Monthly project work summary 8

Monthly Project Work Summary Part 1

Since April, my project site production work began to enter the track, after two compliance checks and the preparation of all internal and external work to improve, the project is progressing relatively smoothly, the specifics of the report is as follows:

First, the project overall situation and project progress

I project department residence, laboratory and mixing station construction is basically completed, the right-of-way has been pulled through the whole line, residence, laboratory, mixing station fully into the work. 25 April, the project formally started, k3 +225 bridge pile foundation and k3 +050 through the culvert sample project to start, to the end of April, has been pile foundation excavation and the sample through the culvert project earthmoving. By the end of April, the pile foundation excavation and sample through-concanal project earth excavation and foundation treatment work has been carried out.

As of the end of April, the project is in good progress, the internal work, in March to complete the work on the basis of the project in April, the Ministry of Integrated Office is mainly responsible for doing a good job of 4.12 performance re-inspection, the reception work, logistics and to assist the departments to carry out their work smoothly; laboratory to complete the geotechnical test, aggregate test; planning and contracting department signed a subcontract of six construction teams, respectively, for two culvert contract, two protection of the contract, and two protection of the contract, and the project is in good progress. Culvert contract, 2 protection contract, 2 bridge contract; safety, quality and environmental protection department to prepare for the start of the application program, construction organization design program and the construction team's safety management system, program; Finance Department is mainly in the processing of the letter of guarantee and prepayment payment work. In terms of external work, in late April, k3+225 bridge pile foundation and k3+050 through the culvert sample project one after another, began to carry out pile foundation and through the culvert excavation.

Second, the progress of the construction team and next month's progress plan

April has entered the field of six construction teams, and k3 + 225 bridge pile foundation construction team and k3 + 050 cover culvert construction team began construction operations, the remaining four construction teams into the field on standby, ready to go.

In May, the plan is for two roadbed teams to carry out roadbed filling, roadbed excavation, fill base dredging, and refilling; two protection teams to carry out protection construction; three pile foundation teams are responsible for the bridge, the bridge, the bridge pile foundation; two culvert teams are responsible for the construction of the culvert; and two bridge substructure teams are ready for construction.

Third, measurement and project settlement

1, drafting and assisting the project manager to sign the six labor introduction agreement;

2, the list of accounts reported to the leadership review, and preparation of the final accounts reported to the Supervision Department;

3, the preparation and reported to the signing of the start of the prepayment application;

4, prepared and reported to sign the first phase of the measurement of payment statements;

5, the preparation of the project department within the May construction plan tasks, and by the leadership of the audit issued to the specialists;

6, the preparation of the project department within the value of the statistical table, reported to the Ministry of Finance.

7, the preparation of the "project department on the construction team measurement, payment methods", reported to the leadership review needs to be modified, refined;

8, the preparation of the report on the k32 + 050 channel substrate treatment change application report. Actively cooperate with the work of various departments, better completed in April departmental work plan.

Fourth, financial and financial use

Do the daily accounting vouchers processing work, some of the suppliers for settlement, due to the project funds, some suppliers are still not settled, opened a temporary account for the project procedures for the advance in place to do a good job in the early preparatory work to the owner of the unit to handle the request for payment procedures, according to the owner of the unit required to do the funds application plan, the end of the advance payment. Do fund application plan, the end of the month the amount of prepayment to the account for: yuan, of which the owner has to retain the prepayment tax (3.41%), civil wages deposit (2%), insurance costs (40/00) to stay in the account, the actual available funds only xx million or so, of which the cooperation unit required to turn away 1.65 million (management costs, bonding costs, etc.) The company's actual activity funds only xx million or so, due to the owner's units Strict monitoring of funds, the advance payment now arriving in the account is still left in the temporary account of the project. The project department in the account has spent 400,000 as a project reserve, because the work is not connected to the project cost is not centralized, accounting, in the next month's work will be in the help of various departments and assist in cost accounting work.

V. Materials

1, and Datang repeated consultations with the preliminary agreement reached Shuangfeng Conch cement delivery agreement, to be formally signed contracts;

2, after a number of manufacturers inquiry and reported to the Ministry of the project and the company material set up department, to determine the acoustic tube manufacturers and manufacturers negotiated with the intention of the agreement on the purchase and sale;

3, mixing station at the end of the month began to feed, with concrete production capacity;

4, with the work of the specialists;

5, to complete the leadership of other matters assigned.

