Yes, there is, Mason Golden Valley - Xiwei Green Surface Treatment Circular Economy Industrial Park - located in Huazhou District, Weinan City, which is the core area of Xiwei East District.
The project is 3 minutes from the Lianhuo Expressway, 15 minutes from the passenger and railway station, 18 minutes from the Weinan Center, 30 minutes from the Xi'an City Center and 60 minutes from the Xi'an Xianyang International Airport.
The park has selected a high quality environmental protection operation company to operate the park's sewage treatment center with a daily wastewater treatment capacity of 12,000 tons, in accordance with the classification of wastewater quality; 110KV substation, with a dedicated capacity of 100,000 kVA, to ensure the normal production of electricity needs of the enterprises; the park has also set up a special thermodynamic power supply center, with a supply of 300,000 tons per annum, and a centralized heat supply, with a steam pipeline network laid to each plant area, which provides sufficient supply. Steam pipeline network is laid to each plant area, with sufficient supply and on-demand use. In addition, the project can reach two major hazardous and solid waste treatment centers (Pearson Solid Waste Disposal Project and Shaanxi Rongyuan Renewable Energy Hazardous and Solid Waste Treatment Project) in 5 minutes.
Phase I covers an area of 195 acres, with a building area of about 180,000 square meters. The plant has 50 years of independent property rights plant, plant area of 590-15,800 square meters enterprise on demand, storey height 6.6-7.9m, the longest length of the workshop 120m, load 1-3T / ㎡, 5T freight elevator, a ladder, independent lifting platform, loading and unloading platforms and so on.