Our company in the future: (1) to strengthen the construction of style, vigorously promote and advocate the good style of hard work, honesty and public service as the theme, and constantly improve the style of thinking and work style of logistics workers, to do a good job in a serious, diligent, responsible attitude to do a good job in every logistics, logistics work to create new achievements. (2) to develop assessment methods to incentivize advanced. Our company should be based on the continuous development of the new situation, combined with the actual work, the development of appropriate assessment methods, incentives for advanced. Assessment methods to fully reflect the principle of workers more work more pay, and resolutely put an end to do more or less, do a good job or a bad job of a disease, motivate workers full of energy, serious hard work, the courage to fight for the advanced, in the logistical management service work to make new achievements and achieve new results. xx year, our company although serious efforts, hard work, in logistics management services have made certain achievements, monthly hospital service satisfaction assessment average score of 95 points, but compared with the situation of the leap, compared with the patient's increasing service requirements, our company is still not a small gap, the need to continue to work hard to improve and improve. In the future, our company will continue to work hard, deepen management, hard work, logistics management services to a new level, really do quality service, to get the hospital and all the patients really satisfied. Hospital logistics staff work summary 6 Time flies, xx year in the busy and fulfilling through, a year, the work of the general affairs of the more work, a wide range of work, the task is heavy, due to the better fulfillment of the duties of everyone, play their respective advantages, better complete the director of the Department of all the work tasks assigned. Logistics management work touches a wide range of miscellaneous, a year to strengthen the supervision and management of the General Affairs Section, to enhance the level of service as a guide, from various aspects, and strive to do a good job of logistics. First, the political and ideological Study carefully, strengthen their thinking and worldview of the transformation, so that their ideological and political to keep pace with the times, to strengthen their own political and ideological quality of the construction, support for the socialist system and the party's policies, and decisive implementation of the unit of the rules and regulations. Second, the work I am mainly responsible for warehouse management and logistical support work, can do a planned and timely requisition of office supplies, so as not to waste, no excessive inventory and so on the occurrence of the situation. For the sections to do a good job of service, in a timely manner, quality and quantity sent to the sections of the required office supplies. Monthly inventory, familiar with the library items, clear. In the equipment and apparatus failure and the topic can be dealt with in a timely manner, can not deal with the professional staff to deal with, so as not to delay the normal operation of the work. I have a year in the logistics work in the support of colleagues and cooperation. Through our efforts to cooperate, the successful completion of the xx year of logistics and warehouse storage work. Third, the main problems To further study the theoretical knowledge, further improve the working methods, improve the effectiveness of the work, so as to improve the ability to work. In the work of the leadership of the completion of various tasks, but in practice I still have a lot of shortcomings, mainly in the theoretical learning is not enough, the idea of familiarization to further progress; work experience is not enough, in the actual work of some bends, the effectiveness of the work needs to be further improved. In the future work, I will continue to strengthen learning under the leadership of the section and the help of colleagues to further improve the ideological awareness and business quality. At the same time, in the future work of the leadership and colleagues can teach more personal experience, and thus avoid mistakes in the work, improve the effectiveness of the work. In the future, I will work in the work of the post, conscientious, to assist the leadership to get good logistics. For the construction of the unit to do their part. In the new year I set a new goal for myself, to learn from other colleagues, to build on their strengths and avoid shortcomings, mutual exchange of good work experience, *** with progress, but also around the center of the hospital's work, a clear personal responsibility to do their jobs, to get a good reconciliation, as a good adviser, get a good service, work closely with the better completion of the work of the 20xx year tasks.