Sixth, coordination

1, the work of the temporary land in a normal and orderly manner;

2, blasting program has been finalized, a verbal agreement has been reached;

3, the smooth demolition and relocation of a house;

4, timely mediation of a variety of small conflicts, small disputes;

5, Three pole demolition is in progress;

6, timely completion of the tasks of the leadership.

VII, safety, environmental protection

1, the internal division of labor

In late April, the quality control, safety inspection tasks internal division of labor. The work will be subdivided into individuals and cooperate with each other.

2, quality inspection

(1) has established quality inspection procedures and data archiving system, has begun the normal inspection application approval work. (2) k3+050 channel pit acceptance, foundation treatment acceptance is complete, quality inspection information has been organized. k35+282. 5-k35+475 section of the inclined retaining wall part of the section has passed the acceptance, quality inspection information has been organized. (3) shortcomings:

① further strengthen their own quality, strengthen business learning, to meet the needs of the work. ② need to further strengthen communication between departments.

③ Further improve the collection of quality certification data, organize the work and construction quality inspection procedures. Timely collation of reported quality control information for signing.

3, safety, environmental protection

(1) now started the project safety facilities are basically in place, the completion of the safety technology briefing.

(2) The bridge piling construction team has carried out three levels of safety education.

(3) is establishing and improving the safety nine files.

(4) has completed seven major construction special safety technology program.

(5) shortcomings:

① safety education and training for new workers, workers do not pay much attention to this, hold the attitude of indifference.

② part of the construction team workers on-site safety construction is not enough attention and understanding, has been repeatedly found without helmets and barefoot work. Solution: the scene of violation of safety systems and procedures for photo evidence, the implementation of safety rewards and penalties, standardize safety operations.

③Safety education for workers should be further strengthened so that workers have a better understanding of the importance of safety.

④ The three-level safety education and training should be timely, and the safety officer should communicate more with the construction team, and the safety work should be done.

⑤ Safety inspection records should be organized in a timely manner and the establishment of accounts

4, now the Department of Safety, Quality and Environmental Protection has been normal operation, quality control, safety inspection procedures are being further improved.

Eight, integrated management

In April, the integrated office mainly completed the following work;

1, the project department living area renovation, to improve the quality of life of the staff;

2, to assist the Department of Safety, Quality and Environmental Protection to produce a variety of signs and labels;

3, to assist in coping with the 4.12 Compliance House inspection, do a good job of publicity;

4, collect and keep office documents, good file management work;

5, flexible mobilization of vehicles, to ensure that the site car.

Nine, the need to solve the problem

Two bridges under the structure of the team is scheduled to enter the field in the second half of this month, but also asked the company to clarify the construction team in a timely manner; in addition to the earth team into the field has been nearly April, the delay in the signing of the construction contract, has seriously affected the project production and day-to-day work, the project work at a loss, the company to decide early.

As all the vehicles in the project department, three of them are used in the form of leasing, so there is an urgent need to solve the problems related to the leasing of vehicles in the project department, the relevant situation report has been reported, but so far there is no reply, hope that the leadership of the company to pay attention to .

Monthly Project Summary Part 2

In everyone's hard work and hard work, the project proposal has been successfully submitted. Although there are still many shortcomings, but overall, has been relatively successful. In this project, I serve as the project manager. Responsible for coordinating the relationship between all parties, responsible for the overall project plan arrangement, fully mobilize the enthusiasm and creativity of the personnel of all departments. Management personnel allocation, review and evaluation of tasks and project approval.

Review Summary: Our group to the teacher laid out the case of the overall intention of the axis to the interests of the Tourist Board as the premise of the conditions, combined with the local humanities and geographic conditions, the development of tourism projects around the Chaohu Lake. After a period of time of *** with the efforts of everyone, our group in the management of this project has made some management experience.

