Annual filing flow chart annual filing process

How to apply for the charging pile filing license?

(1) new energy vehicle home charging pile application process

Declaration conditions

(a) construction filing procedures complete;

(b) according to the procedures to complete the project completion and acceptance;

(c) the annual date before the date of completion of the commissioning of the project and did not receive construction subsidies;

(d) unconditional access to the Chongqing Municipal Electric Vehicle and Charging Facilities Monitoring Platform (hereinafter referred to as the "municipal monitoring platform") and data exchange;

(e) the annual filing of the charging pile application process. (d) unconditional access to the Chongqing Municipal Electric Vehicle and Charging Facility Monitoring Platform (hereinafter referred to as the "Municipal Monitoring Platform") and data exchange;

(e) real-time online rate of charging infrastructure of not less than 90%;

(f) have the relevant full-time technical personnel to ensure the safe and stable operation of the equipment and a sound operational management system;

(g) have not had major safety accidents;

(h) have no major safety accidents. ) has not had any major safety accidents;

(viii) meets the relevant standards of "Electric Vehicle Charging Facilities Standard System Item List (2015 Edition)" issued by the National Energy Administration;

(ix) the construction follows the relevant laws, regulations and standards and norms, and is in line with the "Measures for the Management of Construction and Operation of Charging Infrastructure for Electric Vehicles in Chongqing Municipality" (YuDaReformEnergy〔2017〕 No. 1264 ).

Declaration materials

(i) a copy of the charging operating company's business license and charging infrastructure construction filing documents;

(ii) a copy of the charging infrastructure equipment purchase contract and VAT invoice;

(iii) Chongqing charging infrastructure construction subsidy fund application form;

(iv) a letter of commitment from the enterprise (v) Information on the account bank and bank account number of the charging operation enterprise;

(vi) For the declaration of subsidies for the construction of dedicated DC charging infrastructure mainly for buses, cabs, net cars, time-share vehicles, logistics vehicles and sanitation trucks, the charging operation enterprise shall also provide documents proving the contracted stations and other relevant materials;

(vii) other relevant materials and description.

All the above materials shall be stamped with the charging operator's seal. Charging operators should also prepare project completion and acceptance reports, electricity payment vouchers and other charging infrastructure into use, operation and management system and operation and maintenance records, proof of operational capacity and other relevant information for on-site inspection.

Reference: People's Government of Dianjiang - Electric Vehicle Charging Infrastructure Construction (Charging Pile) Subsidies

(2) How to apply for enterprise standard filing of electric vehicle charging piles

According to the provisions of the online or the hall to go to the declaration of the record.

(3) national new energy facilities charging pile construction to what departments to apply for approval

First of all, the installation site to give consent, generally property sign a consent form, if you want to declare the power need to submit an application to the power, there are still parts of the region need to agree to the installation of the fire department letter of advice

(4) the community to install electric vehicle charging pile how to report to the Power Supply Bureau

According to the Power Supply Bureau published on the home electric vehicle charging pile related business introduction, and consultation of self-use charging facilities reporting materials business comb.

(5) professional charging facilities operator access directory application report model

Secondary operation of communications services is illegal, please owners be careful

(6) where to apply for the reporting of charging piles

If you are a customer within the service area of the Guangdong Grid Corporation, the information required for the reporting of the business is as follows:

1, the head of the household identity card;

1, the head of the household;

1, the head of the household identity certificate;

1, the head of the household identity certificate. /p>

2, electricity address property ownership ownership certificate;

3, such as entrusted to another person need to provide the proxy identification and authorization letter;

4, such as bank deduction of electricity bills need to submit the relevant payment information.

5, for the occupation of community public **** place of the project, such as community parking lot, etc., but also need to provide the owners' committee or property owners issued by the charging infrastructure construction of the consent letter.

6, such as only rented parking spaces, at the same time need to provide the consent of the owner of the parking space, the owner's identity documents, as well as electricity bill guarantee, customer statement.

Customer statements include:

①Statement that I am legally renting the residence;

②Statement that the residential electricity costs incurred by the tenant himself;

③Statement that in the case of the power supply enterprises can not contact the tenant, agree to the property owner or the original housing rental enterprise to the power supply enterprises to handle the relevant cancellation or renaming of the transfer procedures.

Note: If the installation is for human defense parking space, it is necessary for the property owner to issue a property certificate or the customer to provide a certificate of right to use the human defense parking space.

The required information must be provided in the original, and a copy of the original verified by the customer and signed by the customer, the enterprise and public institution customers in the copy of the signature and official seal. Residential customers are required to sign and confirm their signatures on the "electricity bill", while corporate customers are required to affix their official seals on the "electricity bill" when they go through the process.

