Mechanic Apprentice Job Description

Mechanic Apprentice Job Responsibilities

In our ordinary daily life, people use to the job duties of the increasing occasions, job duties have to improve the internal competition vigor, better find and use the role of talent. Job responsibilities in the end how to develop the appropriate? The following is what I have organized for you mechanic apprentice job duties, welcome to read, I hope you can enjoy.

Mechanic Apprentice Job Description 1

Mechanic Job Description Table of Contents

I. Job Responsibility

II. Job Tasks

III. Production Dispatch for Mechanic

IV. Four Stages of the Mechanic's Work

(1) Pre-preparation stage

(2) direct preparation stage

(3) work implementation stage

(4) shift handover stage

V. Safety and civilization standards for mechanics

VI. Basic quality requirements for mechanics

Appendix: Maintenance Worker Work Instruction Sheet, Maintenance Work Record Sheet.

Mechanic Job Description

I. Job Responsibility:

To complete the company's arrangement of the equipment maintenance and repair work, to ensure that the normal operation of the whole plant machinery and equipment.

Second, the work task:

1, in the specified time, the use of the company's current effective maintenance manual in the method, technical requirements or implementation of the guidelines, with the completion of the company's normal equipment overhaul program (major, medium repair), daily maintenance and temporary repair equipment repair work.

2, according to the company's equipment lubrication and other maintenance regulations, to complete the equipment lubrication and more complex equipment maintenance work. Under the premise of ensuring the quality of equipment overhaul, do a good job of repairing and utilizing the old parts of the available equipment. Cooperate with the renovation and renewal project, complete the company under the equipment renovation, installation and commissioning work. Responsible for the maintenance and storage of tools, gauges and maintenance equipment. Completion of other tasks assigned by the leadership.

Third, the mechanic production dispatch

1, the mill mechanic implementation of the day shift scheduling, employees should be received after the scheduling plan within 5 days of whether to raise objections, otherwise employees should be strictly in accordance with the scheduling plan to go to work attendance, in the event of personnel tension or special circumstances, the adjustment of their own, must be notified to the head of the scheduler in advance.

2, scheduling should pay attention to the following matters:

(1) Reasonable deployment of personnel with, such as new employees must be arranged for the corresponding master with the class, the professional power with reasonable, etc., to ensure that each horizontal class with the power of the personnel.

(2) Vacation. Prepare to take family leave (or annual leave) employees should be 15 days in advance, to the department to apply. The department will arrange the vacation according to the next month's production. If a vacation cannot be scheduled due to production, it will be given priority in the next application.

Four stages of the mechanic's work

(a) the preparation stage

1, the mechanic must be in the prescribed work time 15 minutes in advance to participate in the workshop organized by the organization of the work

meeting, or else regarded as a late treatment.

2, listen to the director of the workshop to introduce the company's overall production yesterday.

3, from the mechanical technician to receive the class work tasks: including the class of the day shift equipment maintenance tasks and spare parts production tasks, the three classes need to focus on the maintenance of equipment and the corresponding maintenance of technical documents, safety and "5S" notes.

4, study the recent company management regulations related to the content.

(2) Direct Preparation Stage

1, after the end of the organization of work into the post.

2, technical preparations: to clarify the work of the day arranged for the maintenance project focus, the difficulty of the cause of the failure and technical requirements of the document, to determine the need to prepare what tools, gauges, etc., the initial construction program, not clear, in a timely manner, to the director or the competent technician to ask for instructions.

3, the preparation of personal protective equipment: according to the site working environment, the preparation of protective equipment,

wear good labor protective equipment, such as helmets, safety belts, safety縄, protective clothing, goggles, masks and so on.

4, tools and materials preparation: according to the characteristics of the project, prepare and check the necessary tools, gauges:

a) hand hammer, sledgehammer handle is mounted securely;

b) movable wrench, socket wrenches are not slippery;

c) whether the measuring device is accurate, applicable and so on;

d) sandpaper, cotton gauze, oil, soldering rods, and so on, and so on, whether the materials are ready;

e) Oxygen cylinder, acetylene bottle whether the bottle cap and tighten, bottle frame is solid;

f) Oxygen cylinder, acetylene bottle meter is intact, whether the pipeline leakage;

g) welding clamp joint wire is not exposed;

h) Oxygen cutter gun does not leak, the nozzle is not clogged.

