Kindergarten water emergency plan
In the weekday study, work and life, sometimes face natural disasters, serious accidents, environmental hazards and human damage and other emergencies, in order to control the development of the accident, it is often necessary to prepare an emergency plan in advance. How do we write an emergency plan? The following is my collection of kindergarten water shutdown emergency plan sample, welcome to read and collect. In order to ensure the normal life of the children in the garden, the following water and power outage plan is formulated.
First, the establishment of water and power outage emergency treatment leading group:
Group leader:
Group members:
Second, the water and power outage treatment program:
1, the departments in the occurrence of power outages do not panic, organize the children of the class.
2, the power outage teachers should be reasonable arrangements for the class of children's activities, as far as possible to organize the children in the outdoors or other places with good light activities.
3, after the water and power outages, the emergency response team must do a good job of managing the work and identifying the causes. If the cause of the park circuit or water pipe burst, immediately arrange for personnel maintenance; maintenance can not be immediately reported to the power supply or water plant maintenance.
4, in the water and power outages, the emergency team must immediately work to ensure the safety of young children, teaching staff.
5, after the water and power outages, the logistics staff should actively support the work.
6, after the winter power outage, the classroom teachers can be in the children into the dinner candles, but must ensure safety.
7, and the kindergarten gate of the cake store to contact the water source, after the water outage cafeteria staff to the cake store to get water (the store from the water), for the cafeteria, to ensure that young children two meal production; class caregivers to get water for the class of young children to wash their hands, flushing toilets and so on.
Kindergarten water emergency plan 2
In order to correctly, effectively and quickly deal with water and power outages, minimize the impact of water and power outages and losses, to ensure that the company's normal production, office order, the development of this emergency plan.
First, the scope of application:
Water, electricity related equipment damage and natural disasters caused by water, electricity supply crisis caused by the company's normal production, office constitutes a significant impact and a serious threat of water, electricity events.
Second, the organization
Leader: assistant general manager (administrative system)
Members: the head of each system, the head of each branch, the head of the security team, the Department of Administration, equipment commissioner, administrative commissioner.
Third, the steps
(a) water shutdown
1, planned water shutdown
(1) the company's external maintenance or internal maintenance needs to stop, the Department of Administration received the water company or the company maintenance department notification half a working day in advance of notification of the affected departments responsible for informing the specific time of the shutdown and the water supply The company has also been working on a number of new projects, including the development of a new water supply system, and the development of a new water supply system.
(2) each department received the notice of the water outage to the water equipment to carry out a check, if necessary, shut down the machine; kitchen received the notice should be prepared in advance to use water; the security team leader should fire water system
to confirm the storage of water to ensure that the fire water system is always in a state of work; cleaning staff should be in the use of the more frequent use of the public **** washroom to prepare some water for everyone to wash their hands with. Cancel after normal water supply.
(3) Each department to close the departmental area of the water faucet or valve; security personnel to close the public **** restrooms, supporting rooms and other areas of the water faucet or valve; restaurant in charge of timely closure of the restaurant area of the water faucet or valve.
2, sudden stoppage of water
(1) unknown reasons for the emergency stoppage of water occurs, the Ministry of Administration learned of the news should immediately notify the property to investigate the cause of the stoppage of water, and at the same time to the water supply company to ask the cause of the stoppage of water and the time of resumption of the water supply, and timely feedback to the person in charge of the system and the person in charge of the branch.
(B) blackout
1, planned blackout
(1) the Administration Department collects or receives external or internal blackout information, and then promptly notifies the person in charge of each system, the person in charge of each branch, the person in charge of each department by phone and informs them of the specific information about the blackout and the adjustment of work time programs, etc.; such as blackout in the work time, the Administration Department should contact the person in charge of each system, the person in charge of each branch, the person in charge of each department 10 minutes before the power outage. If there is a power outage during working hours, the Administration Department should confirm with the person in charge of each system, branch office and department 10 minutes before the power outage, and save the computer information or close the relevant equipment in advance; the kitchen should do a good job of preparing meals in advance.
(2) 10-20 minutes before the restoration of power supply, the Department of Administration should notify the person in charge of each system, the person in charge of each branch, the person in charge of each department to confirm that the positions of electrical appliances and equipment in the closed state, to avoid unstable voltage burn equipment.