The information varies from city to city, so please refer to the information provided by the staff.

Processing route:

WeChat attention to the "Southern Power Grid 95598" public platform>My Electricity>Business Processing>Electricity Consumption Application>Select the type of new business to be processed and follow the prompts to fill in the basic information and upload the relevant information>Check the box "I have read and agreed to the Endorsement Contract and confirmed the endorsement". I have read and agree to the Endorsement Contract and confirm that the information submitted is true and valid" and then submit.

After completing the application, the power supply department will arrange for staff to make an appointment with you to visit your home, complete the on-site survey and collect the processing information for you to install the meter and send electricity.

We hope that our can be helpful to you.

(7) apply for charging pile operating qualifications need to have what conditions

Apply for charging pile operating qualifications:

1, with large real estate companies, commercial chains, the Traffic Management Bureau delineation of on-street parking management units, other management units with parking spaces signed with the cooperation of the station and the operation of the management agreement (the investor is responsible for the charging station and management, the organization is responsible for) (The investor is responsible for placing the charging station and managing it, the organization is responsible for providing the site and guaranteeing the safety, and the charging and value-added benefits are shared by both parties***).

2, and large-scale strength of the local branches of enterprises (PetroChina, Sinopec, funds, etc.) have the ability to associate.

3, with the local branch of the national grid to obtain the qualification of joint venture.

4, with the government departments concerned (Science and Technology Commission, Science and Technology Association, urban construction, urban management, electric vehicle leading group, the Economic Commission, Development and Reform Commission, etc.) to contact and carry out joint venture or apply for funding (disguised policy support).

5, charging facilities construction, operation services, maintenance and management in line with national and municipal relevant technical standards, design specifications, construction standards and management requirements.

6, charging facilities enterprises will belong to the social public charging facilities access to municipal public charging facilities data information service platform.

(7) charging facilities construction filing application for extended reading

Charging pile construction construction conditions and standards:

1, the enterprise in the residential district parking lot construction of public *** charging facilities should be obtained more than 2/3 of the owners or owners' association agreed.

2, individuals in their own parking garages, parking spaces, the residential areas, units in the existing parking spaces to install special charging facilities without the need for construction agreements, only in accordance with the relevant requirements for installation.

3, independent of the public charging facilities project charging pile should be not less than five, and pile spacing is not greater than 10 meters, the total power is not less than 100 kilowatts.

4, charging facilities for charging equipment shall comply with the interface, security, communication protocols and other national standards or industry standards. Due to innovation, technological progress and other factors occurring for the time being no corresponding national standards, industry standards or national standards, industry standards are not clearly defined circumstances, can be temporarily implemented in accordance with enterprise standards.

(8) how to apply for the construction of car charging station

need to follow the following steps:

Step 1: Charging conditions confirmed

Before building a car charging station, you need to confirm whether the charging conditions are available, mainly to see whether there is a fixed parking space, and at the same time, the property consent to the installation of the charging pile of the application.

(8) charging facilities construction filing application for extended reading:

Car charging station and car gas station is similar to a "power" equipment. It is a high-efficiency charger that can quickly charge cell phones, electric cars and other electric vehicles.

The development of electric vehicle charging stations in China is inevitable, and seizing the first opportunity is also the way to win. In the current situation, although the state has vigorously advocate, the enterprises and stupid, but electric cars into the common people's homes is not easy to do in the short term.

National policy can be given (compensation for the purchase of cars, on the road, etc.), while the electric car charging station network can not be built in the short term, the main reason is to give the electric car fast charging needs instantaneous strong power electricity, conventional power grid can not meet, must be built special charging network, which involves the entire national grid transformation, the national grid transformation is not a small matter, costing a huge amount of money from the discussion, the project to become a network, non can be realized overnight.

A better solution to the fast-charging problem is to replace the long charging process with a battery replacement.

A car needs to be equipped with two batteries, and when one battery runs out, it automatically switches to the other, which can then be replaced by a fully charged battery at a power station. The replaced battery is charged and maintained by the power station, provided that the charging station has a considerable number of spare batteries.

The advantage of this method is that it is fast, and the user can be on the road after changing the battery, faster than even refueling. With this method plus parking lot charging piles and other aids, I believe the popularity of electric vehicles is close at hand.

9 (9) the construction of new charging pile public **** station what formalities are required

Formalities: copy of ID card, proof of ownership of the parking space (which can be issued by the property), the property agrees to the installation of instructions to the staff. In addition, should also pay attention to the following aspects:

About the property: contact the property company to determine the community charging pile installation policy. Currently for the installation of charging piles, the general rule is to require ownership of the parking space. In addition, some properties are less suitable for the installation of charging piles due to earlier construction. If the installation of charging piles requires additional investment in technical equipment, be sure to communicate with the property in advance.

