Sewage treatment plant work summary

The hard work has come to an end, review the work of this period of time, in the achievement at the same time, we have also found the shortcomings of the work and the problem, it is time to write a good job summary, analyze the work of the past period of time. Then the general work summary is how to write it? Here is my collection of sewage treatment plant work summary (general 5), I hope to help you.

I am a member of the operations department, I am very happy and honored to be able to report on the status of my work in the current year at the time of the new year.

I am a new employee of the sewage treatment plant, this year's work practice gives me the opportunity to witness the growth and progress of the plant, and looking back on this year's work, I have a lot of feelings. Under the correct guidance and attentive care of the leadership of the plant, our plant has been advancing along the line of scientific development, gradually moving towards maturity, and making outstanding contributions to the environmental protection cause of the South Shelang Sewage Treatment Plant. And I personally, with the progress of the plant has been improved and upgraded, the theoretical level and technical management potential has been a substantial leap. Next, I summarize the work from the following aspects, and sincerely look forward to the guidance of leaders and colleagues.

First, in the work attitude

I think correctly, pragmatic, and can treat the work with a progressive attitude, meticulous, dedicated. I know that my work is honorable, great, noble, in this era of vigorously advocating scientific development, harmonious society, low-carbon, green, clean, environmental protection is the eternal theme. China's national economy and the construction of the Twelfth Five-Year Plan Outline Recommendations also proposed to adhere to the construction of resource-saving, environmentally friendly society as an important focus for accelerating the transformation of the mode of economic development. Therefore, I harbor a simple attitude, work diligently, always in the forefront, in the ideological view of the work above all.

Second, in terms of work performance

I am mindful of excellence, strict control, and constantly optimize the management methods and ideas. Since the operation of my plant, the constant commissioning of equipment, I familiarize myself with the new equipment and new operating procedures in the shortest possible time, so that the new equipment to play a role in the maximum extent possible, improve work efficiency, and to ensure the safety and smoothness of all processes in the work to create a zero error rate, and the successful completion of the end of the year targets! Of course, this is closely related to the close cooperation of colleagues, the whole plant workers unity and harmony is also an important driving force in my work.

Three, I would like to take this opportunity to analyze their own shortcomings and advantages, in order to clarify the direction of future work.

I am an ordinary worker, in the process of **** and exchange with young workers, I feel that the young people have a vigorous vitality and energy, their higher scientific and cultural qualities and the potential to skillfully learn and apply new technologies so that I recognize the gap between the existence of the self, in the new year, I have to continue to strengthen the learning process, keep pace with the times, and innovative ideas. At the same time continue their own experienced, calm and steady, hard-working advantages, improve the method, improve efficiency, to ensure that the process of sewage purification of safe and efficient.

Looking back at the past, many storms; looking ahead, full of confidence. I believe that under the leadership of the leadership of the plant, under the support of my colleagues, I will continue to work hard to create better results, and I look forward to your supervision and guidance! Also believe that our sewage treatment plant to achieve new glory! Finally, I sincerely wish all the leaders and colleagues in the new year work well! All the best! Good health! Happy family!

The above is a summary of my work, thank you!

The work of the sewage treatment plant summary 2

Light like an arrow, years like a shuttle, in the blink of an eye xx year is about to pass, review the work of this year, I am in the company's leadership and the support and help of all colleagues, strict requirements for self. In accordance with the requirements of the company, better complete my own work, so that I have made new progress in theory and practice, fundamentally get rid of the past can only bury their heads in the sand, do not know the phenomenon of summarizing experience. Now the work of this year's situation is summarized as follows:

First, the daily work

1, love of my work, work attitude is correct, serious and responsible, able to correctly and seriously deal with each job. Repeatedly every day to do inspection, equipment switch, health cleaning work looks very tedious and boring, even the usual holiday breaks are not, but I have no complaints, the work needs to be put down to the point of sacrifice a little bit of that and how. No matter how big or small, if you don't take small things seriously will cause irreversible consequences. The work is trivial, but in order to do a good job, I'm not afraid of trouble, to the leadership to ask for advice, to colleagues to learn, self-exploration and practice, and seriously study the relevant business knowledge, and constantly improve the theoretical level of self-improvement and comprehensive quality. I stick to my position and strictly require my team members to abide by the labor discipline and rules and regulations. Seriously, on time, efficiently complete the tasks assigned by the leadership of the Division.