As the person in charge of this project, I divided the labor according to the character traits and hobbies of each group member. a Usually the brain is flexible, the idea is more, and often can come up with good ideas. And the thinking is clear, will be for the requirements of the project to come up with a good program of tourism in line with local folklore, folklore. All by her as the director of the development and construction department. b usually hobby painting, literature, often do bulletin boards, the publicity of this piece can have good ideas and ideas, and quick thinking, like innovation. So in this project as director of the publicity department, responsible for coordinating, guiding, organizing the project's external publicity, external publicity business training, external publicity production. He is responsible for guiding and coordinating the media in the district to carry out publicity reports, and is in charge of approving and managing the journalists' interviews in the development zone. c is usually a serious student, and has strong `resilience' and the ability to carry out the accounting treatment at the right time and place according to the specific situation. So in this project as the director of the Finance Department, responsible for ensuring the project's financial needs, to ensure that the construction funds earmarked for the purpose. Effective control and management of all economic activities in the process of project construction. d usually very enthusiastic, hobby care about everyone's life trivial. And have a strong sense of responsibility, not afraid of trouble, patient and meticulous, have a good service attitude. So in this project as a comprehensive administrative department director, responsible for the project office of the administrative and logistics management (including vehicle management and environmental health, staff dormitory, canteen

management, maintenance of water and electricity systems, etc.) of the work, responsible for the project's comprehensive management of social security.

I as the person in charge of this project, myself in focusing on the overall project program at the same time, the implementation of the progress of each team member does not relax. Fully mobilize the enthusiasm and creativity of the personnel in all departments. Often call a meeting to discuss the details of the project implementation, as well as the overall ppt production. Division of labor on the task, strengthen the responsibility to the person. Rationalize the progress of the project. Actively and timely contact with the teacher, meeting at any time to modify this program in order to achieve the most satisfactory state. The members of this group also worked very hard, in the continuous improvement of their own responsible for the part at the same time, timely communication and discussion with other members, together to finalize the plan of this project.

Monthly Project Work Summary Part 3

Since receiving the document "China Railway Notice on the National "Quality Month" Activity in 20__" (China Railway Safety Supervision No. 91), the Luoyang Xihan Interchange Project has attached great importance to this activity. Immediately held a special meeting, this activity as an opportunity to organize the project team members and departmental key management personnel, combined with the current site of the main construction parts, in-depth special quality inspection and checking activities, and achieved good results, is now the activities carried out report as follows:

1, unify the mind, extensive propaganda

The use of early name time, the project department of the whole staff to carry out Communicate and learn, and refine the responsibility of the area, requiring each responsible person every day to the problems found in the WeChat group, timely rectification, deadline closure. In the construction site several important location posted quality banners, play a wide range of propaganda role, the quality of consciousness y rooted in the hearts of the majority of construction workers, to create a good quality management atmosphere.

2, in-depth implementation, timely implementation

Led by the project department engineering department, every Sunday morning joint site deputy manager, safety and quality department, material and mechanical department, laboratory and other key management personnel, on-site inspection inspection work, on-site construction of the existence of quality problems and quality of the hidden dangers of the problem notification to the microblogging group, in accordance with the "five fixed" principle, timely closure. The "five" principle, closed in a timely manner.

3, highlight the focus, take the initiative

For the site of the scaffolding erection, deep foundation pit frame bridge operation, continuous beam construction, steel processing site and other important construction parts, led by the project manager, team members and department heads to participate in the in-depth investigation and management of hidden dangers. And in the weekly meeting to inform the progress of the rectification of quality problems, has played a positive effect.

4, strict delivery, control of the finished product

Site bridges before the construction of important parts of the irrigation, timely organization of personnel to carry out re-examination, re-inspection, the quality of the hidden dangers controlled within the scope of the minimum impact. Timely on-site workers to carry out irrigation before the control points of the explanation, requiring on-site operation workers in strict accordance with the construction program and the construction of technical instructions, and actively grasp the finished product quality control.

5, question and answer contest, teaching and learning

Timely organization of the project personnel to carry out quality month network question and answer 25 people.

6, the exchange of experience, *** with the improvement

During the quality of the month, the spontaneous organization and participate in the Luoyang West Han Interchange along the four segments to carry out mutual inspection activities, and invited the Municipal Bureau of Housing and Urban Renewal Authority and supervision units to participate in, and achieved good results. Realize to observe to promote the improvement, to exchange to promote step, enhance the project quality control level.

7, serious summary, awareness

Quality work is a long way to go, the project department adhere to the problem-oriented, and continue to accumulate management experience, strengthen the focus of management, improve the quality of personnel awareness, from the source to grasp the quality of good pass, to create "China Railway" first-class image to add bricks and mortar.