About the parking space: examine your own parking space. District will have a lot of power distribution room, the owners have to choose their own a distance from the nearest parking space, so that when the installation can save a lot of money. In addition, some districts have installed charging piles, you can learn from your neighbors, there are some precautions are not "over the person" will not understand. In short, it is to determine the shortest route for the installation of the charging post.

About the site visit: to conduct a site visit, the power company's engineers will notify the charging pile company a time, when the property electrician, charging pile company, the power company and the owner should be on the scene, to determine the final construction program.

About installation: after determining the construction program, it comes to the step of installation and construction, according to the different conditions of each community and the location of the garage, the construction time is also different, some only need 2 hours to get it done, some may need a whole day to complete the construction.

About acceptance: after the construction is completed by the charging pile company will go to the power company to report, the power company to go to the site acceptance, acceptance will be given to the meter to impose a seal, and then the power company will make the corresponding card, and the charging pile company to receive the transfer to the owners, or the owners to go to the power supply to receive.

(9) charging facilities construction filing application for extended reading:

As the grid distribution side of the electric vehicle charging piles (bolts), the special nature of its structure determines the automated communication system is characterized by the measured points are many and dispersed, wide coverage, short communication distance. And with the development of the city, the network topology requires a flexible and scalable structure, therefore, the selection of electric vehicle charging pile (peg) communication mode should consider the following issues:

(1) Reliability of communication - the communication system should be subjected to harsh environments and strong electromagnetic interference or noise interference for a long time and maintain smooth communication.

(2) construction costs - in order to meet the premise of reliability, comprehensive consideration of construction costs and long-term use and maintenance costs.

(3) Two-way communication - not only to achieve the upload of information, but also to achieve the control of the amount of downstream.

(4) Multi-service data transmission rate -- With the growing volume of terminal services in the future, the communication between the master station to the sub-station and the sub-station to the terminal requires more and more high data transmission rate for realizing multi-service.

(5) communication flexibility and scalability -- because the charging pile (bolts) has the characteristics of many control points, wide and decentralized, requires the use of standard communication protocols, with the development of the "ALLIP" network technology trend and the growing business of electric power operation, it is necessary to take into account the need for standard communication protocols. With the development of "ALLIP" network technology trend and the continuous growth of electric power operation business, it is necessary to consider IP-based service bearing, and at the same time, it is required to facilitate the installation, construction, commissioning, operation and maintenance.

Reference:

Network: charging pile

(10) how to apply for public charging pile, what formalities are required

How to apply for public charging pile, you need to customer identification materials; customer identification materials; electricity address property ownership information; for the occupation of the community's public **** place of the project, such as the community parking lot, etc., you also need to provide the owners' committee or property issued by the charging infrastructure construction The consent of the owner's committee or the property. If the user only rents a parking space, it is also necessary to provide the consent of the owner of the parking space.

The function of the charging pile:

Similar to the gasoline dispenser in a gas station, it can be fixed on the ground or wall, installed in public **** buildings (public **** buildings, shopping malls, public **** parking lots, etc.) and residential parking lots or charging stations, and can charge various types of electric vehicles according to different voltage levels. The input of the charging pile is directly connected to the AC power grid, and the outputs are equipped with charging plugs for charging electric vehicles.

The charging pile generally provides two charging modes, conventional charging and fast charging, and people can use specific charging cards to swipe the card on the human-computer interface provided by the charging pile to use the card, and carry out the corresponding charging modes, charging time, cost data printing and other operations, and the display screen of the charging pile can show the charging amount, cost, charging time and other data.

How do I file my medical card?

1. The process of reimbursement for urban medical insurance begins with hospitalization in a public hospital designated for medical insurance → within three working days of hospitalization, you must register with the hospital's medical insurance office for the record → when you are discharged, you must go to the hospital's medical insurance office to open a hospitalization application form, hospitalization invoices, itemized lists, and medical records.

2. If it is a traumatic injury, you should also go to the hospital medical insurance office to fill out the traumatic injury form and stamped with the official seal of the hospital and the official seal of the insurance unit, write a good description of the situation of each person, the insured unit's information or proof → to the second floor of the Social Labor Security Bureau office to reimbursement. For reimbursement of urban residents' medical insurance, the original of the above materials is required. If you need to reimburse the commercial insurance, please photocopy all of the above materials and stamp them with the hospital's seal, so as to be prepared to report the use of commercial insurance.

3. If you have the New Rural Cooperative Medical Program, you can't apply for it at the same time as the urban residents' medical insurance; you can only apply for it in one place. If you have commercial insurance, you should first apply for urban residents' medical insurance, and then apply for commercial insurance; if you apply for commercial insurance first, then the urban residents' medical insurance will not be reimbursed.

