Question 2: a complete budget contains what forms According to the requirements of the different it, if the list of general: 3. total price table 4. unit project cost summary table 5. component works list pricing table 6. measures project pricing table 7. other project pricing table 8. sub-parts of the comprehensive unit price analysis table 9. human materials and machinery unit price summary table
If the fixed amount of pricing generally: 3. . lump sum table 4. cost table 5. budget 6. people, materials and machines unit price summary table
Question 3: What is included in the civil engineering budget? The civil engineering budget book includes the following ding
Project name;
construction area;
project cost;
unit cost;
compiler;
date of compilation;
direct project cost, measure cost, overhead charge, enterprise management fee, direct project cost, etc.;
Construction civil engineering budget table;
Construction and installation works volume calculation table;
Material analysis table;
Summary table of main materials and machines;
Calculation table of the area of windows and doors;
Calculation table of the volume of components;
Calculation table of the area of the room and the perimeter of the wall, etc.
The calculation of the cost of direct works, measures, overhead costs, enterprise management, direct works, etc.
The construction budget table.
Question 4: What is the difference between the budget and the quotation Strictly speaking, the budget is the basis of the quotation, because the price in the quotation, that is, how much you can afford, is based on the completion of the project on the basis of the calculation of the various costs required for the work of material and machinery, fees, taxes and other required, that is, your quotation (single) is the price of the purchase and sale of your commitment, but the budget is the tacitly calculated by your heart! Projected price.
The quotation can be lower than the budget, which is called concessions, foolishness or cutting corners, and the quotation can be higher than the budget, congratulations, you are a normal person.
Question 5: What is included in the project budget? In layman's terms:
First, the project budget "process" includes:
1, the calculation of the amount of work.
2, according to the amount of work set quotas.
3, summarize the cost of the project.
Second, the "scope" of the project budget includes:
investment estimates, design estimates, construction budget
Question 6: What is the difference between the tender budget and construction budget 1, the tender budget is based on the bidding documents specified in the bill of quantities or the national unified construction budget quota or local construction budget quota. Local construction budget quota preparation, it is an important basis for bidding units to evaluate the bid, but also after winning the bidding project settlement (income) basis. 2, construction budget I do not know whether you are talking about construction drawings budget or construction budget? Difference of a "map" word, there is a difference between the two. Construction drawings budget is based on the national unified construction drawings budget quota or local construction drawings budget quota prepared as a basis for settlement with the construction unit (income), which is not different from the bidding budget; construction budget is based on the construction of enterprise construction quota (internal cost quota) prepared by the construction enterprise for the control of construction costs, assessment of the performance of the budget. 3, the difference between the bidding budget and the construction budget: the bidding budget is Signing a construction contract, construction contract revenue basis; construction budget is the basis for construction cost control. Bid budget (construction budget) - construction budget = contract gross profit
Question 7: What parts of the construction budget? 1. Cover
The cover of the budget includes:
(1) project name and construction area;
(2) project cost and unit cost;
(3) construction unit and construction unit;
(4) reviewer and compiler;
(5) review time and preparation time.
2. Preparation instructions
Preparation instructions to the reviewer and the completion of the final (final) accounting to provide additional basis. There are the following aspects
(1) the basis for the preparation:
1) the full name of the design drawings of the budget, the design unit;
2) the budget based on the name of the quota;
3) in the calculation based on the name of the other documents and symbols;
4) the main content of the construction program.
(2) changes in the drawings:
1) change in the construction drawings and the name of the part;
2) for some reason to be dealt with the name of the components;
3) because of the relevant drawings involved in the review or the construction site need to explain the relevant issues.
(3) the implementation of the quota of the relevant issues:
1) according to the quota requirements of the budget has been taken into account and not taken into account;
2) due to the lack of quota, the budget to supplement or borrow the quota situation;
3) A and B negotiation of the relevant issues.
3. General budget table (or budget summary table, bidding summary table, etc.)
4. cost calculation table
5. direct cost of the unit work calculation table
6. material price adjustment table
7. work, material, machine analysis table
8. supplementary unit valuation table
9. the number of major equipment materials and Price list
Question 8: What is the project budget is in order to express clearly the amount of money needed for the construction of a project, a series of calculation schedules. If compared to an article, there are themes, general outline, thesis and arguments correspond roughly to: 1, the total cost; 2, the cost of the composition of the categories of the table, such as how much excavation costs, the cost of foundation works, bricklaying costs, how much the cost of windows and doors, how much the cost of the elevator, how much the cost of water and sewage installation, etc., and in addition, there are not such as how much the fees and how much the taxes, etc.; 3, the cost of each category of the composition of the table, such as tens of dollars a party to excavate the earth. For example, tens of dollars a side of excavation, why? Have to have the composition of details: machinery costs, labor costs, transport distance, taxes, fees, etc.; Another example is why an elevator so a cost? There are composition details can be found: the cost of purchasing the elevator, installation labor costs, commissioning costs and so on.
Question 9: What is included in the comprehensive project overview, budget? Project, also known as a single project, is a complete project with independent existence, which consists of a number of unit works of the complex. Engineering project comprehensive estimate, budget is to determine the project (such as production workshop, independent utilities or independent buildings) all construction cost documents. The whole construction project has how many projects, it should be compiled to how many projects of the comprehensive estimate, budget book. Comprehensive project estimates, budgets, including the contents of the construction, installation costs, equipment purchase costs and other costs. The above costs are compiled based on the unit project estimates, budgets and other engineering and cost estimates.
Question 10: What items are included in the project budget comprehensive costs Measures, management fees, various fees and taxes , eg: safety and civilization construction costs, pension insurance 。。。。