Engineer's work summary essay 1
xx Radio and Television is a large-scale engineering and construction projects, in the fierce competition in the market, this project is hard to come by, it is my gross division tree flag, create brand important project. Can participate in the construction management of the project, I feel proud and responsibility. This project not only gives me a chance to show my ability, but also gives me a chance to exercise and learn. As a constructor of the project, during the work period, I mainly start from the five factors of man, machine, material, method and environment, firmly combined with the duties of the constructor, and effectively control and manage the construction quality, work process, material, safety and civilized construction. According to the principle of dynamic control, at any time to observe the construction status, at any time to solve construction problems, at any time to stop illegal operation. Specific examples of work are as follows:
First, in the material costs, always with a master attitude of control and management of construction materials. I will material waste of economic losses into two cases: one is visible material waste, such as construction water, steel, steel pipe, lattice column with steel, digging machine, crane non-command operations, etc.; the second is not visible material waste, such as construction of electricity, concrete overfilling too many problems. Visible material waste is a direct waste that can be seen immediately at the construction site, and invisible material waste is an indirect waste that can't be seen at the construction site immediately. I think that for different material waste phenomenon, should be controlled from different sources, sometimes we need to stop immediately, sometimes we need to comprehensive management, with comprehensive control, sometimes we have to turn off a switch, turn off a valve, sometimes we have to pick up a cut of steel more often, we have to keep an eye on all possible places of waste, so that the waste is eliminated before it occurs.
Second, in the construction quality and technology process, according to the specifications, design requirements, the construction process work method strictly implemented into the actual construction. Check and control each process. Guide workers to operate reasonably, in order to improve productivity, to ensure the quality of the project, to ensure construction safety. Talking about the release line, measurement and release line is especially important in construction, a little negligence may cause very large economic losses. Now in the construction site of the measurement of the release line, and not as in the school measuring internship when the measurement of the distance has a front foot, a rear foot, there are readings, there are records so formal, often the scene casually shouted a worker to help, this is really inappropriate, you can not ask the project manager equipped with enough professionals to accompany you to locate, but you have to do it cautiously, feet before and after the ruler to run back and forth.
Third, in the environment, safety and civilized construction, to part-time safety officer's duties require themselves, in the construction process, always stop illegal operation, supervise the construction personnel to wear helmets, fasten the safety rope, in the drilling, concrete filling process to control the mud does not overflow, the concrete does not drip everywhere. In particular, Zhang Gong gave me the task of creating green and civilized site materials, due to the Poetry Division for the first time to create a "Luban Award", all the Department of no reference, which had to collect their own information, including the Internet, on the site as well as visiting the materials obtained from, although cumbersome, but learned a lot of new things, such as the creation of a green site must be "green", "green site", "green site", "green site", "green site", "green site", "green site", "green site". The green site must do the "four sections of an environmental protection" and so on.
Through a period of time before the work experience and summarize, I think the constructor is an important position to reflect the sense of responsibility, in the future construction, there are a lot of construction technology and management skills worth learning. I will be based on the post, in the project work hard, for my company to make more contributions!