2, different reasons for hospitalization health insurance reimbursement process specific process is as follows

1, sick hospitalization: hospitalization within three days, with a medical insurance card or ID card, household register and other valid documents to the hospital medical insurance office medical insurance networking procedures, when discharged directly to the hospital medical insurance office settlement procedures.

2, trauma hospitalization: within three days of hospitalization, with a medical insurance card or ID card, household registers and other valid documents to the hospital health insurance office health insurance networking procedures, by the city (district) health insurance office audit section investigation, in line with the provisions of the health insurance reimbursement, when discharged directly to the hospital health insurance office billing procedures; not investigated clearly or have objections to the hospital, after the hospital, with medical records, invoices, settlement statements, a copy of the bankbook and all other documents to the hospital Jianxing Bank. After being discharged from the hospital, bring the medical record, invoice, settlement statement, copy of bankbook and all other documents to the Municipal Medical Insurance Office for investigation, and then go to the Urban Residents' Medical Insurance Management Section for reimbursement.

3. Accidental injuries in outpatient clinics: After the treatment is finished, bring all the documents such as outpatient medical records, invoices, and a copy of your CCB bankbook to the Municipal Medical Insurance Office for investigation, and then go to the Urban Residents' Medical Insurance Management Section for reimbursement.

Three:

Medicare refers to social medical insurance. Social medical insurance is a social insurance system established by the state and society in accordance with certain laws and regulations in order to provide protection for the basic medical needs of workers covered by the insurance in case of illness. The basic medical insurance fund consists of a general fund and individual accounts. The basic medical insurance premiums paid by individual workers are all credited to individual accounts; the basic medical insurance premiums paid by employers are divided into two parts, one of which is allocated to individual accounts and one of which is used to establish a comprehensive fund.

On January 12, 2016, the State Council issued the Opinions on Integrating the Basic Medical Insurance System for Urban and Rural Residents, which called for promoting the integration of the urban residents' medical insurance and the New Rural Cooperative Medical Insurance systems, and gradually setting up a unified medical insurance system for urban and rural residents nationwide.

On December 20, 2016, the Ministry of Human Resources and Social Security held a video conference on the work of nationwide networking of basic medical insurance and direct settlement for medical treatment in other places, and signed a work responsibility letter with 22 provinces, including Beijing, that applied for the first batch of provinces to start the nationwide networking of basic medical insurance and direct settlement of medical treatment for medical treatment in different places across provinces, marking the official shift of the work of direct settlement of medical treatment for medical treatment in different places across provinces to the implementation stage.

Enterprise annual report information disclosure filing time or charter?

Enterprise annual report information disclosure, filing time, not filing charter. Enterprise annual report information disclosure, is the time year for the record after the filing, according to an annual enterprise information disclosure. That is, the enterprise annual report information is engaged in business activities on a yearly basis, in the national enterprise credit information disclosure system for the annual report publicity, not for business registration, without the need for corporate charter filing. Therefore, the enterprise annual report information publicity, filing time, not the filing of the charter.

How to register the enterprise liaison?

Enterprise liaison registration in the national enterprise information disclosure system, open the site, and then click on the enterprise information to fill in, and then click on the enterprise liaison registration can be.

Changing the business liaison and cell phone number requires that you go back to the business registration window for liaison registration, and directly overwrite the previously filed information to change to the new liaison information.

The following materials are required to be submitted for the liaison officer's filing:

1, "Enterprise Information Disclosure Liaison Officer Filing Form";

2, proof of designation of entrusted agent;

3, copy of business license (except for the newly established registration).

The specific process is as follows:

1. Enterprises should log on to the local enterprise credit information disclosure system, fill out the "Enterprise Information Disclosure Liaison Officer Filing Form" online in the window of "Enterprise Annual Reporting System", submit it after filling out and print it out, and submit the printed out filing form to the legal representative ("person in charge") for signature and stamping of the unit. person in charge) to sign and stamp the official seal of the organization.

2, the enterprise to the registration authority to submit the "enterprise information disclosure liaison filing form", by the registration authority and the system to enter the contents of the check, on the spot to be filed, and in the enterprise annual report system to confirm the completion of the filing.

3, the enterprise liaison through the filing of the cell phone number to receive the password to log on to the information disclosure system to the industrial and commercial authorities.

What needs to be done next after the project is filed?

The next step to go to the planning for planning conditions, land for land pre-approval, and then survey and design bidding, land use planning permit, signing of the transfer contract, the land certificate! Do engineering planning permit, annual plan, start certificate!