Summarize is a time period of learning, work or its completion of a comprehensive and systematic summary, it can enhance our ability to identify problems, so let's write a summary of it. How to write a summary will not be a form? The following is my carefully organized supervisory year-end summary of 3, for reference only, I hope to be able to help you.

Supervision year-end work summary Part 1

Now I will be in the xx city construction supervision and consulting limited company under the xx west station comprehensive transportation hub south square and underground space (a) engineering project department internship to do the following summary:

In 20xx xx months xx, I came to the engineering project department as an intern. The main building of this project is a local structure containing mezzanine underground 2-story, mainly composed of transportation interchange, public **** supporting services and underground garage, the base area of about 13,500, the plane is an irregular quadrilateral. The project is adjacent to the Shanghai West Station Station in the completed Shanghai Railway Transportation Line 11 North Project on the north side, partially connected to the Shanghai West Station Station of Line 15 in the Shanghai Railway Transportation Network on the east side, with Taopu Road on the south side, and the planned commercial office land on the west side. The main structure adopts cast-in-place reinforced concrete frame structure, and the enclosing structure adopts underground diaphragm wall support, of which the enclosing structure on the north side utilizes the underground diaphragm wall of Shanghai West Station of Line 11, and the enclosing structure on the east side combines with the enclosing structure of Shanghai West Station of Line 15. The depth of pit excavation is about 13.25m, and the north area is constructed by the smooth method, and the south area is constructed by the reverse method.

First of all, the master let me read a lot of supervision data management manual, supervision specification, supervision implementation rules, supervision plan, so that I have a preliminary knowledge and understanding of supervision work. Secondly, I learned the basis of supervision work: engineering construction drawings, technical notes and design briefings, meeting minutes. Supervision contract and by the construction side agreed "supervision planning". Supervision contract, general contract and subcontract (including the owner and the parties signed a variety of agreements). Relevant government policies, decrees, supervision regulations, etc. Other relevant documents national laws, regulations, construction units and construction units signed the construction contract or agreement. Later, the master helped me to explain the main work of supervision: "three control, two management, a coordination", on-site control of the quality of the project, progress, investment; contract, information management; actively coordinate the relationship between the parties involved in the construction.

In order to ensure that the project is completed quickly and well, the supervisors will also take the necessary measures:

1, for the key parts, the important process of on-site side supervision, checking that meets the relevant provisions before allowing the construction of the next process.

2, for the construction of important building materials, when entering the site must check the product factory certificate, or witness sampling, sent to the relevant qualified testing unit for inspection.

3, do a good job of supervision logs, detailed records of each day of the project what happened, in case the project quality problems, so that there can be based on the investigation.

During the internship period, the master for my confusion always patiently explain, and lead me to supervise the actual operation of the data clerk. In these two and a half months of internship, I learned a lot of knowledge outside the textbook, understand the textbook can never understand things, there is a great progress. In college, my major is municipal engineering technology, which involves less knowledge about data. Although I took the data clerk certificate, but has not been applied to the practice, for the theoretical knowledge of only know the skin.

When I first contacted the data clerk, the site project director representative, master gave me great support and help, taught me to learn a lot of post knowledge. And I myself through the previous information, carefully read the supervision specification, read the company's quality, environment and occupational health and safety guide book, by asking the director of the representative, professional supervision engineers and master to learn the supervision of the post knowledge, to understand the supervision work. Before the internship, I had some computer application skills, and the editing of on-site written materials has higher requirements for computer editing and literary skills, I supplemented my knowledge through the Internet query, asking the superintendent's representative and masters for advice. For example, when I initially wrote the minutes of the meeting, even if all the words spoken at the meeting were recorded, but I did not understand the construction site, I was not able to write a qualified in place of the minutes of the meeting, until after more than a month of study and exercise, and now I can independently write most of the written materials.

My main work is to receive the owner, general contractor, subcontracting and related units of the relevant departments issued a variety of documents, information, and registration, archiving, writing engineering meeting minutes, and then accurately communicate a variety of important information to the project; and timely completion of the master and the director of the representative of the task. In the process of internship, I feel more and more the importance of communication. And the most important thing about communication is that firstly, we should respect people, whether it is the front-line workers or the project manager, we should treat them humbly, and secondly, we should take the initiative to communicate our own ideas, so that we can correct our wrong understanding at the first time. At the same time I supervise the practice of work, the role of supervision, supervision of the status of supervision, supervision of the reality of the problem of thinking, every day adhere to the internship diary, recorded a lot of information, expressed their own feelings about these fresh experience, but also express my internship work correct attitude and internship work on a deeper level of thinking.

