Simple Contract for Sale and Purchase of Equipment

Buyer: ________________

Seller: ________________

After full and friendly consultation between A and B, we hereby enter into this contract on the purchase of _________ items for *** with compliance.

I. Name, specification model, quantity and price of the equipment

____________________________________

II. Contract price

The total price of the equipment is RMB (in capitals): _________

The total price includes the amount of the equipment, packaging, transportation insurance, loading and unloading fees, installation and related materials, commissioning fees, software fees, inspection fees and training required and taxes.

The total amount of this contract shall not be changed or adjusted.

Three, the contract takes effect

This contract will take effect after signed by both parties.

Four, payment

Goods acceptance, equipment installation, commissioning and normal operation. The buyer pays 100% of the total contract price to the seller.

V. Delivery, Packaging and Acceptance

1. Delivery place: according to the location specified by the buyer.

2. Delivery time: within _________ days after the contract comes into effect.

3, the seller will ship the goods to the delivery place at once. And the name of the goods, model, quantity, external dimensions, unit weight and precautions, etc., to notify the buyer in writing.

4, equipment packaging should be in line with national standards to ensure that the equipment is not damaged during transportation, due to improper packaging caused by any damage to the equipment in the process of transportation or loss, the seller is responsible.

5. The equipment shall be delivered to the construction site by the seller, and the seller shall be responsible for transportation and unloading.

6. When the equipment arrives at the site, both parties shall be present and confirm the integrity of the package, and then the buyer shall inspect the goods. The seller shall send someone to the site according to the time arranged by the buyer, count and accept the goods, and sign to confirm. If the goods are found to be inconsistent with the packing list, the seller shall be responsible for making up or taking back the goods. If the seller can't arrive on time, the buyer has the right to open the box for inspection and make a record of the missing pieces and damages, and the seller shall recognize and be responsible for the solution.

7. The seller is responsible for the installation and commissioning of the equipment until the equipment runs normally. Final acceptance after this. If the equipment can not pass the acceptance, the seller shall return the equipment and refund all the amount to the buyer.

8, the seller should be used to install, debugging process required for a variety of tools, instruments and perishable parts.

6, product quality assurance and after-sales service

1, the seller should be strictly in accordance with the relevant national standards and regulations for manufacturing and testing, materials and components are new and unused, and in line with the provisions of this contract. To ensure product quality. The equipment shall be technically inspected and meet the relevant national standards before leaving the factory.

2, the seller is responsible for free of charge for the buyer to train operators and maintenance personnel. Including: basic principles, operation, use and maintenance.

3, the equipment into normal operation, the seller should regularly visit the user.

4, the seller should be clear about the content of after-sales service, response time, scope, mode, charges, and other after-sales service work.

VII. Responsibilities and Obligations

1. During the installation and commissioning of the equipment, if the seller proposes, the buyer shall facilitate the food and drink of the seller's personnel, and the cost of which shall be borne by the seller.

VIII. Liability for breach of contract

1. If the seller fails to deliver the goods on time, except for force majeure factors, the seller shall pay the buyer liquidated damages for delayed delivery, which shall be calculated on the basis of the amount of ______% of the total price of the contract, which is ¥_________ yuan per day.

2, the buyer delayed payment (except for justified refusal to pay). Shall pay to the seller the amount of this delayed payment of the delayed liquidated damages, calculated daily at the amount of this delayed payment of _____% of the amount of the payment processing period of 10 working days.

3. Both parties must strictly implement the relevant provisions of the Chinese People's *** and National Code on liability for breach of contract.

IX. Cancellation and change of the contract

1. When one party to the contract requests to change or cancel the contract, the original contract is still valid until a new agreement is reached. The party requesting the change shall promptly notify the other party, the other party to reply within 15 days of receipt of the notice, and if no reply is given after the deadline, it shall be deemed to have agreed.

2. If the seller requests to change or cancel the contract, the seller shall be responsible for any loss caused.

This contract is in one _________ copy, of which the original _________ and the copy _________ are all of equal legal effect.

Buyer (seal): ___________________ Seller (seal): ___________________

Commissioned representative (signature): _____________ Commissioned representative (signature): _____________

___________ Year _____ Month _____ Day ___________ Year _____ Month _____ Day