Introduction of Nanning Liujing Industrial Park

Nanning Liujing Industrial Park was established in February 2002, and was approved by the People's Government of Guangxi Zhuang Autonomous Region as an autonomous region-level development zone in December of the same year. 2010 January, approved by the People's Government of the Autonomous Region, Liujing Industrial Park was included in the Beibu Gulf Economic Zone of Guangxi as one of the 11 key industrial parks. The town of Liujing, where the park is located, is a national key town and a demonstration town of well-being and civilization in Guangxi. After years of development, six King Industrial Park development and construction has gradually embarked on a rapid development track.

I, location advantages unique superiority

Park in the center of Guangxi, backed by the southwest, facing Southeast Asia, east of Guangdong, Hong Kong, Macao and the eastern part of developed areas in Guangxi, south of the Beibu Gulf coastal port city, west of Guangxi's capital city of Nanning, north of Liuzhou, Guilin and other important cities in the "China - ASEAN Free Trade Zone" economic and social development, and in the "China - ASEAN Free Trade Zone". ASEAN Free Trade Area" economic circle and "Pan-Pearl River Delta" economic circle on the intersection, is the southwest sea corridor and South (Ning) Guiyang (Yang) Kunming (Ming) economic belt on the important node.

Secondly, the transportation is convenient and fast

The transportation network of the park is well-connected, Guilin-Beihai Expressway, Nanning-Guangzhou Expressway intersects here, and Liujing-Qinzhou Expressway is under construction; Xianggui Railway and Laiqin Railway cross the border, and there are two railway stations in the park; Yujiang River, the golden waterway of the Pearl River system, flows through the park, connecting Nanning, Baise, and reaching Nanning and Baise, and reaching the park. The golden waterway - Yu River of the Pearl River system flows through the park, up to Nanning, Baise, down to Guangzhou, Shenzhen, Hong Kong, now year-round navigation of 1,000-ton ships, is under construction in Nanning Port, Luk King port area of the maximum annual throughput of 26.4 million tons, is expected to be completed by the end of 2012, a project completed by the end of the operation; the park to the Nanning International Airport, the entire highway is about 80 kilometers away. Park highways, railroads, waterways, aviation, "four-in-one" traffic location advantages, with the development of modern industry, logistics industry prerequisites.

Three, the planning and design of scientific and reasonable

In 2000, by the Guangzhou Academy of Social Sciences on the development of the park feasibility demonstration, in 2001, by the Shanghai Tongji Urban Planning and Design Institute to complete the park's first phase of the preparation of a 7-square-kilometer master plan, by the end of 2009 by the Guangxi Urban and Rural Planning and Design Institute to complete the second phase of the preparation of a 35-square-kilometer master plan, 2010 May by the autonomous region of the Beibu Gulf Office, Nanning Municipal People's Government and the People's Government of Hengxian County *** with the commissioned Jiangsu Urban and Rural Planning and Design Institute to carry out the "Guangxi Beibu Gulf Economic Zone, Six Scenic Industrial Park Conceptual Planning" of the preparation of the new plan for an area of about 150 square kilometers.

Four, infrastructure continues to improve

Since the establishment of the park, the park's infrastructure construction has invested a total of more than 400 million yuan, for the majority of businessmen to invest in the business provides a hardware guarantee. Among them, water supply: the park's current daily water supply capacity of 15,000 tons, basically meet the water needs of enterprises in the park, the daily water supply capacity of 40,000 tons of water supply plant is under construction, scheduled for February 2011 completion of the operation. Sewage treatment: a sewage treatment plant with a daily sewage treatment capacity of 20,000 tons is under construction and is scheduled to be completed by the end of 2010. Power supply: Power supply is now provided by the 110KV substation in the park and 35KV substation in Liujing, and the 220KV substation in Liujing, which serves the Nandian project, has been completed, which will make the power supply of the park more sufficient and stable. Roads: The "three horizontal and three vertical" main roads in the park have been completed and put into use, and the first phase of the road network is basically perfect. Communication: the park telecom broadband, cell phone network comprehensive coverage, information transfer unimpeded.

Five, investment achievements

Since the establishment of the park until now, **** signed a project investment contract 73, contracted investment of more than 35 billion yuan, has been built and put into operation 38 enterprises, 25 projects under construction, is carrying out preliminary work on 10 projects. Introduced projects involving agricultural products processing, cocoon and silk processing, steel manufacturing, feed production, pulp and paper, electricity, chemical and other industries, especially from 2006 has introduced the Guodian Group Nanning Power Plant Project, Nanning Oasis Chemical Company chlor-alkali project, Guangxi Jindaxing Group pulp and paper project, Guangxi Yongkai Group molasses and paper projects, such as the autonomous region's major projects settled in the park, for the park to build a hundred billion dollars! Industrial park to build 100 billion yuan industrial park, enhance the development of a good foundation.

Six, industrial layout increasingly optimized

In conjunction with the Nanning City, the park's development of the positioning of the park's views, the park to give full play to the existing location and resource advantages, in accordance with the concept of "one area, multiple parks", the planning and construction of the "three parks and one belt" that is, paper In accordance with the concept of "one area and multiple parks", the park plans to build "three parks and one belt", i.e. paper-making industrial park, chemical industrial park, silk industrial park and harbor economic belt, to build a sustainable industrial park with industry as the mainstay, and warehousing, logistics and commercial/residential industries as the supplementary industries. Firstly, relying on the rich bagasse and mulberry branch resources in Hengxian County, with Guangxi Jindaxing Group and Guangxi Yongkai Group as the leading enterprises, introducing the supporting projects including deep processing of paper products, manufacturing of pulp and paper production equipments, circulation market, etc., we plan to build a paper-making industrial park with an area of 7,000 acres and an annual scale of 3 million tons of pulp and paper production. Secondly, relying on the rich mulberry resources in Hengxian County, with Lisheng Company, Huaguan Company and other reeling production enterprises as the leader, planning and construction of silk industrial park covering an area of 1,000 acres, focusing on the introduction of weaving, garment making, printing and dyeing projects. Third, relying on Guodian Nanning power plant project and Nanning Oasis Chemical chlor-alkali project, planning and construction of an area of about 10 square kilometers of the Chemical Industry Park, focusing on the introduction of supporting the extension of the Beibu Gulf petrochemical industry upstream and downstream fine chemical projects. Fourthly, relying on the construction of Nanning Port Luk King Port Area, the development and construction of warehousing, logistics-based port economic zone, drive the economic development of the park, and then radiate to the southwest, the Pearl River Delta and China - ASEAN Free Trade Zone.

"Twelfth Five-Year Plan" period, Nanning Luk King Industrial Park will be included in the Beibu Gulf Economic Zone as a key industrial park as an opportunity to adhere to the principle of "innovation park, project park, industrial park," the principle of "constructing Big platform, gather big industries, introduce big projects, cultivate big enterprises" strategy, and actively integrate into the opening and development of the Beibu Gulf Economic Zone, and strive to achieve scientific development, accelerate the development, take the lead in the development and harmonious development!