I work to experience as a qualified information data clerk, must have the following qualities:

1, careful and meticulous. Every day with a large amount of data, must have a careful and serious attitude to treat the site supervision reflects the data.

2, the project situation, the progress should be kept in mind. This is also more conducive to work, such as the preparation of weekly reports.

3, the specifics of the project to understand clearly, the information data officer must take the initiative to understand the causes of the project did not progress, and actively coordinate to solve the problem.

4, information reporting should be clear and timely. Information data officer is not only a relay, can not only play the role of the bridge, must also play the role of the spotlight mirror.

The data is fragmented, all sides of the data to the information data officer here can not appear distorted phenomenon, like a spotlight mirror, the important aspects of the information more prominent, play a role in strengthening. The information data must be generalized, summarized, and analyzed item by item, and reflected in the report of the information.

As a data clerk, careful is very important, the project up and down the file, the issuance of documents should be well documented, the project which people borrowed what things (including a variety of books, instruments) should be registered, when to return to the record, the project newly purchased what the book, what instruments should be registered, together with the number, expiration date of the year and so on. In addition, but also familiar with the application of office software such as word excel, therefore, as a data clerk, but also often tabulation, for example: sent to the site of the engineers, superintendents, supervisors list of lists (including name, gender, title, specialty, contact methods, etc.), and, to collect the documents and information, supervision of the monthly report, the units to and from the issuance of documents categorized into the appropriate file box, the file box inside the name of information typed into the computer to make a directory, the file box inside the file box. The name of the information into the computer to make a catalog, attached to each file box, in order to find.

In addition, the typing speed should be fast and accurate, so there are many things to be made in the form of electronic documents. Requirements of the data clerk to be familiar with the network search. During the internship period, encounter government departments, construction units to check the company, all the work has to be re-filled to check the gaps.

In these two and a half months of internship also see some of my shortcomings:

The organization of information, analysis is not strong enough, professional knowledge is not solid enough, the information is not timely enough to report on the data, the data collection is not skilled enough to organize the work. In the next work, I will focus on the shortcomings of the place, strengthen the video surveillance expertise; more tracking Houjie video surveillance and construction site video project site; clear information data officer's work focus, learn from the master, learn from the strengths and weaknesses, and strengthen the organization of the information ability; report the information focus on the identification of the report in a timely manner to report the report, a comprehensive report. In the future work, I want to be more strict requirements for their own, proactive work, independently deal with some of the affairs, correct deficiencies more learning and good questions, and constantly enrich themselves, do their own work, improve the level of business and working ability, for the development of the project department to contribute a part of their own strength.

Through this internship, I not only learned the professional knowledge, the level of the computer has also improved, especially the handling of interpersonal relationships, but also by the deep inspiration, to thank the director to give me the opportunity to do this internship, so that I have a comprehensive improvement. Shanghai Jianke Construction Supervision can give me a full display of self-strength of the stage, in the Jianke Supervision I will be able to have a better development and a better future. In the future work I will be more conscientious in the performance of their duties, the correct use of authority, to promote the ability to work in business and supervision of the level of data constantly improve the owner to provide a high level of professional services at the same time also provide services for the construction unit, to be technically and construction organization and management for the construction unit and the construction unit of advice, and strive to help solve the problems encountered in the course of the construction and the difficulties encountered in all aspects of supervision work carefully. All aspects of the supervision work.

The sailboat has just sailed, I will be the most full of enthusiasm, the best state of mind, to meet the new year's work. "The long wind and waves always sometimes, hanging straight from the clouds and sails in the sea."

Supervision year-end work summary Part 2

I participated in 20xx in the xx central hospital building intelligence project, xx statistics bureau machine room project, xx digital city management project, xx digital city management project site supervision work.

xx Bureau of Statistics machine room project, xx digital city management project main project has been completed, the project were completed in early 20xx final acceptance, the owner to deliver use. In the process of system delivery and use, our Supervision Department tracked the system upgrade, operation and maintenance, and handling of abnormal situations.

xx Central Hospital Building Intelligence Project is the company's key project in xx. From a strategic level, the quality of supervision services, good or bad, high or low, directly affects the subsequent central hospital equipment bid, the Health Bureau software project supervision business. Director Zhao Juping strict requirements, general agent Cao Xinqi serious and responsible, teamwork, harmonious and complementary, the task to the person.

xx Central Hospital is a people's project, government-led, the performance of the leaders in charge of the project, less time, tight schedule, more tasks. We strictly according to the project management process implementation supervision, not because of the time rush and blind construction, reduce the quality of the project. All things in advance, the first plan program, and then start the implementation. Taking into account the time constraints, synchronization of the various sub-subsystems, sub-floor and decoration units, civil engineering units, hospital construction command, hospital related functions and other interface units to interface and timely review of the program.

xx Central Hospital Building Intelligence Project total investment of about 20xx more than 10 million, **** about 18 subsystems construction, scattered in the old dry building, medical building, administrative building several building areas 30 floor implementation work.