Engineer's work summary essay 2
This year, the performance of job duties from the first day I went to the site in the face of the South Bank District Safety Supervision Station attaches great importance to the slope management project. The maximum height of the slope in this area reaches 25 meters, the amount of work, support difficulty, the required construction cycle is long, in order to seek the construction progress and quality of the contradiction between the unity, according to the national guidelines on construction management, policies, laws and regulations and engineering construction of the relevant documents and supervision rules. I supervise the construction of the Department of "pre-control", "in the event of control" and "after the control". High slope support is greatly affected by the rainy season and bad weather, in addition to strengthening the measurement and monitoring, it must be combined with the excavation process to do a good job of drainage measures, as well as the slope surface, the top of the slope to prevent rainfall scouring measures and foot of the slope reinforcement measures. Especially u1-t1 section of the slope adjacent to the 30kv high-voltage pylons, I, as well as my supervisory staff on the section of the slope to carry out special time monitoring, do a good job every day to monitor the log, and urge the construction unit on the slope adjacent to the high-voltage pylons for the necessary protection, do a good job on the slope surface of the rainfall protection measures. I always insist on a qualified supervision engineer standards for themselves. First of all, there should be "five diligent": that is, eye diligence, often to the site to understand the construction situation, more construction drawings, familiar with the design of which is an important part; hand diligence, found that the problem should be often remembered, to deal with which problems to be recorded; leg diligence, often to the site around; mouth diligence, for the construction team easy to check the emergence of the quality of hidden dangers to be often reminded of the construction team should be frequently Brain diligence, familiar with the drawings, brainstorming measures to ensure the quality of the project. In the way of work, the depth of the requirements to do "strict" (strictly according to the construction specifications for construction, strict inspection and gate-keeping), "accurate" (dealing with the problem to be decisive, accurate, to data as the basis for talking), "fine" (careful work), "fine" (careful work), "fine" (careful work). "(Careful in the work, self-care things to be meticulous), "real" (to do a thing to be practical, personally do, to check, encounter quality problems to do substantive processing, can not find reasons to shirk, to solve substantive technical problems for the construction unit, the construction unit). To check and control the quality of raw materials and semi-finished products required for the project, firstly, the construction unit is required to strengthen the management in all aspects such as staffing, organization and management, testing procedures, methods and means, etc., so as to make clear the quality requirements and technical standards for the materials. For rebar, cement and other materials, multi-source, multi-channel, each batch of rebar, cement to do "double control" (i.e., there should be a warranty, certificate of conformity, but also material retest report), untested materials are not allowed to be used in the project, the quality of the material does not meet the requirements of the timely withdrawal from the field. The quality inspection of welded semi-finished products as the focus of supervision, using a combination of visual inspection and testing, first from the appearance of the axial displacement, bending angle, cracked pits, etc.,
and then randomly selected welded specimens for the test, qualified before acceptance. For the most common use of the project, the larger amount of concrete works in the material quality supervision rules require the construction unit to ensure that the cement, sand, stone, water, admixtures, etc. to meet the quality requirements, there are test reports on the premise, and then review the concrete ratio is correct, check a variety of measurement of meters, gauges, whether it is accurate and complete. Pouring of the construction program and construction procedures are feasible. If which process does not meet the specifications and standard requirements, immediately notify the construction unit quality inspection personnel to organize rectification and management. Safety and civilization of construction control aspects of the work, through the study of "Work Safety Law" and in the work process I get some experience, set up a safety prevention-oriented point of view, is to do the work in front, because the accident can be prevented, but unpredictable, the establishment of a corresponding inspection system, the discovery of hidden dangers in a timely manner to rectify the situation, the supervisor in the construction site for the safety of the unshirkable responsibility, I as a member of the project's As a member of the project safety production, in addition to doing a good job in the daily safety inspection work and supervision and management work, but also actively with the municipal construction commission and the municipal safety inspection station of the safety and quality inspection. From the site to date without a single case of personnel and machinery and other safety accidents. By the construction unit and the construction unit of the many favorable comments.
Engineer's work summary essay 3
Since 20xx xx month recognized as an engineer, I have always been in the xx Highway Engineering Co. During this period, I try to study professional and technical knowledge, in the process of technical management efforts to implement the "new technology, new structure, new materials, new equipment", scientific and technological innovation and technological progress has been devoted to the passion. Engineer professional and technical positions, has been in xxx special maintenance project construction, has served as project chief engineer, project manager. The quality of many projects have reached excellent engineering standards.
In the construction of the first line of work in five years, in the company's general manager and the company's chief engineer under the direct leadership of the technical management of meticulous, strict control of project quality. After several years of hard work, all the construction of the company's project manager has established a strict management system, and access to the internationally recognized quality management system for building construction enterprises xx certification. Over the past five years, in the process of contributing to the development of the company's own ingenuity, but also to make the individual's professional and technical potential has been enriched and improved. In short, five years from I did some useful work, but there are also many problems to be improved.