2, but also attentively with other sections of colleagues to do a good job, and in other colleagues have something to be able to top. For example: the pump room of the plant to clear the work of the garbage, the original plan was to ask people outside the clear, because of the relevant reasons people do not do, so the leadership in the plant under the leadership of the whole plant personnel with the heart with the pump room with the garbage cleaned up in 2 days, and carried out on the maintenance of the pumps. There is the maintenance of 3 # 4 # biological pool, the rectification of coarse grating, 1 # two sinking pool guide rod scraper maintenance, the installation of lightning protection facilities in the plant, the South Gate Pond pumping station to install 5 # pumps when the influent interceptor, contact centrifuge manufacturers, and with the maintenance section of the maintenance of the centrifuges 1 # 2 # centrifuges to allow thickening workshop as soon as possible to return to normal sludge. Installation and debugging of pump dry protection device, so that the enrichment workshop equipment can be more secure, rest assured that the use of operation. And can be in the production operation of small problems can be dealt with in a timely manner, such as rainy day river water backflow can be made in a timely manner emergency solutions to ensure the normal indicators of the plant.

Second, learning

Discuss the weekly team meeting to discuss the study, at any time to understand and listen to the spirit of the meeting, and to contribute to the heart of the contribution, and timely discussion and solution of the daily work of the problem. With heart and initiative to learn sewage treatment professional knowledge. Encountering problems not afraid of trouble, to the leadership to ask for advice, to colleagues to learn, self-exploration practice, and constantly improve the theoretical level and comprehensive quality of self.

Three, style

Can comply with the rules and regulations, unity colleagues, pragmatic, optimistic, always continue to rigorous work attitude and meticulous work style. Diligent, conscientious, hard-working, diligent and thrifty, always do honestly, hard work.

In a year of work and study, the main gains are the following:

(1) learning with an open mind, diligence in practical operation, theory and practice, can skillfully manipulate the work of the post.

(2) conscientiously, on time, efficiently do other work assigned by leaders at all levels. At the same time, I also cooperate with other colleagues to do a good job. Fourth, there are shortcomings and ways to improve.

Despite the necessary progress and achievements, but in some areas there are still deficiencies. For example, there are creative ideas for work is not a lot, individual work is not perfect, in the work of more careless, in the theoretical aspects or understand too little.

In the future, I will bring a solid work style, serious work attitude, mature work experience, and continue to overcome the shortcomings of the work. Strive to be a good employee and make greater contributions to the company!

Summary of the work of the sewage treatment plant 3

County sewage treatment facilities construction in the first half of the work, in earnest in accordance with the provincial and municipal requirements, under the leadership of the county party committee, the county government, under the leadership of the relevant departments to assist and cooperate with the construction authorities in ensuring the quality of the project and the project progress under the premise of increasing efforts to improve the work methods, scientific scheduling. The project through the construction unit's solid work to smooth progress, progress and quality to meet the expected goals, the work has been recognized by the city and county.

First, strengthen the leadership, strengthen the measures

The project since August 1, 20xx started, due to the complexity of the site geomorphology, the pre-foundation processing difficulty, coupled with more rain last winter, to the progress of the project has caused great difficulties. Foundation treatment took 3 months, the main project was delayed until the end of November. At the same time, pipe network construction for various reasons to mid-December to start, so by the end of 20xx only completed about 30% of the project. According to the city and county requirements to ensure that the project is fully completed in June 20XX, time is tight, the task is heavy.

To this end, the county party committee, the county government asked to further strengthen the leadership, strengthen measures. The implementation of the county party and government leaders monthly on-site scheduling system, the competent deputy governor weekly supervision system, the construction of the competent department of the work included in the Bureau of the agenda, the implementation of the Secretary is responsible for the system, a deputy director of a full-time grasp of the project, and at the same time to do the construction unit to the competent department every day to report to the competent department, the competent department every week to the county of the main leadership of the reporting system. Under the premise of ensuring quality, thus effectively promoting the progress of the project.