The initial supervision of the project focused on the following aspects

1, drawing review, demand confirmation;

Involved in the civil engineering units, decoration units and internal departments of the hospital's various sub-systems, we have repeatedly organized the project thematic drawing review meeting. Security sub-system video monitoring points of the fixed point quantitative, we provide rationalization proposals for the hospital to save more than 800,000 yuan. According to the requirements of the bidding documents, the owner's needs and the needs of business expansion in the later stage, we have unified the standard of information point location (internal and external network, fiber to the desktop, communication and telephone, one for each), and strictly enforced the standard in the later stage of the drawing review process. In reference to other health care information technology construction experience, the hospital proposed to supplement and gatekeeper selection of the call subsystem.

2, the central server room, monitoring server room supervision;

tracking the construction of the central server room, especially the construction of the decoration subsystem. Room of the six sides of the decoration process is strictly enforced standards, leveling - anti-dust - moisture - heat preservation. Pre-embedded works, bridge, line pipe, over the line box, specifications, thickness, quantity and laying path on-site verification and control. Strong electronic system, the cable diameter of the entry cable matches with the total distribution load and the total switch, and the cable diameter of the UPS head in and out cable matches with the UPS input and output. Lightning protection and grounding subsystem, metal fixtures equipotential connection good grounding, equipment shell protection grounding, distribution cable bus grounding, joint grounding is not greater than 2 ohms, separate grounding is not greater than 1 ohm. Power environment monitoring subsystem, this system is the key to real-time management of the server room, its functional comprehensiveness, performance and stability directly affects the quality of server room management. The ring control is mainly on the precision air conditioning leakage alarm, power distribution leakage and overload, UPS operating conditions, indoor temperature and humidity monitoring.

3, focusing on the bystander building information technology pipeline laying, real-time assessment of the quality of pre-embedded.

The first phase of the main building pipeline laying work is mainly on our side of the supervisory staff is the strength of the work, meticulous work, but also to see the work of the work. Because it involves a comprehensive pipe network, on the pure static water pipe network, fire pipe network, fresh air pipe network, air conditioning pipe network, in the implementation of the design drawings at the same time, but also should be real-time reasonable adjustment of the local path. Field personnel to grasp a few principles, first drawings, after the scene; site level pipe network overlap, without affecting the decoration of the ceiling, vertical adjustment; affect the ceiling or bad indoor feed, avoiding water pipes, near the air conditioning pipe and so on. Unified standards, flexible supervision, real-time scheduling implementation, engineering quality daily inspection, engineering progress three days of nuclear, timely reporting to the leadership of the work, and the articulation of units to ensure that the other interface unit follow-up process normal implementation.

I was transferred in July 20xx from the xx Central Hospital Building Intelligence Supervision Project Department, continue to participate in the construction of xx digital city management project supervision work.

xx digital city management supervision project is the company's key project in 20xx, but also the largest contract value of the project. For the first time independently as a general agent, and undertake such a large project for me, the pressure is very great.

Just into the project team, according to the basic supervision process, seriously study the tender documents, bidding documents. Because the contract to the beginning of October before signing, no contract in the early stage. Through the study of tender documents, bidding documents, summarize the project there are several major risks as follows.

1, personal skills risk;

In accordance with the supervision contract, "three districts and a park" district command center, "City Supervision Command Center" renovation project by our supervision, personal experience, there is a lack of clarity in the management of the key points, the management of the risk of unclear focus.

2, the preliminary planning program, bidding program is not strong implementability;

According to the hardware integration platform bidding for the technical program, the equipment attached to the list of equipment and its program embodied in the construction of the idea of conflict. Virtualization software is available nowhere, about the server into the storage planning is obviously unreasonable, the number of access switches and access to the network functional unit error is large, the number of core switches and convergence switches of optical modules with the planning of the networking needs of the error is large, the number of network security equipment (network gate) configuration with the planning of the network topology map of the actual number of deviations (business network, video network, local office network, the public security network of the security problem), The current allocation of equipment can not meet the large screen display subsystem function to achieve (dual-screen workstations all on the big screen) and so on.

