Generally, there are the following:
1, the general list of drawings
2, architectural design drawings
3, structural design drawings
4, electrical design drawings
5, water supply and drainage design drawings
6, fire design drawings <
7, ambient design drawings
8, intelligent design drawings
What should be included in the preliminary design of the building
The owner asked the preliminary design of the building professional, that is, the program phase of the design, not that the engineering design.
1, building description (including a variety of design basis, building a variety of indicators must not be missed)
2, the ground floor plan, the floor plan (or standard floor plan), the roof plane, the main cross-section and the necessary longitudinal section, the main elevation, side elevation, etc.
3, ladder room, kitchen, toilet local plan and the necessary section.
What to include in the preliminary architectural design
Preliminary design documents include:
1. design basis and description of approvals, norms, environment and building profile, design ideas, etc.;
2. Ground floor, standard floor plan to meet the use of the construction side of the function and the relevant norms;
3. main elevations, sections, can be combined with the city streets, environment, traffic, view of the city. The main elevation plan and sectional plan can combine with the needs of city streets, environment, traffic and observation;
4. The professional plan and systematic plan of water, electricity and equipment can meet the requirements of use function;
5 II Relevant indexes The indexes of urban planning and the indexes of use function.
What are the editorial contents of the preliminary design document?
1: General Overview Overview of the construction unit, project name, design scope, guiding ideology, production program, production and compensation, design estimates and so on.
2: General Transportation Design basis, the general layout of the plant, district layout, transportation, fire protection, greening and beautification, and the amount of work.
3: process Overview of the product process and product process flow diagram, production equipment, staffing, use of raw material consumption.
4: civil construction design based on the normative documents, local natural conditions, site engineering geology and hydrogeology.
5: water supply and drainage local meteorological data, production and living water, plant water status and other information, and then determine the drawing of water supply and drainage piping plan.
6: heating, ventilation and air conditioning According to the local meteorological conditions, product process requirements to determine the required heating, ventilation and air conditioning equipment models and specifications.
7: heat engine According to the product process requirements to determine whether the need for heat and compressed air.
8: Electrical According to the installation capacity of process equipment, lighting and other power supply indicators to determine the power distribution system.
9: Environmental protection and labor protection According to the product process whether the "three wastes" and their emissions, the treatment program and the effect of clarification.
10: labor safety and health, including the project's fire prevention, explosion-proof, lightning, anti-static, anti-mechanical injuries, as well as muffling, vibration damping, vibration isolation, ventilation and dust removal, lighting, shower dressing, infirmary and other aspects of the supporting content.
11: fire fighting The availability of fire fighting equipment and facilities.
12: Energy saving Including daily water consumption (production), electricity consumption, steam energy saving measures.
13: General estimates and financing Including construction costs, equipment purchase costs, installation costs, labor and equipment costs, other costs.
What to include in the preliminary design of the structure
Preliminary design content includes: general description and building chapter, structure chapter, water supply and drainage chapter, electrical chapter (strong electricity, weak electricity), air conditioning and ventilation chapter, fire prevention chapter, fire prevention chapter, environmental design and protection chapter, labor safety chapter, budget chapter and other specialized chapters and chapters of the description.