Second, rationalize the arrangement, the results are obvious

Sewage treatment plant in the construction of the implementation of shift work, comprehensive. Pipeline network to implement a number of sections of synchronous construction construction, to 20XX December project completion is: sewage treatment plant is fully completed, the completion of the total investment of 28 million yuan, and on August 12, 20XX completed completion and acceptance. Interception of sewage pipe network is fully completed, the completion of the length of 11 kilometers, the completion of the total investment of 16.22 million yuan, and on October 27, 20XX to complete the completion and acceptance. After the completion of the project on July 22, 20XX completed the joint commissioning of the plant, and entered the trial operation stage, to November 10 has completed the recruitment of personnel on the job and measurement of the signing of the groundwork. Wastewater treatment plant to collect 6500 tons of sewage per day, after treatment of the effluent COD concentration of 34.5mg / L, PH value of 7-8 or so, ammonia nitrogen in the 8mg / L, have reached the discharge standards.

Third, strengthen supervision, strict management of funds

Sewage treatment facilities construction funds estimated at 41.503 million yuan, of which 26.3289 million yuan for the construction of wastewater treatment plant (civil works 21 million yuan, 5 million yuan of equipment), the pipeline network construction estimated at 15.1741 million yuan. At present, the funds in place are 37.03 million yuan, including 7.5 million yuan of pipe network incentives. To November 1, 20XX *** counted payment of funds 29.836 million yuan; of which 23.3 million yuan to pay for the project, 3.73 million yuan of equipment, other funds 2.806 million yuan (of which 15.2 million yuan for sewage treatment plant, pipe network 8.1 million yuan)

We are in the management of funds, in strict accordance with the "Provincial and County (Municipal) Wastewater Treatment Facilities Construction Project Funding Interim Management Act Implementation, specifically by the county accounting center to open a special account special account, arrange for special accounting, urban construction, finance and banking arrangements for special review, review, signed by the county government in charge of the county commissioner to disbursement, the strict implementation of the sewage treatment facilities construction project financial accounting system.

Strict implementation of the People's Bank of China issued the "Provisional Regulations on Cash Management", according to the actual needs of the project department, a reasonable verification of the cash inventory limit, while paying for the purchase and construction of the costs below the limit, prohibit white goods against the library and arbitrary diversion of cash. The cashier must balance the cash journal daily, and the treasurer will check the cash on hand on a regular or irregular basis. Invoices must be signed by the handler, audited by the accountant, and approved by the project manager before being reported to the construction authority for review and approval.

The next step in our work we will further strengthen supervision, strengthen the sewage plant and pipeline network operation and management, to ensure that the sewage treatment plant contracted on time, put into normal operation.

Recently, the company set off a "learning politics, learning technology, learning the law" of the "three learning" activities of the culmination of the in-depth development of this activity, and combined with the actual situation of the sewage treatment plant, to talk about their own A few insights. Sewage treatment plant as the backbone of water pollution control, a city environment improvement, investment, tourism development, people's living standards have a very important impact. In the new period, do a good job of sewage plant operation and management, is to improve the level of service to adapt to the requirements of the development of the market economy, is to protect the environment, remove pollution, to ensure the sustainable development of urban socio-economic needs. The following combination of "three learning" to further improve the management of sewage treatment plants to talk about a few experiences.

First, the current situation of the sewage treatment plant

Xinyang City sewage treatment plant in XX formally put into operation, operating funds from the appropriation, the daily capacity of 100,000 cubic meters, for the city of Xinyang City at the time, the scale of the city has been basically admitted to the urban sewage discharged into the pipe network. Currently financing the second phase of the project and water reuse projects, the construction of the project, will be the economic development of Xinyang City and urban ecological environment protection, rational use of water resources play a powerful role in promoting. One hand grasps the sewage plant construction and development, one hand grasps the internal management to become the reality of my plant management work is characterized.

The sewage in the area served by the plant is mainly domestic sewage, large-scale public construction projects (hotels, restaurants) and part of the industrial wastewater composed of mixed sewage. As a result of the proportion of domestic sewage accounted for a larger proportion, not only caused by the sewage has a large time unevenness, and the composition of sewage, such as suspended solids concentration is higher, lower concentration of organic matter, water quality fluctuations.