Monthly Project Work Summary Part 4

According to the Ministry of Construction (building quality [20--]217), the provincial construction department (Min Jianjian [20--]37 and the South Construction Management [20--]51), "on the construction system to carry out the 20--year" quality month "activities. "Activities of the notice" of the relevant documents, I seriously organize and carry out close to the "quality and safety, *** with the responsibility" theme of the activities, combined with the construction quality and safety of construction projects special rectification and supervision, according to the local conditions, highlight the key points, and strive for effectiveness to carry out the 20 - years! "Quality Month" activities, now the "Quality Month" activities are summarized as follows:

First, the leadership attention, clear responsibility

In order to highlight the focus and pragmatic to carry out this activity, I set up a "Quality Month" activities leading group, developed a concise, clear implementation of the activities of the program, at the same time in the quality and safety of the regular meeting of the publicity, mobilization, unification of ideas, awareness-raising, to ensure that the "Quality Month" activities to achieve the desired results.

Second, to create an atmosphere of extensive publicity

October 8 in the quality and safety meeting, the organization of all parties responsible for the main body, carefully study the "quality month" activities related to the document, carefully understand the essence of its spirit and content, requiring the construction companies to develop specific activities, supervision of enterprises to supervise the implementation of specific. This activity. *** issued more than 200 copies of basic publicity materials of engineering quality, hanging banners more than 10 banners, posting more than 100 publicity slogans, the content mainly involves "quality month" slogan, engineering quality and safety knowledge, etc., better create a "quality month" atmosphere.

Third, the heavy attack, rectification storm

The "quality month" activities, combined with the city's specific circumstances and construction quality and safety of construction projects special rectification supervision work to carry out, first, actively carry out the site of self-mixed concrete and prohibit the use of clay bricks of the special inspections; the second is to publicize and implement the Nanping City South Construction management [20 -] 41 "forwarding the spirit of the notice", 20 - April 1, strictly limit the use of manually dug piles, this project so far, has been basically under control, the pile length is also limited to 15 meters within the scope of the provisions of the 20 - October 1, prohibit the use of bamboo scaffolding, derrick, this work in the "quality month "Activities during the increased investigation and handling, has also been completely banned the use of; Third, for the quality and safety of special rectification inspections of the content of the organization of the construction quality, construction of temporary electricity and other special inspections, **** issued 20 hidden rectification notices, of which 4 for the suspension of work rectification notices, put forward rectification of 84 opinions, is now the basic rectification in place, rectification rate of 96%.

"Quality Month" activities have ended, but we want to "quality month" as an opportunity to carry out in-depth activities to create excellent engineering, in order to promote the quality of the city's engineering to a higher level and strive.

Monthly Project Work Summary Part 5

First, the progress of the project:

Civil engineering:

a, the foundation of the heating boiler has been done.

b, office building decoration sample room has been completed.

c. The light and heavy steel of the main plant and boiler room have all come in and finished assembling.

Installation:

a, boiler room of the furnace flue baffle all installed.

b. The boiler's hydrophobic piping, sampling piping, and exhaust piping are 95% complete.

c, flue outside reinforcement rib production and installation completed 2 tons.

d, flue combination completed 10 tons.

e, go to the Wuwei safety and quality supervision department to report boiler equipment (preliminary completion).

Second, the site safety and civilization management:

civil construction: due to weather, civil construction of concrete, mortar, wall plaster has been stopped, in order to resume work next year smoothly, the site of the various work areas within the construction of all the garbage clearing and finishing.

Installation: the site work area will be organized, for the steel construction and next year to the west three line pour site preparation.

Third, the quality of the project:

Strictly in accordance with the specifications and design requirements for steel materials inspection, so that the quality of installation and welding in line with the design and specification requirements.

Fourth, the incoming materials and equipment:

a, the main plant traveling in the field and installation is complete, and has gone to the safety and quality supervision department for inspection.

b. Incoming materials:

Flue production materials: steel plate 15.134 tons; flue support materials: 16.3 tons.

v. Land acquisition:

Completion of temporary land acquisition for external drainage project and signing of land acquisition compensation agreement; completion of permanent land acquisition for water diversion project clearing basin.

