Do you need environmental protection procedures for crushing waste tires?

Generally speaking, the environmental impact assessment procedure for handling second-hand tires is divided into the following steps:

1. Project establishment 1. Prepare project document 2. Bring the project documents to the opening of the district to handle the project filing (ask the materials needed for filing before going).

Ii. EIA 1. After the filing is completed, take the filing materials to the local environmental protection bureau for environmental assessment. If only the EIA report form is needed, the enterprise can fill it out independently, and basically no cost will be incurred; If it is necessary to prepare an EIA report, the Environmental Protection Bureau will recommend several qualified assessment agencies to help complete the preparation of the report and all the work in the EIA, and the selection of EIA agencies will incur costs.

2. Choose the EIA agency to sign the contract, and the cost generally depends on the investment amount.

3. The EIA agency will visit the site, and the enterprise will provide all the information and details needed in the EIA (production process, details of various raw materials used and annual consumption, storage methods, waste treatment methods, raw material components, etc.). ). In addition, whether there is noise and how to solve it; Whether there is industrial wastewater and how to treat it; Whether there are harmful gases in the waste gas and how to deal with them; Whether there is waste residue and how to deal with it; How to deal with all kinds of industrial waste, etc. )。

4. The EIA agency shall prepare specific contents (such as noise, odor concentration, non-methane total hydrocarbons, VOC, etc.) according to all kinds of equipment, raw materials and auxiliary materials used in the project. ), test frequency (test for several days, test several times a day, etc. ) and the inspection points of the air environment around the project site (several inspection points are set around the factory). Enterprises apply for testing at environmental monitoring stations or third-party testing institutions with the testing contents issued by EIA agencies.

5. After receiving the test report, submit it to the EIA agency.

6. Retrieve the questionnaire from the EIA agency and conduct household surveys in the homes of nearby residents and surrounding enterprises and institutions. The EIA agency will have certain requirements for the number of survey copies, and the survey results will be fed back to the EIA agency.

7. If hazardous waste will be produced in the production process, a contract should be signed with the corresponding environmental protection treatment enterprise.

8. The entrusted EIA agency prepares the EIA report; Publicity of project information (newspapers, Internet); Organize expert review meetings; Modify the EIA report according to expert opinions; The revised EIA report shall be submitted to the Municipal Assessment Center, which shall issue a technical assessment report; The project can only be developed and constructed after the approval of the district environmental protection bureau and the final approval issued by the environmental protection bureau.

9. Start construction and put the project into production.

10. After the normal production of the project, apply to the environmental monitoring station in the district for environmental protection acceptance 1 1. After the acceptance, the whole EIA process is over. Unqualified acceptance, rectification again, until qualified.

Legal basis:

Industrial standard conditions for comprehensive utilization of waste tires

Article 2 Project Location and Enterprise Layout

(a) enterprises should comply with national industrial policies and local urban and rural construction planning, ecological environment protection planning and pollution prevention, overall land use planning, main functional area planning and other requirements, and their construction should meet the requirements of standardized design.

(2) In areas where the construction of nature reserves, scenic spots, drinking water source protection areas, permanent basic farmland and other laws and regulations is prohibited as determined by national laws, regulations, administrative rules and plans or approved by the people's governments at or above the county level, and areas with residence, medical care, culture, education, scientific research and administrative office as the main functions, enterprises may not be built, rebuilt or expanded.

(3) The production capacity design of an enterprise should be adapted to the recoverable amount of waste tires.

(4) The land use procedures in the factory area of the enterprise are legal (the lease contract should be no less than 15 years), the factory area and production area should be matched with the comprehensive utilization and processing capacity, and the waste tire storage site should meet the requirements of recycling management regulations.