Compared with the general urban sewage treatment plant, sewage treatment is more difficult and costly. And most of my plant equipment for imported equipment, although the reliability is good, but the power consumption, maintenance rate, maintenance costs are high, objectively also increased the cost of sewage treatment. Grasp the operation and management, do a good job of energy saving and consumption reduction, to adapt to the requirements of energy saving and emission reduction. Adhere to the overall quality management, pay attention to every aspect of the whole process of production management, whether local or detailed, in order to achieve maximum savings, optimized operation, is to ensure that the whole plant to run efficiently and economically, and constantly promote the operation and management of the sewage treatment plant on a new stage, on a new level of the primary means.

Two, comprehensively promote the goal of management

Management is the carrier of the goal, the goal is to realize the value of management. Management without goals is blind, nothing to do; no management of the goal is empty. Only the organic combination of specific objectives and management style can achieve the effectiveness and benefit of management. Objectives can be divided into milestones, general objectives, milestones for the service of the general objectives. Objectives can only be broken down into specific aspects of work to achieve the purpose and significance of management.

The fundamental goal of the sewage treatment plant is to manage water pollution and protect the water environment. Decomposition of objectives specific to the management of all levels of work, is the company's mission to each section, set targets, self-development and self-management, *** with efforts to achieve the principle of maximizing benefits. Target management according to different professions and departments to develop different quantitative standards, according to the form of cost indicators to be assessed. Such as: water treatment unit cost plan indicators; production equipment maintenance cost plan indicators. The fundamental principle of the development of indicators is to ensure the normal operation of sewage treatment, strengthen the water quality standards, strengthen the water treatment and equipment utilization, strengthen the safety productivity, equipment integrity rate, the approved daily electricity consumption and the total annual electricity consumption, the completion of the water treatment of the current year's equipment and maintenance and replacement of the work of a clear goal, the manager and the managers can have the motivation in order to stimulate the enthusiasm of each employee. Economic responsibility and the implementation of the costs of the dead base, excess waste penalties, savings incentives to strengthen the sense of ownership of the staff, and is conducive to promoting the improvement of economic efficiency of the plant.

Target management lies in the timely and correct guidance, and constantly push the envelope. To often compare the level of my plant's operation and management with the national fraternal units, find gaps, catch up with the advanced, the whole plant vigorously remediation, and strive to reduce the cost of water treatment, standardize the management system and management procedures. In the company's staff to establish a sense of goal management, and in the specific work of the implementation of one by one, rewards and punishments.

Third, strengthen the management of innovation

Management innovation refers to the creation of a new and more effective resource integration paradigm, this paradigm can be a new and effective remediation of resources to achieve the organization's goals of the whole process of management, but also can be a new and more effective allocation of specific resources, such as the details of the management. The introduction and implementation of a new management approach and methodology may improve productivity, conserve natural resources, harmonize interpersonal relationships, or better motivate employees. All of these will help to effectively integrate the organization's resources to achieve the intended goals.

Management innovation is to take the initiative to meet the challenges of the market economy, otherwise, only be eliminated by the fast-developing market economy. Due to the drawbacks formed over the years and people's ability to bear, the sewage treatment plant management innovation can not be achieved overnight, it is not possible to get there in one step, only gradually adapt to speed up the adaptation. The establishment of a management innovation system, management to promote efficiency, management to promote efficiency, to management to development is the cornerstone of my plant operation and management mode.

After years of practical exploration, combined with plant conditions, our plant to establish an effective incentive and constraint mechanism. First, the sound company, section, team, layer by layer supervision mechanism, so that the target management can follow the rules, there is a system to comply with. Second, based on the management system, the establishment of a perfect three-tier assessment system. Middle-level cadres and team leaders to implement a semi-annual assessment, employee job salary assessment once a month, and the establishment of assessment files. The appraisal results are used as the basis for job appointment, job mobility and efficiency pay grade. The implementation of the three-level management and assessment system is to make the cadres have pressure, strict requirements on themselves, so that the staff's conscientiousness has been strengthened, and motivation has been improved. This improves the efficiency of the overall work.