Monthly Project Work Summary Part 6

After a busy and intense workload in May, the work in June is coming to an end, the following I will summarize some of the work of the Engineering Department is as follows:

First, the implementation of the project in June, an overview of the situation

This month's production task force list **. ** There are 9 projects production, including BYD Guangxi Culture Festival, BYD Haikou exhibition, BYD Xiamen exhibition, Kia project rectification, Evergrande Real Estate, CITIC, Desai Electronics and the Universiade of 2 sets and 18 sets of exhibits production. Among them, Evergrande Real Estate in charge of Rao Jieping, CITIC project in charge of Luo Xiaohong, Guangxi Culture Festival in charge of Zeng Liping and BYD Xiamen Exhibition in charge of Shu Pingbo have been completed, and the rest of the projects will be completed at the end of the month according to the planning arrangement, in order to complete the "quantity", and at the same time, we also strive to ensure the "quality". "The rest of the projects will be completed around the end of the month according to the schedule.

Second, the factory operation situation overview

1. Production task completion

In the completion of nine projects this month, Guangxi Cultural Festival, Evergrande Real Estate, CITIC and Kia project rectification has been completed on time, the rest of the project has been arranged for a special person responsible for the production of the team, and now the overall progress of the grasp of the better, in accordance with the plan to be able to effectively complete the task of the time period. The production of exhibits can be effectively completed within the task timeframe according to the plan.

2. Plan first, execute later, emphasize the method, seek efficiency

This month began to strongly implement the planning system, improve the workflow, and ensure the effect. Order documents issued in the process, the schedule is also together to the hands of the project team leader, and in the task of writing a good schedule before the start of work, control of the entire project and the implementation of the project production schedule, do not go formalism. Before loading, the project leader must also fill in the bill of materials on this loading of exhibits, all exhibits are numbered for loading, and detailed checking. The training before the exhibition must also be carried out, on the details of the exhibition and everyone **** with the discussion, research, and let the exhibition staff are clear about the task of the exhibition. At the end of the exhibition, the project team leader was asked to summarize the problems and lessons learned, and the administration made a project summary table to evaluate the effect.

In terms of employee incentives, the preliminary implementation of the excellent staff selection mechanism this month, the detailed criteria have also been posted, the number of people tentatively set for the management of a pacesetter, the staff pacesetter 3; in terms of the welfare system, scheduled for every Monday, an additional meal, Wednesday, Friday, fruit; in terms of corporate culture, the focus is initially set to shape the habits of the staff to create our own culture, in the activities of employees after work, proposed to build a staff recreation and leisure activities, and to build a new culture, to build a new culture. Arrangements, proposed to build a staff recreation room, play the company's promotional videos and movies, TV shows and other programs, and at the same time open the newspaper reading, employee sports activities in view of the age of the factory personnel, the proposed tug-of-war, if the situation permits, the above activities will be implemented in the beginning of next month, the specific details to be perfected.

3. Kia project rectification, pay close attention to the quality and details

In this month's task list, leaders at all levels for the Kia project exhibition tools rectification are very important, I also invested a lot of manpower and material resources in the rectification of the project, for the last car show in the paint, edging, production of the exhibition tools, construction and material selection problems in the rectification of the perfect solution, and also through the exposure of the Kia project, the plant will be a good solution. At the same time, through the problems exposed by the Kia project, the focus of future work is also placed on the details of the exhibition and the quality of the perfect above, to strengthen the concept of time and discipline, in the quality of the efficiency above.

Third, the factory management deficiencies and solution proposals

Insufficient:

1, the factory has emphasized the norms of non-binding, need to be strengthened. (Removal of personnel wearing shorts, resulting in serious leg scratches, etc.)

2, the Executive Department and the factory's handover part is unclear, the two sides lack of prior communication, and the responsible person and the person in charge of the task is not clear, the task time, content and preparation of documents and other timeliness seriously lagging, resulting in the emergence of contradictions, seriously disrupting the production of the proceeding.

3, the team leader's sense of communication is poor, the priority of the task is not dealt with, the work is not rational, the control of the team members is weak.

4, the factory personnel need to act in strict accordance with the requirements of the factory process, the problem to find their own higher level of reporting, do not overstep the report, according to the nature of the problem to find the person in charge of the solution.

5, the staff group consciousness is poor, poor sense of collective.

6, managers' awareness, lack of methods, the effect is not obvious.

7, the manager's inaction. Specifically manifested in the following: all work is arranged by the superiors, the existence of the problem is not exposed, the work lacks initiative, sense of responsibility is not strong, more is not as good as less. A lot of problems at the beginning of the time is often very easy to solve, but the manager is ignored, resulting in the deterioration of the problem. This middle management is actually in a passive, irresponsible state, is a tumor of the factory, must be removed, put an end to. Each manager must conscientiously fulfill their duties, by the system to ensure the implementation, or should be punished supervisor. Recommendations:

① need to adjust the

Idea: Today's management is not specialized in giving orders, and should be with the staff *** with the enterprising, to achieve the goal for the purpose.