2, sudden power outages
(1) when a sudden power outage occurs, the Department of Administration should immediately notify the property to investigate the cause of the power outage, by the head of the security team, the Department of Administration, equipment commissioner to the power supply office to ask the cause of the power outage and the time of the resumption of power supply, clear reasons for the outage, the person in charge of the administrative system to determine the temporary working time adjustment program, the Commissioner of the Administration to timely feedback to the person in charge of the system, the branch heads, department heads and classroom managers. The administrative commissioner timely feedback to the head of each system, branch, department heads and shuttle bus drivers; and notify the kitchen to do a good job of preparing meals.
(2) holidays or evening sudden power outages, the security team should contact the power supply office to confirm the cause of the power outage, and notify the Commissioner of Administration, the Department of Administration will feedback the information to the heads of departments.
(3) In case of power outage in the evening, the security team should strengthen the inspection work in the factory area, and if necessary, the day shift personnel can be deployed to strengthen the security until the power supply is restored.
Fourth, this emergency plan since the date of publication.
Kindergarten water outage emergency plan 3In order to deal with the hospital may occur water outage accident, minimize the disruption caused by the water outage on the normal medical order of the hospital and property damage, the development of this emergency plan.
First, the development of the principle
In the event of a hospital-wide water supply, in line with the "to ensure that the focus, to maintain the operation of the" principle, the implementation of effective and efficient repair and disposal, as soon as possible to restore normal water supply, to ensure that the normal operation of the hospital and the stability of the order of medical care.
Second, the scope of application
This plan applies to the hospital due to the planned suspension of water and the hospital water supply network failure caused by the suspension of water emergency treatment.
Third, the emergency organization
The establishment of water emergency working group, under the emergency repair team.
1. water emergency working group
Leader: Zhu Xiaozhong
Members: Xiao Haichun Tan Chenglin Tan Lingyun Luosong Yang Chenyu
Duties:
(1) do a good job of the daily safety of water supply, the implementation of the responsibility of the production safety system, to prevent water supply due to the failure of the pipe network within the hospital occurred.
(2) the occurrence of water outages, water emergency work in a timely manner, shut down all the hospital water boiler power supply, to avoid water outages caused by the boiler burned out.
(3) According to the severity of the water outage, the decision to start and terminate the emergency plan.
(4) If necessary, request external assistance.
(5) Power Department is the first responsible department to fulfill the duties stipulated in this plan, members of the Power Department should be under the command of the team leader to do the emergency work in the event of a water outage.
2. Emergency repair team
Team leader: Liu Shaohui
Members: Du Yaobing Tian Changjun Wu Chuanjun Zheng Jiayong He Xiang Wang Jing
Duties:
(1) regular inspection of the hospital water tanks in the course of their daily work, and found abnormalities, timely maintenance.
(2) when the water stops, the organization of personnel to implement the start of the secondary water supply, and the appropriate adjustment of the water pressure in the corresponding area, stop the hot water supply and non-medical, living water.
(3) Report to the leading group of logistical support, if necessary, to the relevant departments to send a request for assistance, and afterwards summarize the lessons learned from the emergency work.
Fourth, logistics emergency procedures
1, received the Enshi City Water Supply Company water notification, the general duty to promptly tell the hospital clinical, medical and technical departments to make preparations for the use of water;
2, due to the damage of water supply pipeline network sudden water supply, the General Affairs Section is responsible for contacting the water supply company to ask for the reason for the water supply suspension and water supply time and Report to the competent leadership and office;
3, the General Affairs Section in a timely manner with the Enshi City Water Supply Company to do a good job of urban water supply coordination to ensure that the hospital as soon as possible to resume water supply;
4, the start of the secondary pressurized water supply facilities, the implementation of limited water supply in different time periods to ensure that the key departments, the water supply of the fire;
5, the plumber to hold on to their posts, monitoring the operation of the secondary pressurization equipment state, to prevent equipment ` damage, and monitor the water situation in the hospital, do a good job of water conservation;
6, the departments with the preparation and response to water cuts, to ensure that the key equipment and critical patient water;
7, serious water shortage, should immediately report to the hospital, the hospital reported to the relevant departments of the state government, to contact the fire trucks to transport water, to solve the patients, employees living water and clinical business water. The first time you have to go to the hospital, you will have to go to the hospital to get the water.
Fifth, the clinical department emergency procedures
(1) received a notice of water shutdown, do a good job of water shutdown preparation. Tell the patients to stop water time and instruct them to save water; give the patients ready to use water and drinking water.