Now the five years of professional and technical work is summarized as follows:
First, the promotion of the use of new technologies, the construction of high-quality engineering
In November 20xx, I was in the xx to xx highway water damage repair engineering project department as chief engineer. At that time, many sections of high slopes are not the same degree of landslides or collapses, in order to repair the road as soon as possible, without affecting the traffic disruption, the schedule is a political task, but the water damage repair project design drawings are incomplete and not standardized, due to the time in a hurry, some of them are not designed, and some of the engineering design is not at all scientific. Three of the slopes are mainly stone slopes, just a few loose stones collapsed down, the overall slope stability or to meet the requirements. But the design is the anchor frame beam reinforcement of the slope, if the anchor frame beam construction, high altitude construction difficulty, the construction period can not be guaranteed, after the analysis of the actual geological structure, recommended to change to msn active protection network for protection of stony slopes.
After repeated demonstration of the owner or the use of this new technology, the construction period ahead of the two-thirds, but also save the project cost, after a few years of operation, the slope is stable, there is no anomaly.
The quality of the project is the life of the building construction enterprises, and to get good quality of the project, it requires technical managers to have an advanced sense of creating excellent projects, as the project's technical leader, led by me, first of all, start to establish and improve the project department of the relevant technology, quality management system. In accordance with the project engineering construction methods, with me as the leader, the project quality objectives are decomposed into various professional and technical positions, in accordance with the requirements of the technical positions in the organization of construction.
Successively established a technical review system, engineering quality inspection system, hidden acceptance system, and quality control measures and semi-finished products protection measures and a series of management system beneficial to ensure the quality of the project. Strictly in accordance with the design and construction drawings and national norms, regulations and general atlas requirements of the construction, and in accordance with the requirements of creating high-quality engineering detailing practices to carefully complete each sub-projects, to achieve the "create a high standard of quality engineering" quality goals. Through the direct participation and control of the technical work of the project, the quality, progress and efficiency of the project have received better results.
Second, strive to study professional and technical business, do their jobs
Since the work of xxx Highway Engineering Co. In many projects, due to time constraints, heavy task, had to voluntarily put down their personal rest time, focusing on the work, overtime, no complaints, fully embodies a young professional and technical personnel should be the vanguard of exemplary role.
In the daily work, I rely on solid professional knowledge and theoretical foundation, work like a fish out of water, from the construction site of the technical guidance and quality inspection and acceptance to the construction of technical data verification and management, the work of all kinds of proficiency. In the work of the composition of the technical documents and a variety of declarations to do a rigorous structure, terminology standardization, for the enterprise has won the honor.
Third, the implementation of computer office, with high-tech means to improve the economic efficiency of enterprises
I am in the study of professional and technical knowledge at the same time, but also strive to explore and study the computer software, hardware knowledge, the xx series of software successfully applied to the daily management of the construction in the study and practice, and strive to promote the management of engineering computer management information, the application of word, the application of the word of the construction of the project. Computer management of information, the application of word to complete the word processing work, print a variety of records forms and text materials; the application of excel to complete the storage and analysis of engineering information processing for engineering decision-making to bring the quantitative basis; the application of xx production of training electronic slides, the use of modern multimedia forms, lively, lively explanation of construction technology knowledge and construction construction knowledge, completely changed the traditional way of education and training. The way of education and training, so that high-tech, modernized technical means to truly serve the production and quality management.
xx computer-aided design and drawing software in the work of the popularization and application, so that the construction technicians completely get rid of the heavy drawing board and pencil hand drawing of the burden, so that the project drawings have become very simple.