Mentality: personal gains and losses, the responsibility of the beginning do not have to be too much, do not think that they are very capable, the first to improve themselves, right and wrong, over time, personal sentiments will naturally improve the recognition of superiors is only a matter of time.

Skills: the staff of the work itself must be skillful, encountered problems first fumble, can not be overcome when asked to teach experienced people, more records, and think about why, because the future staff will inevitably encounter this type of problem, first of all, you will be asked to deal with.

Experience: do not know the problem will not go to prevent the problem, usually from all aspects of the problem point to remember, for my use, do not let myself repeat the occurrence of the production of targeted to the staff to promote, explain, remind, play a role in preventing beforehand.

② need to strengthen the

Requirements clear: the superiors of the matters announced, the operating standards to understand, familiar with the managers should be tired of explaining, assessing, especially acceptance of weak employees.

Training: the most effective, the most direct, the operation of the actual case often told to the staff know, do to the staff to see, and then he did to you.

Employee issues: more in the position of the staff to think, reasoning, facts, less blame, more care.

Management: reasonable planning, scheduling, coordination, so that the production line smooth, not to appear in this idle busy situation, to create a tense, harmonious atmosphere.

③ need to be clear

Factory labeling: the number of the display is clear, to prevent the use of error; production area, stacking area is clearly marked. Factory system: the system is perfect, clear rewards and penalties, there is a law to follow, the production can be normal, can not let the staff to fumble. Management should seek the most reasonable and effective method, or learn from others, absorb the essence of the law. The factory environment: the working environment is dirty and poor is definitely not a good product, the strict implementation of the factory production 5s regulations to ensure the effect.

Summary: The system is standardized and powerful, the plan is clear and precise, the control is in place, the implementation of the time and quantity, the word, the deed, the pursuit of quality, efficiency, discipline! All the efforts are only for the smooth running of production!

Monthly Project Work Summary Part 7

In the work of December, the Huangdao Project Department to take a combination of theoretical and practical ways to carry out a variety of theory, skills training and examination work in the project leadership carefully organized and the professionals to seriously cooperate with the implementation of the training work has achieved certain results.

First, safety training

(a) to participate in the Ministry of Health and Safety Department of the project organization is responsible for the work of the examination pass rate of 100%; to participate in the Ministry of Health and Safety Department of the project monthly organization of the "China Datang Group Corporation work ticket, operating ticket use and management standards", "China Datang Group Corporation, shift handover, inspection system, the regular rotation of equipment and test production standardized management approach" safety test. The company's safety exams have been conducted in accordance with the "China Datang Group Corporation Handover and Inspection System", "Patrol Inspection System", "Regular Rotation of Equipment and Standardized Management Measures for Testing and Production", and the passing rate is 100%.

(b) actively participate in the education and training center organized by the "Youth Cup" safety knowledge contest activities, the project department **** sent four teams, respectively, achieved a first place, two second place, a third place good results.

Second, skills training

(a) According to the actual needs of the Huangdao Project Department and the current human resources equipped with the situation, the Project Department is ready to lift the shortage of lifting drivers and lifting the implementation of the command staff training, the current enrollment work has been completed, and is expected to complete the training in January to obtain a certificate. Timely to meet the project on the special types of operators. Demand. In addition, the project department is also in the education and training center with the cooperation of the active organization of the professional staff of the welding training, training has been carried out twice, the trainees of the welding skills level has been improved to a certain extent. Subsequently, it is also necessary to strengthen the professional training of various professions to further improve the operation skills of new employees welding.

(ii) participate in the Siemens plc system training organized by the Huangdao Power Generation Company, the project department sent four relevant professionals to participate in the one-week training, and will participate in the training summary made by the training staff to be announced on the oa, so that all the staff of the project department **** with the learning to improve.

(c) in order to adapt to the needs of the work, improve work efficiency, the project department focused on organizing the integration of various professionals to control training, so that professionals are more familiar with the operation of the new system, and the transfer of the power plant integration of the management of a brief manual for the practical application of the professional staff reference.

(d) According to the December training needs of each specialty formulated in the year 20__, the professional staff of the production of professional training, and combined with technical lectures, technical questions and answers, on-site questioning, etc., the new college students to improve the level of production skills in the daily training.