3, the basket project, the project to promote the difficulties;

Hardware platform bid, decorative decoration engineering bid for the basket project. Individual behavior and business mode of operation, weak capital advances, technical strength are at risk. Later in the implementation process, the risk is fully exposed. Hardware platform supply serious lag, into the field 3 months without supply. Because of the funding problem, the decoration project is stagnant, local nodes process delays lead to important nodes of the project lagging behind.

3, construction units, sub-projects, coordination difficulties;

four segments involving four units, the actual subcontracting for eight construction teams. Basic data census base map, outdoor probe location and take power, vehicle-mounted terminal installation of specific vehicles and distribution, the relevant functional units business network link access, etc., involving the project construction team internal and external communication and articulation work, the project is difficult to promote.

4, the bidding section is not reasonable, the construction interface cross, responsibility and work to push the possibility of commission;

Software developers are responsible for the system and even the total integration of the entire project, on the equipment of the intermodulation, the hardware platform integration program to deepen, configuration management, training, who do, what to do, how to do is not clear. I pre-projects in a number of regular meetings (see the minutes of the meeting and supervision weekly report) put forward, late in the local problem or no one to do the situation.

In response to the above several risks, I strive to improve their ability to report to the director, the company, and asked to address the manpower. I meanwhile in many regular project meeting clear to clear responsibility, to do things someone to do, someone to bear the responsibility. I also actively cooperate with the construction command on-site communication, poor external communication and timely feedback to the construction side. Internal communication is not in place, the implementation of things in the end, to work in the form of contact sheets to stay bottom of the supervision and at the same time reported to the construction party leadership approval. Project progress in a timely manner to summarize the progress of deviation risk timely report to the construction side, the project will promote the risk of adverse transfer.

The project on December 31, 20xx, basically completed the construction of the main project. The municipal government is relatively satisfied with the construction of the project. There is still a lot of finishing and improvement work to be continued in the construction of the project, mainly focusing on the following aspects.

1, landscaping data, tree species confirmation

2, "three districts and a garden" command center of the final (cable finishing, marking, cleaning, air conditioning installation) work.

3, municipal supervision of the command center finishing (exposed steel columns, storage room decoration, carpet laying, central control debugging, large screen display subsystems to improve) work.

4, the training of the various sub-hardware subsystems.

5, digital city management implementation methods and performance assessment command manual preparation.

6, the staffing establishment of the fixed post, fixed, the staff team business operation training work.

7, law enforcement vehicles, sweeper car probe, GPS car terminal installation work.

8, the installation of outdoor probes, the installation site of the original work.

9, the development of extended subsystems.

10, innovative subsystems to confirm the demand.

11, hardware subsystems subsystems configuration document organization.

12, equipment connection cable, termination cable marking work.

13, the configuration of each section of the bidding documents, drawings or completion of the documentation of the finishing work.

After another year of refinement and learning, I found myself a lot of shortcomings, need to improve and breakthrough in the following areas,

1, to improve the sense of service, sense of responsibility;

Supervision is to provide a soft service, you must improve the sense of service. According to the supervision contract to clarify the responsibility, scope, work, but at the same time actively cooperate with the construction side. Supervision work can not be limited to the office, just become the contractor's messenger. I personally believe that we should actively go down to the site, find the problem and summarize the main points of the problem timely feedback to the construction side. I also think that the program and plan more and detailed is not absolutely important, the scientific and reasonable program and plan through the implementation of the real effective. Young me remember not to think that the supervision work is easy, good money, small risk, to establish risk awareness, think of danger in peace, preventing and preventing the problem will be reduced to nothing. We are the construction side of the firewall, to always remind themselves of their responsibility and obligation to bear the risk for the party. We must establish, "project problems, promote the adverse, I am the first responsible person" consciousness.

2, problem solving planning, purposeful enhancement;

Efforts to improve skills and accumulate experience, prior to pre-judge the risk, find the problem. Actively stand by the site construction work, the key nodes real-time stand by, diligence can make up for clumsiness, timely detection of problems. Supervision work drive must have their own book of scriptures, logs, weekly reports, monthly reports to be prepared in a timely manner, both for the implementation of the project work short-term comprehensive combing is also a self-summarizing process of improvement. Every day's work should have a focus, grasp the big and small to promote the implementation of the project. Daily work priorities, weekly work priorities, monthly 'work priorities, should be tracked one by one and urge the contractor to put in place.

3, the breadth of learning, digging depth, improve the quality of supervision;

Supervision of the project requires individuals to have the necessary technical expertise. As my personal both to strengthen the breadth of learning, but also have at the same time drilling the depth of learning. I entered the supervision industry has been more than three years, has a deep sense of their own inadequacy. Breadth and depth of knowledge is complementary and not contradictory, learning to be successful must have two points. This requires hard work, calm, fidgety, shallow, proud is not good. In the coming year, I will first of all the company's supervision specifications, construction standards, construction units of the construction program carefully read, through the accumulation of books, practice, and constantly improve themselves.