Management is productivity, and the management of human resources is the root of management innovation. Labor as an important element of management, is the most positive and active factors in the production process, determines whether the productivity is advanced, whether to adapt to the development of the market economy. How to scientifically configure human resources, maximize the mobilization of people`s `activity, creativity, and improve the overall quality of people is the goal of management innovation is constantly pursued. In the configuration of human resources in the implementation of the dynamic combination of the most effective is to achieve "multi-talented", the overall development of composite talents.

With the continuous improvement of our sewage collection system and sewage treatment process is complete, sewage treatment workload has increased exponentially. To this end, I plant each year to timely organization of sewage treatment workers, laboratory workers, sludge workers, maintenance workers and other types of personnel focused on training, and strive to each employee to hold a variety of licenses, each type of work can be mutually exchangeable; require each employee to be familiar with the plant's various production links, can adapt to the work of each position. Through the dynamic optimization of the combination, and gradually formed a mobile, competitive employment mechanism, truly multi-talented, and maximize the play of individual talent, so that the effective use of labor resources, saving labor costs, reduce the cost of sewage treatment, in order to adapt to the restructuring of the enterprise development needs.

Four, management to promote technological progress

Modern economic theory and practice have proved that technological innovation, technological progress is an important force for enterprise growth and development. The development process of the sewage industry, has been relying on science and technology in moving forward, how to spend the least amount of money to improve the quality of treatment, is always the purpose of the water treatment sector industry research. From the point of view of the sewage treatment process, from the traditional activated sludge method to the current dozens of various types of treatment processes, are people in constant search, for different sewage properties, with the least amount of energy consumption to achieve the best treatment results.

Technological progress and technological innovation, input and output is an uncertain process, it is affected by many factors, in addition to factors in the field of technology, management efficiency and way is an important factor. Therefore, the process of technological progress and innovation is not only a technical problem, but also a management problem. Management can reduce the uncertainty in the process of technological progress and improve the efficiency of technological innovation.

The management process is the process of raising problems and solving them in production activities. Some of the problems can be solved by adjusting personnel to improve the quality of personnel to achieve, but some can only be realized by technological progress. For example: my plant was built early, the water treatment process in the pretreatment equipment coarse grating and pipe network interception conditions and many other factors, resulting in a large number of scum into the collection wells and even oxidation ditch, affecting the subsequent treatment process. The emergence of the problem to the daily management caused great difficulties, therefore, only technological innovation to rectify the coarse grating baffle, and strengthen the pipe network slagging efforts to achieve the purpose of oxidation ditch without slag. The progress of technology has led to changes in the traditional management, management to intelligent, technological direction, no need to question the progress of technology to counteract the improvement of the management level.

The management of the degree of difficulty affects the choice of sewage treatment process, determines the direction of technological development. Carrousel technology in sewage treatment in the operation of simple, high stability, the operation of the staff is more convenient; at the same time, the rapid development of industrial automation level led to the progress of sewage treatment, so that the Carrousel process operation, maintenance, management is convenient and easy to do, in the sewage industry is still quite a long time of use value.

V. Conclusion

To further deepen the development of the "three learning" activities, strengthen management, explore new ways of sewage treatment plant management, new ideas is a long-term task. Let us join hands, the management and energy saving and transformation combined to improve the quality of management personnel, to ensure that the quality of sewage treatment plant operation, so that the management of sewage treatment plants to a new level.

XXX sewage treatment plant at all levels of leadership care and guidance, the hard work of the workers of all classes, under the synergy, to ensure that the completion of the sewage treatment plant to meet the standards of stability and operation. Now in 20XX, XXX sewage treatment plant operation is reported as follows:

First, XXX sewage treatment plant energy saving and emission reduction completed

XXX sewage treatment plant in strict accordance with the company and the higher construction, environmental protection, finance, water conservancy, disciplinary inspection and other departmental requirements, strict management, and always pay attention to ensure that the sewage treatment plant is stable and meet the standards of operation. Keqi wastewater treatment plant since January 1, 20XX to the end of December 20XX, **** treatment of 4.23 million tons of wastewater, the treatment load rate of 77./3%, the average daily capacity of 11,600 tons, the average concentration of influent COD 450.4 mg / L, the average concentration of effluent COD 65.0 mg / L, to achieve the reduction of chemical oxygen demand of 1,630 tons; influent ammonia concentration of 58.2mg / L, the average concentration of ammonia nitrogen, the average concentration of 58.2mg / L, the average concentration of water, and the average concentration of ammonia nitrogen. 58.2mg/L, the average concentration of ammonia nitrogen in the influent water is 24.8mg/L, realizing the reduction of ammonia nitrogen by 151.3 tons; the effluent indexes all meet the national secondary standards for urban sewage discharge.