What is the preliminary design of the project, what exactly does it contain, can you send me a sample
Preliminary design of the project First of all, the cover requirements are as follows: Project name: competent departments: construction unit (Chapter): Project Manager: Project Supervision Responsibility: (generally for the Office of the person in charge of the relevant business units) Project legal representative and contact phone number: construction location: construction period: prepare Unit (Chapter), personnel and contact telephone: Preparation time: Format and requirements: Chapter I General. Including project construction background, objectives and tasks, design basis, design scope and so on. Chapter II General Layout. Including the general layout of the project and the main technical indexes of the general layout, etc. Chapter 3 Design content (i.e.: main construction content) Chapter 4 Process design 1. Process technology program (1) Principles or routes of the selection of process technology of the proposed project. (2) Process technology program of the proposed project. (3) Prepare the block diagram of process flow, technical parameters or description of each process link. (4) Explain the advanced nature of the selected process technology, maturity, reliability and economic practicality. 2, equipment program: according to the type of project, process technology requirements, construction standards, select and configure the appropriate instrumentation, explain the proposed selection of process equipment and ancillary equipment based on and justified, and prepare a list of instrumentation, will have and new list; instrumentation list includes equipment name, specifications, units, quantities and the main technical parameters. Chapter V Architectural and structural design (including design basis and design requirements, design scope, design content, etc.). Chapter VI water supply and drainage, heating and ventilation design. Chapter 7: Electrical design. Including power supply, electricity, lighting, lightning protection and grounding design. Chapter 8 Agricultural production measures and infrastructure design. Including field engineering, rice planting greenhouses, net rooms, auxiliary engineering design and field farming machinery selection instructions. Chapter 9 Environmental protection and safe production design. 1, for projects with pollution, to put forward specific treatment technology programs and measures, pollutants can meet the appropriate emission standards after treatment. 2, modern agricultural machinery and equipment to promote the project and processing projects to have the possibility of threatening the safety of people and production facilities to analyze and describe the factors. Chapter X Project Estimate and Financing Program. 1, investment estimation (1) The content of investment estimation. Including the description of the estimation and the preparation of the total investment estimation table, individual project investment estimation table, instrument and equipment investment estimation table. (2) Investment estimate preparation instructions. To the total investment estimate, single project investment estimate table and instrumentation investment estimate table in the amount of approval, the type of structure of the construction project (instrumentation refers to the specifications), the unit price (or unit cost) and a variety of taxes and fees rates based on the value of and the reasons for each explanation. (3) Preparation of investment estimate form. (1) the total investment estimate table: according to the project construction costs, construction costs, other costs, reserve costs for the total investment in project construction (or total investment in fixed assets). 2) individual project investment estimate table: according to the specific construction content of the project where a separate design, separate construction, independent role of a single project (such as the independent construction of scientific research and laboratory buildings, warehouses, sunbathing, greenhouses, drainage, wells, etc.), should be prepared for individual project investment estimate table. Civil works, field works, supporting works, etc. Estimates include the name of the project, the unit, the number of works, the unit price, the total price. (3) Instrumentation investment estimation table. According to the list of instruments and equipment to prepare the instrument and equipment investment estimation table, according to the laboratory instruments and equipment, agricultural equipment, other equipment (mainly refers to general equipment, furniture and other equipment). Instrumentation and equipment estimates include the name of the equipment, specifications, units, quantity, unit price, total price. (4) Investment estimation basis. (1) If the current investment estimation indexes and estimation quotas for civil and water conservancy projects of the local or industry sectors are used, but the enacting departments and enacting time of these indexes or quotas should be stated. Based on the competent department's document on the requirements for the preparation of project investment estimates, the name and document number of the document should be stated. (2) The amount of works and the number of instruments and equipments shall be based on the amount determined by the construction program, but the calculation method and the basis of calculation shall be further explained. (3) Other costs of construction. Including feasibility study report preparation fees, design fees, research and testing fees, environmental impact assessment fees, supervision fees, bidding fees, construction unit management fees. The estimation of other costs of engineering and construction is estimated according to the calculation methods and cost standards of other costs of engineering and construction issued by specialized agencies, and is generally controlled at about 5% of the construction cost of engineering and construction. 4) ......
What is included in the preliminary design of the structure
Hello, the Ministry of Housing and Construction in 2008 issued the "depth of the preparation of design documents for construction projects regulations", which are clear provisions for the preliminary design of the various professions, you can find a version of this version, according to the provisions of the above step-by-step to fill in the structure of the preliminary design of the part of the preliminary design, including the text, drawings and so on.
What does the preliminary design include? 10 points
What are the national key technical transformation project approval procedures and regulations include?
Technological transformation project pre-work procedures include: project proposal, feasibility study report, preliminary design, and the preparation of the start of the report.
(1) the approval of the project proposal;
All projects included in the "National Key Technological Reform Project Plan" are regarded as projects, enterprises can prepare project feasibility study reports accordingly.
(2) the approval of the feasibility study report;
1) projects with fixed asset investment of more than 200 million yuan (including 200 million yuan), according to the affiliation of the enterprise undertaking the project, by the competent department in charge of the industry or the provinces, autonomous regions, municipalities directly under the central government, municipalities separately listed in the plan
For details, please check the attached file