(2) When a sudden water shutdown occurs, contact the Power Department in a timely manner to explain the water shutdown, and the water supply shift to find out why.
Six, received the logistics department after the water notice, the hospital's key departments emergency procedures
(1) operating room: all scheduled arrangements for the day of the surgery postponed, and to the patients and families to do a good job of explaining the work; storage of a certain amount of hand washing water, in order to be prepared for the emergency surgery used.
(2) supply room: pre-arranged for the day of the suspension of water required by the hospital disinfection package, if necessary, overtime disinfection sterilization, try to meet the clinical needs.
(3) Laboratory: biochemistry stopped, properly stored blood samples collected on the day, and immediately after the resumption of water supply arrangements for testing.
(4) Emergency Department: Pre-stored a certain amount of clean water, in order to prepare for trauma, poisoning patients gastric lavage and other emergency rescue used.
(5) canteen: according to the notification of the time of the suspension of water, in advance to do a good job of cleaning and steaming of the hospital patients and workers meals, in order to ensure food hygiene on the basis of guaranteeing the supply of food to all the hospital patients and workers.
(6) outpatient and the following four floors of the department: storage of the appropriate amount of water for hand washing.
(7) When the hospital resumed normal water supply, each department must check the faucet in the department one by one, to prevent the water overflow and waste caused by the water outage.
kindergarten water outage emergency plan 4(a) understanding of the situation
1, received a notice of water outage, prepare for water outage. Tell the center staff to conserve water during the water outage time; notify the staff to store water in advance.
2, the occurrence of sudden water outages, to get in touch with the water supply in a timely manner, to understand the situation of water outages, including the length of time out of water, the reason for water outages, when to resume water supply.
(2), emergency procedures
1, planned water emergency procedures
(1), the logistics department in the water supply company notification of water supply suspension of the phone or other forms of water supply suspension notice, must ask the time of the suspension of the time, stop how long and the reasons for the suspension of the water, and make a good record.
(2), logistics notify the nursing team leader (night notification of the general duty staff), notify the hospital office and other departments of the center, explaining the reasons for water cuts, the specific time of stopping the water, how long to stop, and do a good job of preparing for the temporary water supply.
(3), if the time is urgent, after receiving the notice of the water supply company, should immediately notify the center departments (night notification of the general duty officer), explain the situation, send a notice to the departments, including walkie-talkie verbal notification and radio notification, to make clear the time of stopping and delivering the water, and make a good plan for stopping and delivering the water.
(4), notify the caregiver to do a good job of explaining to the elderly.
2, temporary water emergency procedures
(1), there is a temporary water supply, should immediately ask the water supply company by phone, ask the reason for the suspension of water and the duration of the suspension.
(2), notify the center's departments and administrative general duty, explaining the situation.
(3), such as water outage time is relatively short (within 12 hours), notify the departments and the elderly to explain the reasons, do a good job explaining the temporary water outage.
(4), if the water outage time is longer, you should immediately prepare to start the emergency plan, in accordance with the planned water outage emergency procedures.
(5), the center of the internal causes of water outages, to identify the causes of water outages, timely repair, in the shortest possible time to eliminate the fault, restore water supply.
(C), emergency security
1, the center duty phone at any time to ensure that the means of communication is open.
2, daily do a good job of water supply pipelines, valves, found that the problem is dealt with in a timely manner.
3, if the water stops more than the specified time (8 hours in winter, 4 hours in summer, and other seasons as appropriate) then purchase mineral water as the center personnel drinking water.
4, if the water outage time of more than 48 hours, then you can contact external assistance to send water, such as firefighters.
5, emergency water supply, the hospital has a reservoir to protect the center of the basic water and canteen water, if the elderly need water, caregivers to take the initiative to the canteen to get water.
(4), Note
1, please staff to do a good job of explaining the elderly and appeasement work.
2, Logistics Department to confirm the stoppage of water with walkie-talkies and radio to notify the elderly and caregivers. The content includes:
Appease the elderly, notify the elderly not to use the water dispenser, notify the caregiver to unplug the water dispenser in the elderly room and turn off the water dispenser mainframe water main gate, notify the other staff to turn off the water dispenser mainframe water main gate. And remind each other.
3, after the resumption of water supply, to logistics to use the radio and walkie-talkie to notify the staff, the first to open the wash faucet in each area to release the water containing impurities, and then open the main gate of the drinking fountain host.
;