XXX sewage treatment plant online monitoring data and Chifeng City Environmental Protection Bureau monitoring platform real-time connection, regularly to the higher environmental protection departments, construction departments, development and reform departments to submit daily, weekly, monthly, quarterly, annual verification and other materials; to meet the State Ministry of Environmental Protection verification team, autonomous regions and the Office of Environmental Protection Inspection Team, the Eastern Supervisory Center Inspection Team, the Chifeng Municipal Bureau of Environmental Protection Inspection Team, the Chifeng City Environmental Protection Supervision Team, Chifeng Environmental Monitoring Station, the flag government, flag authorities and other inspections. Successful completion of all levels of environmental protection, construction and other departments to arrange the tasks assigned.

Second, Keqi sewage treatment plant workshop equipment operation

Keqi sewage treatment plant after five years of operation, due to equipment aging, winter frost, unstable water quality, sediment, etc., the frequency of equipment failures, wear and tear. For example: the influent grille room and a pump room due to unstable influent water quality, instantaneous flow is not easy to control, sediment, debris and other reasons lead to the grille can not operate normally, has affected the normal and stable operation of the sewage treatment plant, resulting in a reduction in the effect of sewage treatment. In order to ensure that the sewage is stable and meet the standards, for the equipment failure, especially inlet grille failure, sewage lifting pump failure, fan failure, etc. I plant many times to organize personnel to carry out desilting, maintenance. Ensure the normal operation of the equipment. The installation of COD online monitoring equipment, ammonia online monitoring equipment, all compared to the monitoring and acceptance, compared to the results in line with relevant laws and regulations, and through the Chifeng Municipal Environmental Protection Bureau of acceptance.

Third, the laboratory

Keqi Water Company water quality laboratory according to the company's requirements for domestic drinking water, sewage laboratory. *** on drinking water wells, fresh water plant water, pipe network end water test 58 times; complete the sewage self-test project 7 (water temperature, PH, COD, ammonia nitrogen, SS, dissolved oxygen), and on the sewage online monitoring system malfunctioning manually after the test data. The test results are in line with national standards.

Fourth, the sewage treatment plant upgrading and pipe network expansion project, water reuse and sludge treatment project progress.

Kesh XXX wastewater treatment plant upgrading project with a total investment of 99.4640 million yuan, 20XX completed upgrading project comprehensive equipment room, integrated water workshop, MBBR pool renovation, composite hydrolysis pool, sludge pumping room and other construction projects, complete cable laying, equipment procurement and installation work. Enter the commissioning stage, and by the end of the year to complete the environmental acceptance.

Fifth, 20XX work plan

According to the 20XX workshop equipment operation, in 20XX I plan to part of the running time, high failure rate of the equipment (such as: blowers, grills, pumps) to carry out professional repair and maintenance work; plans for two times a year (after the warming of the temperatures in May, once before winter) on the influent grill, and in October, the water pump room. October once a year (after the warming of the temperature in May, before the winter) on the influent grille room, influent pump room, biofilter, the second pump room sediment sediment cleaning to ensure that the grille, sewage lifting pumps for the normal operation of the laboratory; strengthen the management of the laboratory, to increase the detection of the project, the frequency of testing to ensure the quality of the experiments; efforts to study the sewage treatment process, the country's new standards, new methods and sewage treatment laws and regulations, and so on.

Efforts to enhance the professional quality of staff, improve the staff's personal ability to ensure that the sewage treatment plant is stable and up to standard operation. According to the company and the higher authorities to ensure the stable operation of the sewage treatment plant, for the Keqi energy saving and emission reduction to contribute their own strength.