I through the study and research computer software, hardware knowledge, hands-on practice, and completed the construction of the company's internal computer LAN, so that each section of the computer to realize the resources *** enjoy, in addition to *** enjoy the data, but also be able to *** enjoy such as printers, to save a lot of valuable funds, and achieved good economic benefits. In order to adapt to the needs of the times, but also to continue to learn, constantly update their knowledge. To this end, I take every opportunity to participate in various training courses, technical exchange activities. During the engineer's tenure, has participated in the relevant departments to organize a variety of thematic training for many times, and obtained the Ministry of Transportation registered supervision engineers and testing engineers certificate.
The above is the main technical work I have been engaged in the past five years, through the book learning, learning from practice, learning from others, coupled with self-analysis and thinking, really have a greater harvest and progress. Achievements and shortcomings exist at the same time, experience and lessons learned go hand in hand. I will continue to work hard to overcome the shortcomings, summarize the experience, learn from the lessons, and make my work better.
Engineer's work summary essay 4
Time flies, in the blink of an eye to the company has been almost a year, a lot of feelings, a lot of harvest. Into the xx electric company, become an electrical engineer, for me is a good opportunity for development, but also a good exercise and enhance their ability in all aspects of the opportunity. Here, first of all, special thanks to the company's leadership and colleagues to give me strong support, care and help, so that I can quickly adapt to the company's management system, and strive to do their jobs. Since entering the company, I seriously understand the development of the company's profile, learning the company's rules and regulations, familiar with the company's process. At the same time, it is a real feeling of positive, stimulating corporate culture, so that I benefit greatly. I now summarize my work over the past year as follows:
First, solid work
In the workshop of the installation group, a soft line group, a copper group and the secondary line group for three whole months. We entered the box variable from the workshop, it can be said that the workshop is our first impression of the box variable company. I have to say, the workshop workers gave me a good image, so that I benefited a lot.
In October, I entered the technical process office internship, I y feel the colleagues dedicated, strive for perfection. Into the office of the Ministry of Technology began, I know my own burden is very heavy, I always keep in mind the words "to give others a bowl of water, they have to have a bucket of water. Because I know to become a qualified technician is not an easy thing, as a technician not only to be able to deal with the requirements of the customer, but more importantly, to be able to solve the problem on the scene, the scene of the operation of machinery and equipment to do a good understanding.
Second, study hard, keep improving
In the work, study seriously, constantly improve themselves, and use other time, learn more new knowledge. From the simplest manufacturing specifications to draw up, to draw a complete set of drawings, where both their own diligence, more inseparable from the office colleagues to answer questions and solve problems. From the old engineers I not only learned a lot of things, but also gave me a lot of insight. For my first design drawings, colleagues not only carefully help me to review and patiently explain to me, thank you very much for the help of colleagues, but also in our company such a cultural atmosphere in the better work with sufficient confidence.
Third, shortcomings and deficiencies
As I joined the work not long ago, so in many areas of technology and experience are not enough, encountered more problems, to deal with the problem can not do. In the future work, to dare to solve and deal with problems, encounter problems, never escape, and humbly to the experienced technicians, old workers to learn; in addition, timely organization of lessons learned, the existence of doubt, do not understand the aspects of the record, and seize the time to solve the problem, make a good record in order to meet the same thing in the future, to be able to faster solution to deal with good. Seriously study the knowledge of the box change, so that they are in the future work, can better complete the work and tasks assigned by the leadership, so that they are faster to mature.
Fourth, self-evaluation
Although I participated in the production of labor and technical learning time is only half a year, but in the ideological and technical have been greatly improved and progress. Both enriched knowledge, but also improve their management and business level, and most importantly, for their own work in the future, to be able to better fulfill the work task laid a good foundation.
Summarize the work of the year, both achievements and shortcomings. In the future work, only continuous serious summary, find shortcomings, and strive to correct, in order to get faster progress, in order to better serve the company, to realize the value of life.
