The definition of remodeling is to change the layout of a building that can be changed to achieve the effect we want.
What does remodeling include?
Decoration mainly includes two aspects:
1, workers construction 2, decoration materials
1, workers construction usually refers to the construction staff, which is common, electricians, painters, carpenters, bricklayers, masons, handymen and so on. The price of labor because of regional differences, here is not a detailed description.
2, decoration materials, including too many things, which can be divided into the main part and auxiliary parts, a simple list of a few, carpentry boards, latex paint, floor to floor, wood flooring, cabinets, doors, lamps and lanterns, kitchen utensils, sanitary ware and so on. Auxiliary materials include, conduit, corners, corners, lines, elbows, direct, glue, sandpaper, nails, straight nails, carpentry nails, cement, sand, bricks, and so on.
What is not included in the decoration?
This question is actually very simple, as long as you think about the concept of renovation and decoration. Simple example: all electrical appliances are not included in the decoration, such as TV, air conditioning, refrigerator and so on. In a direct description of it, the decoration workers can do out called decoration, can not do, but then must have called decoration.
How much does it cost to decorate 200 square meters?
This question is not easy to answer, first of all, there are regional differences, the price of labor and material prices will change, I list a complete set of decoration budget for you to see it.
Detailed work list
A Living room, dining room and aisle, entry garden project Area Material cost Labor cost
Floor project
1 800 * 800 glass floor tiles supply and paving square meters 43.3 68 33 101.00 4373.30 (Subtotal)
Materials: 800*800 glass floor tiles (40 yuan /pi), cement from big factory, river sand, including installation
2 Supply and installation of special kicking corner line for floor tiles m 39.1 12 12 24.00 938.40 (Subtotal)
Practice: ordering special kicking corner line
Ceiling project
3 Light steel keel gypsum board styling ceiling of guest dining room sqm 10 35 35 70.00 700.00 ( Subtotal)
Practice: "Taishan" paper gypsum board cover, card-type ceiling light steel keel, 6MM reinforcement, steel expansion
4 Living Room Decorative Lamp Slot Supply and Production m 13 11 8 19.00 247.00 (Subtotal)
Practice: "Taishan" paper gypsum board cover, card-type ceiling light steel keel, 6MM reinforcement, steel expansion
5 Entrance Garden Tertiary Roof m 13 11 8 19.00 247.00 (Subtotal) 5 Entry garden three levels of roof meters 13 62 40 102 1326 (subtotal)
Practice: "Taishan" paper gypsum board cover, card ceiling light steel keel, 6MM rebar, steel expansion
Walls and carpentry works
5 living room TV backdrop production works square meters 10.332 180 100 280.00 2892.96 (subtotal)
Practice: carpentry board base, wallpaper finish, tiling, etc.
6 Living room TV back wall decorative partition production meters 2.4 90 30 120.00 288.00 (Subtotal)
Practice: carpentry board base, Sabbia panel for varnish
7 dining room decorative display cabinet production square meters 2.976 280 260 540.00 1607.04
Practice: carpentry board base, sapele panel for varnish
8 Top cover gypsum board square meter 0.496 65 30 95.00 47.12
Practice: wood strip base, gypsum board cover.
9 Entry hollow shoe cabinet production project meter 1.2 120 350 470.00 564.00
Practice: carpentry board base, veneer for varnish
10 Shoe Cabinet Art Glass Installation square meter 2.3 180 0 180.00 414.00
11 Sundry Cabinet Production square meter 1.8 160 260 420.00 756.00
Practice: carpentry board base, Sabbia panel for varnish
12 Demolition of square meters 18 40 20 60.00 1080.00
Practice: labor, leveling
Subtotal: 15233.82
Subtotal: 15233.82
Two Master Bedroom, Second Bedroom 1 and Second Bedroom 2 Project
Flooring Project
1 Floor leveling and paving wood flooring square meters 37.5 88 30 118.00 4425.00
"Emeishan" brand 32.5 mineral silicon cement + medium sand + labor costs. Wooden flooring is 1.2 reinforced
Wall and woodwork works
2 Master bedroom closet production works (2.4 high) square meters 5.76 168 150 318.00 1831.68
Practice: carpentry boards at the grassroots level, veneer boards for the varnish
3 Wardrobe sliding door square meters 5.76 240 1382.4
4 Wardrobe Top cover gypsum board square meters 0.96 60 30 90 86.4
Practice: wood strip base, gypsum board cover.