Overall, the project department has achieved certain results in the training work in December. The whole project department basically achieved the expected effect of monthly training.

Monthly Project Work Summary Part 8

(a) Strong grasp of science and technology projects. Grasp the major opportunity of the provincial Science and Technology Department's counterparts in targeted poverty alleviation, and actively strive for financial support from higher levels. This year *** for national and provincial projects to support 14, in place funds 6.75 million; municipal science and technology projects 4, support funds 2 million; declared 20 - the first batch of provincial science and technology projects 12, 11 selected alternative project library; at the same time the strict implementation of scientific and technological project management, "eight bans", to strengthen the science and technology program The implementation of supervision to ensure that the use of funds standardized security.

(B) accelerate the pace of transformation of scientific and technological achievements. First, increase the transformation of scientific and technological achievements. 20 - years **** transformation of "new varieties of special vegetables and supporting organic cultivation technology industrialization demonstration" and other scientific and technological achievements 21, to achieve the transformation of scientific and technological achievements output value of 250 million yuan. The second is to carry out scientific and technological achievements review and appraisal. Formation of scientific and technological achievements assessment group, completed the county 20 - annual 11 scientific and technological achievements appraisal, assessment; declared municipal scientific and technological progress awards and was awarded the first prize; organization recommended three scientific and technological achievements declared provincial scientific and technological progress awards; to achieve technology transfer transactions amounted to 7 million yuan. Third, vigorously develop the provincial science and technology innovation-oriented enterprises. This year, declared a new motorcycle for the national high-tech enterprises (to achieve the county's high-tech enterprises 2); new provincial construction of innovative cultivation of 3 enterprises (large agricultural, motorcycle, machinery). This year, the completion of environmental protection building materials, motorcycle new technology, bio-pharmaceutical fertilizers and other high-tech output value of more than 500 million yuan. Fourth, strengthen science and technology demand docking. Carry out enterprise technology demand collection activities, grasp the industrial technology innovation alliance and enterprise production, learning and research cooperation, contributing to 15 enterprises and 10 universities, research institutes of production, learning and research joint. Organize enterprises to participate in the fourth western high-tech industry and financial capital docking promotion meeting, the second China International Science and Technology Fair.

(C) effectively strengthen the protection of intellectual property rights. First, carry out publicity and training. Organized two large-scale intellectual property training throughout the year, invited the Provincial Institute of Science and Technology Information, patent firms held innovation methods and intellectual property protection training, motorcycle and other 17 key enterprises to participate in the training; the organization of the company to participate in the second session of the China (Shanghai) International Technology in and out of the Ease of Use, the show to promote the promotion of new environmentally friendly building materials products. Second, increase the patent application. Carry out enterprise patent "zero" action, **** completed 65 patent applications (including: 10 invention patent applications), the completion of the amount of 37 patents authorized. Third, do a good job of patent application funding. Apply for provincial and municipal patent application funding 25, for patent funding 51,000 yuan.

(D) the establishment of urban and rural science and technology information platform. First, vigorously implement the "science and technology dual-net action". In the "new residence" settlement, leading enterprises, park bases, townships and communities to establish scientific and technological information service website (webpage). Comprehensively completed 43 townships, 12 communities, 9 villages, 1 industrial park, 1 street office *** counting 66 websites (web pages) construction. Second, strengthen the construction of the service system. Focus on the company, the company, the company, the scientific research institute of chicken, tea research institute R & D platform construction, has built pig, chicken, vegetables, tea and other advantageous characteristics of the industry technology service center 5; to carry out the "new rural backbone of the comprehensive quality of farmers training," 3 times, training personnel 216 times. Third, increase the popularization of science propaganda. March 20, joint county culture, health, justice and other departments in Shuanglu successfully held the county's nineteenth "spring of science and technology" science and technology activities in the month of centralized publicity activities; **** issued more than 20,000 copies of popular science information, posted 23 wall charts, accepting public consultation for more than 1,300 times; in mid- to late November to participate in the county Discipline Inspection Commission to carry out 13 activities to send honesty and culture to the countryside, benefiting the masses 26,000 times; batch organization of our county 47 science and technology personnel to participate in the "Xiu Cai" science and technology training courses, science and technology innovation policy advocacy training sessions, science and technology enterprises to enhance the ability to improve the training course learning.