Engineer's work summary essay 5
20xx year operation and maintenance department under the direct leadership of the branch and the diligent efforts of all employees, the successful completion of the network maintenance, network construction, network security and other tasks, a strong guarantee of the Banna jurisdiction of the development of the digital television business, the whole year's work summarized as follows:
2) The new district network new construction projects to establish seven, the implementation of seven and other several optical nodes network coverage area, promoting the development of business and business income increase.
3)Completion of the completion of the metropolitan area network completed pipeline built 4.98 kilometers and supporting facilities.
4) Operations and Maintenance Department must be timely and carefully reported the month's "Network Maintenance Monthly Report", "Security Hazards Monthly Report", "Electronic Dispatch Weekly and Monthly Report", "Newly Installed Users Monthly Report" of the work.
2, network optimization construction
Operation and Maintenance Department in the branch under the direct guidance of the leadership of the real-time urban network optimization is not complete regional locations for uninterrupted network optimization and line transformation work.
3, township network construction
1) According to the provincial and local companies and county branch arrangements, led by the branch leadership in person, at the beginning of the year, the county under the jurisdiction of the township network of the digital television before the whole transfer of planning and design.
2) In 20xx, the county's 20 townships under the jurisdiction of the 16 townships of the network optimization and transformation and 1 township network of the new work.
3) county and township networking township cable TV subscribers to the entire transfer of 3,540 households, township cable TV subscribers 1629 newly installed. The county township cable digital TV users totaling 5169.
Second, strengthen technical training, improve the quality of the team
Operation and Maintenance Department bear the main team of the branch project construction, in the face of engineering construction, network security, trunk safety important task to be completed in a short period of time in a high quality and quantity, whether it is the organization of the work, or the technical work there are more difficult problems.
To this end, the branch to carry out technical training as an important measure to ensure the quality and progress of the project to grasp, take the way to go out and come in, not only repeatedly sent employees to participate in the provincial and local companies held training and learning, often use the department to meet the time to organize the operation and maintenance staff to focus on learning and training, but also with neighboring sister companies to face-to-face experience and technical exchanges to improve the maintenance of personnel Skills 20xx year-end summary of operations and maintenance engineers work summary.
Third, there are problems and shortcomings
1, the current operation and maintenance of the Department as a whole to strengthen the ideological understanding, improve efficiency, enhance the level of service.
2, pay special attention to production safety, and improve the network trunk inspection work.
3, the Department of Operations and Maintenance of the current extreme lack of new technologies, new business cutting-edge talent, for the next digital two-way network, data and other new businesses, to strengthen the ability to undertake new maintenance tasks technology training and business learning.
4, strengthen the management of operation and maintenance documents to improve the quality of maintenance. Do a good job each month must be timely and carefully reported to the various types of reports.
5, with the further expansion of the urban network, transportation issues not much constraints on the rapid response mechanism of the Operations and Maintenance Department.
Fourth, 20xx year work plan
1, continue to grasp the network maintenance quality management and technology maintenance level, improve the quality of network operation.
2, continue to grasp and grasp the province of one or two trunk line inspection work.
3, actively cooperate with the preparation for the start of construction and other work tasks of the metropolitan area network, local transmission network, urban pipelines and township network construction services.
4, according to the plan to do a good job in the network of new, cell new project and construction and completion and acceptance of the work.
5, the implementation of the Department of Operations and Maintenance of the management system, a clear target management, rationalize the workflow, improve work efficiency, enhance the level of service.
6, improve the production safety system, improve production safety.