(C) maintenance work implementation stage

1, maintenance

(1) in accordance with the provisions of the cleaning, lubrication, fastening and other maintenance provisions and the scope of work for maintenance and maintenance operations (inspection workers can not deal with the more complex maintenance and maintenance operations).

(2) Check the inspector's response to the abnormal fault phenomenon, the need for simple adjustments and necessary corrections, you can carry out part of the organization's dismantling inspection, and clear the fault found.

(3) Fill in the relevant maintenance record form, sign the name of the worker.

2, repair

(1) equipment repair before the implementation of the beginning of the visual inspection or in-situ inspection of equipment components, systems and so on. In-situ inspection found with the fault judgment is wrong, should suspend disassembly, to be re-determined by the technician, in the organization of disassembly repair.

(2) can basically determine the failure of the equipment, the failure of the equipment and its components and systems should be off-site thorough inspection and repair:

a. Check and remove all debris in and around the equipment, adjust the lighting.

b. When disassembling, pay attention to the personal and equipment safety protection, if necessary, should do a good job of equipment safety support devices. c. When dismantling, dismantle the equipment step by step in the order from the outside to the inside.

d. When disassembling, record the sequence, direction and location, and make sure to mark the mark. e. The disassembled parts should be arranged in order to avoid loss.

f. When disassembling the parts and screws encountered serious corrosion can be used to auxiliary chemical agents to deal with the best not to destructive disassembly, so as not to cause the expansion of equipment failure.

g, dismantled parts have repair value, can be repaired on-site repair should be installed on-site; on-site can not be repaired should be repaired as soon as possible after dismantling as a spare parts processing; no repair value should be treated as scrap, and install new spare parts.

h, equipment parts falling off, cracked can be welded repair, should be welded in time to deal with.

i. Installation should follow the order from inside to outside, and adjust the gap and center line and other calibration work. j, the number of replacement parts recovery should be recorded in detail in the maintenance record sheet.

k. After the completion of the inspection, clean up the site, remove the remaining parts, and restore site hygiene.

l, contact with the central control, waiting for the equipment maintenance is complete, the implementation of power supply, ready for test run.

m, carefully observe the operation of the equipment during the test run, if the test run found that the problem immediately stop and deal with it again, if there is no error, record the current, sound, temperature and other parameters during the test run.

n, the end of the test run to confirm that the equipment is normal after the delivery of the production unit to drive normally.

3, after maintenance, should fill in the maintenance sheet on the appropriate content. At the same time in the implementation of the repair and maintenance process found the following major defects and hidden defects affecting the safe operation and equipment, should be reported to the higher level within 12 hours:

4, can be utilized to repair spare parts

for the purpose of repair 'temporary removal from the equipment with the use of the value of and re-repair and installation of spare parts, in accordance with the following procedures for repair, disposal:

a. Check and remove all debris in and around the equipment.

b, repair should be in accordance with the original process and materials for repair, repair process, materials for technical improvement, should be based on the engineer instructions, not arbitrarily adopted.

c. The original structure of the spare parts shall not be destroyed.

d. The need for chemical treatment should be based on the implementation of conditions to choose the appropriate unit to implement.

e. Repaired spare parts should be timely into the warehouse, is strictly prohibited not into the warehouse directly used.

f. After the repair of spare parts should ensure that 72 hours of continuous operation.

(D) shift stage

(1) 30 minutes before the end of the shift, the maintenance should be to the maintenance work site site inspection, grasp the maintenance of the equipment after the operation of the situation.

(2) 5 minutes before the end of the shift, should be the day of the emergence of the relevant situation recorded in the work record book.

(3) Do a good job of cleaning, turn off the lights, lock the door.

V. Safety and civilization standards

1, the site "5S" standard:

(1) repair site leakage in the ground oil, water and other dirt should be cleaned up.