Supervision year-end work summary Part 3

Looking back, looking ahead, there is the joy of this year's harvest, but also the future of the eager expectations, the joy is that I am in the care of the leadership and colleagues to help, and conscientiously learn to understand the spirit of the company's corporate culture, guided by the company's service concepts through their own unremitting efforts to better complete the work and leadership of the task arranged; the expectations of the deep understanding of the work of the supervision of the company is still in the work, but also in the work of the company, the company is still in the work of the supervision of the company, the company is still in the work of the supervision of the company. Understand that in the supervision of work there are still more deficiencies need to learn and improve, I will summarize the experience, reflect on their own shortcomings, improve their supervision of the business level, to become a member of the company's better and faster development process, is now summarized as follows on the supervision of the work of the year:

First, the main content of the annual work of an individual and the fulfillment of their duties

In the first half of 20xx, I was mainly involved in the Huayuan Pharmaceuticals expansion project site supervision, and in the second half of the year, I was mainly involved in the Qixing Town Xingming Road project site supervision. In this year's work, obey the leadership arrangements, conscientiously fulfill their duties, during the work period, I never relax to strengthen the theory and practice of study, strict requirements for their own, seriously for the construction unit enthusiastic service, in accordance with the requirements of the supervision contract, in strict accordance with the supervision specifications and supervision procedures, to fulfill the duties of supervision.

In the construction process, the use of side, inspection, parallel inspection for each process of process control. On the site of the quality and safety problems, investigation and research to find out the root cause of the problem, requiring the construction side to take effective solutions to solve it, the whole tracking and supervision of the construction side of the implementation of rectification to prevent similar problems from recurring. For the incoming materials in accordance with the standards and design requirements of the construction party to submit the relevant inspection information for verification, the appearance of the material into the field quality inspection, the appearance of the quality does not meet the requirements of the prohibition of use in the project. For the construction of key parts of the project, arrive in advance at the location of the station, check the construction of the preparatory work, and stand by the construction of the whole process, in a timely manner, completely true to the written record of the station.

The hidden works to be accepted in strict accordance with the acceptance specification for acceptance, if the acceptance is not qualified, make it rectify until qualified, before the next process of construction.

The problems found in the inspection of the construction process, the timely use of verbal or written form to inform the construction unit of the project management department, found that the problem of timely reporting to the director, and urge the construction unit to implement the corrective action and review the inspection again. Do their best to do a good job of supervision of the construction phase of the project.

Second, the work of the experience and feelings

In the process of supervision, I through the supervision of the theory of learning as well as the current stage of the development of supervision of the state of the industry's cognitive, deep experience and feel as a supervisory personnel, proactive for the interests of the construction unit, for the quality of the project is responsible for the safety of the construction workers is responsible for the beliefs and infinite supervision work. The belief and infinite power of supervision work. Only with high professional skills and comprehensive quality and good professional ethics, can we really do a good job of supervision of the work, can reflect the law-abiding, integrity, justice and fairness of the practice guidelines. Understand the importance of supervision, set up a correct attitude of supervision, with a pragmatic attitude to deal with the construction of a variety of issues, in order to effectively carry out their work, proactive use of their expertise and ingenuity, scientific and fair exercise of supervision rights and obligations, and construction units to work well with the construction unit to meet the requirements of the construction unit to provide owners with high-quality and efficient service.

Three, the future of work and personal career development.

As a young supervisory workers, love their own work, have a good work style and hard-working spirit, work attitude is strictly prohibited, like to study the causes of problems in the supervision of engineering and methods of treatment, keen on the accumulation of engineering solutions to deal with the problem. In the future work to conscientiously fulfill their duties, we must strictly according to national norms, based on the design drawings to implement the supervision work. In the work constantly reflect on their own shortcomings, strengthen the supervision of business learning, and constantly improve their own quality, and strive to do a good job of supervision, to strengthen the management of theoretical knowledge of the study, flexible and changeable to deal with practical problems, and conscientiously complete the leadership of the various tasks assigned to them, and strive to improve their own level of professional and technical skills to a new level, and truly become a qualified supervisory staff.

Four, concluding

The company's leadership care and support and working conditions of the comfort of my hard work motivation, the enthusiasm of colleagues and collaboration and mutual assistance to my work sense of comfort and sense of solidity, the company's unique corporate culture gives me confidence in my work. I firmly believe that I can do a better job in the future, and contribute to the development of the company.

I wish all the staff of the company a smooth work and a happy life