What materials do you need for new house decoration? Decoration list and price list.

House decoration is a very huge project, which needs all kinds of decoration materials. For most owners who decorate for the first time, they simply don't know what materials they used and how much they spent. So what materials do you need for new house decoration? What is the material cost? Next, Bian Xiao will share the decoration list and price list of new house materials. Let's have a look.

I. Hydropower

Water pipe: 30-60 yuan/meter.

Electric wire: 20—50 yuan/m.

Weak current installation: 8 yuan/meter, others are concealed with weak current.

High-voltage surface mounting: 25 yuan/meter, others are the same as low-voltage concealed mounting.

Water meter: specification15,20, price 30 yuan/main valve: specification 25, price 30 yuan/valve.

Flushing valve: specification15,20, price 20 yuan/drain pipe: specification below 40, price 12 yuan/meter.

Fluorescent tubes: specifications 20W, 30W, 40W, price 20 yuan/root excluding wiring.

Ceiling grid lamp: specification 40W- 120W, price 40 yuan/set excluding wiring.

Second, the ground.

Floor: 30-70 yuan /m2 at the low end, 80-11m2 at the middle end, and more than 200 at the high end.

Living room tiles: low end 20-80/m2, middle end 80- 150/m2, high end 160-280/m2.

Balcony brick: generally, 20-200 30 yuan is enough, while anticorrosive wood is more expensive, which seems to cost 100-200/ square.

Kitchen and bathroom wall tiles: low grade 10-40 yuan, middle grade 40- 100 Yuan, 100-300 yuan.

Third, the kitchen.

Kitchen cabinets: generally in 2000-8000 yuan, high-end tens of thousands or even hundreds of thousands.

Range hood: Chinese style, around 2000.

Water heater: according to the function, brand, capacity and price, there is a great difference.

Kitchen hardware: including all kinds of blue, pendants, etc. , generally 300-2000 yuan.

Fourth, the bathroom.

Toilet: low-grade 200-600 yuan, middle-grade 700-2000 yuan, high-grade 2000-5000 yuan, good tens of thousands.

Squat tank: low end 100-300 yuan, middle end 300-600 yuan, high end 600- 1000 yuan.

Bathtub (barrel): acrylic skirt 400- 1500 yuan, steel plate or American cast skirt 800-2000 yuan, cast iron 1500-4500 yuan, acrylic skirt 600-2000 yuan, without hardware, 1200-3500 yuan. 3000- 10000 yuan. Barrel 1000-2500 yuan.

Self-made glass or wall semi-partition or shower curtain: the general cost is 200-500.

Wash basin: 500-4000 yuan per set.

Toilet pendant: General 200-800 yuan without mirror.

Faucet: 60—300 yuan/piece.

Sink faucet: 200- 1000 yuan/piece.

Five, wallpaper

Low 10-20 yuan/square, mid-range 20-80 yuan/square, 80-300 yuan/square.

Six, the ceiling

Plastic steel plate: 30—70 yuan/square.

Aluminum gusset plate: 50- 150 yuan/square.

Moisture-proof gypsum board: 35—60 yuan/m2.

Installation fee and internal angle: 300- 1000 yuan.

VII. Categories

Original wooden door: 3000- 10000 yuan/fan

Solid wood door: 1000—2000/ fan

Process door and die pressing door: 450—800 yuan/fan.

Solid wood composite door: 700- 1000 yuan/fan

Glass door cabinet: 600-800 yuan, ordinary plastic steel 200 yuan, aluminum alloy 400 yuan,

Hardware (door lock, hinge, door suction): low-grade 25-50 yuan, medium-grade 60- 150 yuan, high-grade 150-500 yuan.

Eight, wardrobe

Non-solid wood: complete cabinet doors 350-750 yuan/square, customized cabinet doors 450-900 yuan/square.

Solid wood: complete door 400- 1000 yuan/square, customized door 700- 1200 yuan/square.

The above is about what materials are needed for the renovation of new houses, and I hope to help everyone!