(2) repair site items placed in accordance with the provisions of the standardized positioning management, no debris and random placement behavior.

2, safety precautions

(1) before going to work must wear good labor protection, long hair is not allowed to be exposed. Into the workplace must wear a helmet.

(2) Before and during the shift, drinking is prohibited, and you are not allowed to play, sleep, or do anything unrelated to work during the shift.

(3) When stopping for maintenance, the power supply must be cut off and the warning sign "under maintenance, prohibit closing the gate" must be hung next to the equipment, and the maintenance can be allowed to start only after the central control worker confirms it. Before restarting the equipment after the repair, you are responsible for doing the final check.

(4) not allowed to remove the safety cover and other protective facilities, if the work is required, the work should be completed in a timely manner to restore, to prevent injury. Lighting problems should be reflected in a timely manner and urged to deal with.

(5) repair mill inside and other high-temperature work environment must wear a full range of related safety masks and other labor protection products, there must be someone outside.

(6) work at height must wear a complete safety belt, rope and other labor protection products, and to ensure that there are more than two people present. The working environment should meet the requirements of the maintenance or modification tasks; when the temperature, humidity, rain, snow, ice, hail, wind, light and dust and other factors can not be carried out when the work, the work environment should be returned to normal after the start of the work

(7) into the dusty places, high noise places must be worn with all the relevant safety protection equipment.

(8) power supply, control system failure, require an electrician to deal with, non-electrician shall not carry out electrical maintenance.

(9) Welding machines, lighting, temporary wiring, should be called to deal with electricians, non-electricians shall not operate.

(10) acetylene, oxygen cylinders should be placed in a safe, cool place. Strictly prohibited in the sun.

(11) maintenance equipment need to rotate, pointing equipment, must contact the post worker, the post worker operation.

(12) equipment maintenance, found abnormalities should be promptly reported to the competent leadership, with the head of the shift, and immediately dealt with, the equipment shall not operate with disease.

Mechanic Apprentice Job Responsibilities 2

1, resolutely obey the command of the superiors, conscientiously implement their work instructions, all management behavior to the company.

2, the strict implementation of the company's rules and regulations, and conscientiously fulfill their job responsibilities.

3, is responsible for the company's equipment management; responsible for the equipment from the beginning of commissioning to the equipment failure of the maintenance of the resume management, including the basic equipment, maintenance book, improve the report and other related documents to fill out the organization, filing and storage, regular finishing work.

4, the installation and maintenance of equipment, maintenance work; timely and efficient diagnosis and solution of production equipment failure, to ensure the smooth progress of production and prevention.

5, regular or occasional safety inspection work on equipment; develop maintenance operation plan, develop weekly, monthly, annual preventive maintenance calendar plan, develop spot check prevention plan.

6, regular (every Sunday afternoon after work) inspection of production equipment. Maintenance of machines, equipment, facilities and abnormalities, and make records.

7, the production of machine failure, must be the first time to deal with, to ensure the smooth progress of production.

8, with the groups to open the new transfer, according to different process requirements, the different positions of the equipment for different debugging, in order to promote the implementation of the process, to maintain the production flow of water smooth.

9, where to requisition machine needles, machine parts and maintenance parts, all to be signed by the mechanic, and prove the reason, and then signed by the director of the plant before filling out the requisition form, in order to purchase inventory.

10, all machine parts by the warehouse custody, really need to use, exchange must be signed by the mechanic, the old for the new.

11, all the company's equipment, power facilities are responsible for statistics.

12, the development of parts and components of the safe inventory, timely replenishment of a variety of consumable spare parts, to ensure that the daily production of the required.

13, the company's storage of idle equipment, mechanics must ensure that its good condition, clean up and maintain from time to time, if in the removal of accessories, must be timely replenishment, to ensure that in use at any time can be accessed.

14, machine such as man-made damage, machine repair must identify the cause, put forward treatment advice and timely report to the Ministry of Production.

15, the use of the machine must often check, track to avoid the phenomenon of dismantling parts.

;