Decoration works in the materials, equipment difference in price treatment

Decoration project construction contract

Party A:

Party B: XX Decoration and Design Co.

In accordance with the "Chinese People's **** and the State of Economic Contracts Law" and "Regulations on Contracting for Construction and Installation Works" and relevant provisions, the bidding to determine Zhoushan Tianxin Decoration and Design Co. This contract for both parties to implement.

Article 1: Project Overview:

1.1 Project Name:

Project Location:

Decoration Construction Unit: XX Decoration Design Co.Ltd.

1.2 Project Scope:

1.3 Contracting Forms: Contracting for Labor and Materials

1.4 Total Contract Cost of the project is tentatively set at CNY: Upon completion. According to the actual settlement.

1.5 Settlement: the amount of work actually completed project settlement, unit price according to the Zhejiang Province construction project budget quota, decorative quota unit price settlement. Missing items according to the actual group price, the number of labor days calculated according to the quota, the unit price of a separate difference, the difference in price of materials according to the city of material information price adjustment. Material difference is adjusted according to the market price of the city without information price. (The unit price of the project is settled according to the negotiated price), and the sporadic projects are settled according to Party A's on-site visa list. Project billing only 8% comprehensive rate.

1.6 construction period: the contract duration of days, from January to January completion.

Article 2: responsibilities of both parties

(a), Party A's responsibility

2.1 is responsible for the solution of Party B's construction water and electricity.

2.2 Check the progress, quality and safety of Party B's construction, and acceptance in time after completion.

2.3 Actively create construction conditions and coordinate with construction units.

2.4 Party A's representative at the site.

(B), Party B's responsibility

2.5 The project should be equipped with specialized personnel for technical responsibility.

2.6 Project decorative materials shall be approved by Party A before construction.

2.7 Do standard construction, civilized construction, ensure safety.

2.8 Party B in the construction of safety accidents, its responsibility and costs are borne by Party B.

2.9 After the completion and acceptance of the site should meet the requirements for use. Before leaving the site, the lights should be bright and the ground should be clean.

Article III: acceptance of the project and warranty

3.1 The completion of the project by the A, B quality supervision personnel to form the completion of the acceptance of the construction process acceptance. The project must be accepted within one week after completion. If the quality is not up to Party A inspection quality standards, Party B should be promptly repaired until the quality of qualified through acceptance.

Article IV: payment methods

4.1 Within three days of the signing of this contract, Party A pays Party B 40% of the total cost of the project for the project prepayment; the volume of work is completed 50%, recognized by the Party A construction personnel and then pay 50%; the completion of the project to pay for the decoration (5%). Warranty period of one year to pay the remaining amount (5%).

Article 5: Other

5.1 The end of this contract, by separate negotiations.

5.2 This project, such as the occurrence of man-made irresistible factors, its duration and cost of negotiation.

5.3 This contract shall be in four copies, two copies for each party.

5.4 This contract shall enter into force after both parties have signed and sealed it, and shall expire after the completion of settlement and settlement of payment.

5.5 This contract is accompanied by a budget, the amount of work in accordance with the actual settlement

Party A: Party B:

Legal representative: Legal Representative: Legal Representative:

Accounting Bank: Account Bank:

Account: Account:

Signing Time: Signing time:

XX Decoration Design Co. >Address: Budgeter:

Tel: Fax:

Budget

Buildings area to: Page No.:

Project name: Date:

Serial No. Project Unit Unit price Quantity Total Remarks

A Living room. Dining room

1 Crocodile latex paint on the roof

2 Crocodile latex paint on the wall

3 Plasterboard linear modeling roof

4 Skirting board installation

5 Curtain box

6 Black walnut window cover

7 Shoe cabinet

8 Modeling lining wall

9 Dining room wine cabinet

10 TV cabinet

11 Other wall molding

2 Bathroom

12 Plastic steel ceiling (strip)

13 Floor tiles (including cost of materials)

14 Wall tiles (including cost of materials)

15 Masonry wall (single wall)

Package of black walnut veneer door sets

17 Do walnut finish wood frame glass door

18 Wall waterproofing

19 Package riser

20 Doorway finished marble paving

21 Washbasin countertops (including labor cost auxiliary materials mirror)

22 Washbasin (including faucets)

23 Shower enclosure (including the base of the shower faucet)

24 Toilet seat