5 Second bedroom 2 high and low bed production engineering frame 1 0 0 2000.00 2000.00
Practice: carpentry board base, veneer for varnish
6 Second bedroom 2 storage cabinets square meters 2.5 150 150 300.00 750.00
Practice: carpentry board base, veneer for varnish
7 Second bedroom 2 Computer desk meter 1.5 120 280 400.00 600.00
Practice: carpentry board base, veneer for varnish
8 study tatami meters square meters 2 160 20 180.00 360.00
Practice: wooden keel raised 60CM
9 study room bookcase square meters 12 160 260 420.00 5040.00
Practice: carpentry board base, veneer for varnish
10 study computer desk m 1.5 120 280 400.00 600.00
Practice: carpentry board base, veneer for varnish
Subtotal: 17,075.48
Three Door and Window Project
1 Entry door set Supply and installation meter 5.6 0 70.00 392.00
2 Finished solid wood door, door set supply and installation set 3 780 0 780.00 2340.00
Practice: customized finished solid wood door
3 Door locks, hardware supply and installation set 3 150 150.00 450.00
Hardware brand:
4 Supply and Installation of Art Glass Door for Bathroom Sqm 7.37 300 50 350.00 2579.50
5 Integral Sliding Door for Study Sqm 6.4 300 50 350.00 2240.00
6 Manufacture and Installation of Drift-window Sill Plate Sqm 10.35 180 40 220.00 2277.00
Practice: Stone Veneer
Subtotal: 9886.50
Four Kitchen and Bathroom Works
1 300*300 Anti-slip Floor Tile Paving Sq.m. 15 63 35 98.00 1470.00
Materials: 300*300 Anti-slip Floor Tile, Cement of Emei Big Factory, River Sand, Including Installation
2 300*450 Wall Tile Paving square meters 72.8 63 35 98.00 7134.40
Materials: 300*300 non-slip floor tiles, cement from Emei factory, river sand, including installation
3 300*300 aluminum buckle plate ceiling square meters 15 60 22 82.00 1230.00
Practice: 300*300" Trida" Aluminum Button Board 0.5 thick
5 waterproofing production square meters 65.4 11 4 15.00 981.00
Practice: polypropylene membrane waterproofing, the height of 1500mm
Main bathroom dismantling square meters 5.7 40 20 60.00 342.00
Practice: labor, leveling
Subtotal: 11157.40
V Emulsion paint and painting works
1 Wall emulsion paint supply and finishing sqm 324 5 10 15.00 4860.00
Practice: Leshan Steel Jade putty base layer, sanding, Lipang special primer primer, the surface of the rolled three times the latex paint
Brand: Dulux pure flavor wall paint
2 Wallpaper supply and installation sqm 6 40 0 40.00 240
Practice: Leshan Steel Jade putty base, sanding, sealing oil, special glue, wallpaper tiling
3 Woodwork varnish supply and finishing sqm 75 20 15 35.00 2625.00
Brand: "Bauhinia "Polyester Varnish"
Subtotal: 7725.00
6 Lighting Works
1 Supply and Installation of Downlight 13 0 7 7.00 91.00
Brand:
4 Supply and Installation of Ceiling Light 9 0 20 20.00 180.00
Brand. >
5 T4 lamp supply and installation m 13 0 0 10.00 130.00
Brand:
Subtotal: 401.00
Seven Overall Cabinets
Floor Cabinet m 3.53 480 1694.40
Hanging Cabinet m 1.5 360 540.00
Subtotal: 2234.40
Seven plumbing and electrical renovation works
1 All the power supply branch line supply and laying meters 80 20 10 30.00 2400.00
Materials: 2.5mm2 and 4mm2 copper core wire, auxiliary materials (concealed box, direct, tee, elbow, metal hose, etc.)
Practice: PVC pipe threading
Brand: power line (Chuanchuan), power line (Chuanchuan), power line (Chuanchuan).
Brand: power cord (Chuan cable factory), PVC pipe (multi-connected)
2 standard five-hole power socket supply and installation of 12 7 7 14.00 168.00
Brand: "TCL" engineering series
3 switch supply and installation of 8 7 7 14.00 112.00
Brand: "TCL" engineering series
7 Weak Electricity Reconstruction Project Item 1 0 0 0.00 0.00
Practice: PVC pipe threading,
Brand: Amp "AMP" network cable
7 Waterway Reconstruction Project Item 1 0 0 0.00 0.00
Practice: Multi-linked PVC, PPR pipe
Subtotal: 2,680.00
8 Total (I+II+...... IX) 66394
IX Cost of renovation work: 66394
I can only provide a budget to show you for a 200 square meter house because this is something that no one can answer.1,Without looking at the site, 2, without looking at the drawings, this cannot be answered. Is there a demolition part? Is there a kichu section? How many molding walls? Strong and weak changes such as? This is not clear. All can not answer!
Well~ please give points! I'm tired~