Engineer's work summary essay 6
I often browse some management or other aspects of the book or website, learning a variety of knowledge, to improve their overall ability. In the future, I will improve my own quality through continuous learning and practice, so that their own progress and social development synchronization to meet the needs of the work. Now the work of the year is summarized as follows:
First, to participate in the work of the experience
Previously heard that the mechanical work of the work of the tired, workers are very hard to come to the company to feel the hard work of colleagues in the Qiyuan colleagues on the use of the four special to describe the special, especially able to suffer, especially able to work, especially able to dedication, and especially able to endure. Colleagues have three seasons a year on business trips, can not take care of their parents, wives and children, they work hard, never a complaint, this selfless spirit of dedication is what I must learn. I learned how to face difficulties, how to be a human being, and set up a correct outlook on life and values in the exchanges with workers. Whether in the field installation and commissioning or in the company's equipment, the quality of the equipment is more and more demanding, the technicians must be strict control, especially on the low old bad problems and mandatory provisions of the management. Through three years of work and study I feel as a technician must be careful, conscientious, do a good job every step of the work, be familiar with the process, be familiar with the drawings, be more familiar with the norms, but also to continue to learn and engineering-related, and professional-related knowledge, with knowledge to arm themselves. In the work on the wind and rain is another year, the company gives every time to give me the opportunity to my trust, my test, but also to my forging. Indeed, born in fear, die in peace and happiness. In today's fierce competition forces you to learn, to self-reliance, to challenge themselves, to adapt to the high demands of others. And only in this taut string, only feel life full, rich and meaningful. Soon I mastered the method of mechanical work. People only really understand the great work of the mind, the environment will not become an excuse for failure.
Work learned a lot of knowledge for their own work in the future more added impetus, I like our company's spirit of practical work, "; drop by drop, the pursuit of perfection";;, a person should be so, only from each small thing to do before accumulating more experience, the work of the setbacks and failures can not be avoided, we just need to face it frankly will be enlightened a lot of truth from it. People who can't withstand setbacks can't do a good job, because everything can't be done at will, and we can realize something behind the successes and failures. We technical service personnel should be from a variety of diseases in the process of summarizing the experience of the real user households to do a good job. At the same time in the process of work, we can feel the company's concern and expectations of us, so everyone should try to do their jobs well for the development of the company to contribute to a force.
Second, the ideological experience
xx year is my real work on the first year, for work or career, everyone has a different understanding and feelings, I am the same. For me, I usually from two angles to grasp the pulse of their own thoughts.
First is the mindset, to quote a famous person's phrase "; attitude determines everything";. With the right attitude, in order to use the right method, find the right direction, and then achieve the right results. Specifically, my attitude towards work is to choose my favorite, and then do my best for my favorite. I have always believed that work should not be a task or a burden, it should be a kind of fun, a kind of enjoyment, and only if you are interested in it and thoroughly in love with it, you will be able to fully realize the joy of it. I believe that I will find the joy of my work in the hard exploration and discovery of this business, and I can do my best for it without reservation. It can be said, know how to enjoy the work, you know how to succeed, during the period to come not half a bit reluctant.
Secondly, it is a question of ability, which can be divided into professional ability and basic ability. The understanding of this issue I can use a simple example to illustrate: to a camel, professional ability to determine its ability to survive in the desert environment, while the basic ability, including the degree of adaptability, perseverance, natural alertness, and so on, determines how long it can survive in the desert environment. When it comes to people, professional competence determines your suitability for a certain kind of work, while basic competence, including self-confidence, ability to collaborate, ability to take responsibility, spirit of adventure, and potential for growth, will directly determine the vitality of the work. A successful person in the cause, must be two abilities can be well coordinated development and operation of the person. xx year, I had a new state of mind into the work, and strive to learn and improve the ability to work. Positive response to the company's measures to strengthen management, to comply with the company's rules and regulations. In less than a year's work time, although some achievements, but there are also many problems in the work is mainly manifested in:
1, the lack of innovative spirit.
Can not proactively play their own ability, but passive and negative to adapt to the needs of the work. Business volume can basically be completed, but they will not take the initiative to lead the work away, very passive. As a result, some opportunities have been lost, and the work has not risen to a certain level.
2, the work is not very solid.
The existence of the eye of the low, lazy hands of the problem, can not focus on the work of learning, a lot of knowledge, but not fine, in the company's training can not be active in the speech, did not completely let go of their own.
This is my summary of the work of the year, not much to say. But I think the actual action to make it more convincing. So in the future work I will strive to continue to consolidate the existing achievements.