What is included in the budget book?

Question 1: What is included in a construction drawing budget book? The contents of the construction drawings budget book? Construction drawings budget book generally includes the following:?1. cover? Mainly fill in: the name of the owner unit, the name of the project, floor area, project structure, number of floors, eaves high, total project cost, one-sided cost, the preparation of the name of the unit, the preparation of the personnel and their seals, reviewers and their seals, the preparation of the unit seal, the date of preparation and so on. 2. Preparation instructions? Preparation instructions are mainly textual description, including: project overview, the basis for the preparation, the scope of the relevant undefined matters, the treatment of legacy matters, the calculation of special items of measures, in the budget form can not be reflected in the problem and other situations that must be described, etc.? The purpose of preparing the preparation instructions is to enable others to better understand the whole picture of the budget and the preparation process to make up for the problem that the figures cannot be shown. 3. Project costing summary table? Project cost calculation summary table, is calculated in accordance with the project cost calculation procedures, including: total comprehensive base price, construction measures (including construction technology measures, construction organization measures), the difference, special costs, profits, taxes, etc., and ultimately constitute the project cost. 4. Construction measures cost itemized table? Construction measures, including construction technology measures and construction organization measures, each of which consists of a number of costs. In the construction measures cost itemized table, should fill in the cost of each item. Construction technology measures include: scaffolding, reinforced concrete in the template, vertical transportation costs, over? height fee, large machinery off-site transportation and installation and dismantling fees and other costs. Contractors can refer to the relevant subheads of the comprehensive base price, and quote independently by combining the project situation, construction program, contractor's technical equipment and other factors. Among them, scaffolding and formwork can also be used for project comprehensive quotation.? The cost of construction organization measures includes: the cost of secondary handling of materials, the increase in the cost of long-distance construction, the increase in the cost of shortening the construction period, the increase in the cost of safe and civilized construction, the management fee of the general contractor, and other costs. The contractor may float the quotation independently with reference to the calculation method stipulated in the document according to the project situation, construction program, market factors, etc., on the premise of ensuring the project quality, reasonable duration and not lower than the cost. ?5. Differential price calculation table? Differentials, including labor cost differentials, material cost differentials, machinery cost differentials and so on. 6. Project budget table? According to the quantity of sub-projects provided in the quantity calculation table, apply the corresponding comprehensive base price and calculate the total comprehensive base price of each sub-project. It also includes the adjustment of quantity difference of materials, calculation of valuation value, etc.? The above six items are the full submission of the unit project budget.? The following information is for the budgeting party's internal filing:?7. Quantity Calculation Sheet? According to the construction drawings, rules for calculating the quantity of work, general description of the comprehensive base price, division description and related information, the quantity and size of each item of work is calculated according to the requirements of the comprehensive base price sub-division. ? 8. Material analysis, summary table? (1) Analyze and summarize the material usage table of comprehensive base price for unit work.? According to the quantity of each sub-project provided in the quantity calculation form and the corresponding subheading content of each major material in the comprehensive base price item list, calculate the comprehensive base price of each sub-project's major material usage respectively, and then carry out the page summary totals, and finally summarize the page totals and fill in the summary table.? (2) unit engineering construction drawings material usage analysis table, summary table.

Question 2: a complete budget contains what forms According to the requirements of the different it, if the list of general: 3. total price table 4. unit project cost summary table 5. component works list pricing table 6. measures project pricing table 7. other project pricing table 8. sub-parts of the comprehensive unit price analysis table 9. human materials and machinery unit price summary table

If the fixed amount of pricing generally: 3. . lump sum table 4. cost table 5. budget 6. people, materials and machines unit price summary table

Question 3: What is included in the civil engineering budget? The civil engineering budget book includes the following ding

Project name;

construction area;

project cost;

unit cost;

compiler;

date of compilation;

direct project cost, measure cost, overhead charge, enterprise management fee, direct project cost, etc.;

Construction civil engineering budget table;

Construction and installation works volume calculation table;

Material analysis table;

Summary table of main materials and machines;

Calculation table of the area of windows and doors;

Calculation table of the volume of components;

Calculation table of the area of the room and the perimeter of the wall, etc.

The calculation of the cost of direct works, measures, overhead costs, enterprise management, direct works, etc.

The construction budget table.

Question 4: What is the difference between the budget and the quotation Strictly speaking, the budget is the basis of the quotation, because the price in the quotation, that is, how much you can afford, is based on the completion of the project on the basis of the calculation of the various costs required for the work of material and machinery, fees, taxes and other required, that is, your quotation (single) is the price of the purchase and sale of your commitment, but the budget is the tacitly calculated by your heart! Projected price.

The quotation can be lower than the budget, which is called concessions, foolishness or cutting corners, and the quotation can be higher than the budget, congratulations, you are a normal person.

Question 5: What is included in the project budget? In layman's terms:

First, the project budget "process" includes:

1, the calculation of the amount of work.

2, according to the amount of work set quotas.

3, summarize the cost of the project.

Second, the "scope" of the project budget includes:

investment estimates, design estimates, construction budget

Question 6: What is the difference between the tender budget and construction budget 1, the tender budget is based on the bidding documents specified in the bill of quantities or the national unified construction budget quota or local construction budget quota. Local construction budget quota preparation, it is an important basis for bidding units to evaluate the bid, but also after winning the bidding project settlement (income) basis. 2, construction budget I do not know whether you are talking about construction drawings budget or construction budget? Difference of a "map" word, there is a difference between the two. Construction drawings budget is based on the national unified construction drawings budget quota or local construction drawings budget quota prepared as a basis for settlement with the construction unit (income), which is not different from the bidding budget; construction budget is based on the construction of enterprise construction quota (internal cost quota) prepared by the construction enterprise for the control of construction costs, assessment of the performance of the budget. 3, the difference between the bidding budget and the construction budget: the bidding budget is Signing a construction contract, construction contract revenue basis; construction budget is the basis for construction cost control. Bid budget (construction budget) - construction budget = contract gross profit

Question 7: What parts of the construction budget? 1. Cover

The cover of the budget includes:

(1) project name and construction area;

(2) project cost and unit cost;

(3) construction unit and construction unit;

(4) reviewer and compiler;

(5) review time and preparation time.

2. Preparation instructions

Preparation instructions to the reviewer and the completion of the final (final) accounting to provide additional basis. There are the following aspects

(1) the basis for the preparation:

1) the full name of the design drawings of the budget, the design unit;

2) the budget based on the name of the quota;

3) in the calculation based on the name of the other documents and symbols;

4) the main content of the construction program.

(2) changes in the drawings:

1) change in the construction drawings and the name of the part;

2) for some reason to be dealt with the name of the components;

3) because of the relevant drawings involved in the review or the construction site need to explain the relevant issues.

(3) the implementation of the quota of the relevant issues:

1) according to the quota requirements of the budget has been taken into account and not taken into account;

2) due to the lack of quota, the budget to supplement or borrow the quota situation;

3) A and B negotiation of the relevant issues.

3. General budget table (or budget summary table, bidding summary table, etc.)

4. cost calculation table

5. direct cost of the unit work calculation table

6. material price adjustment table

7. work, material, machine analysis table

8. supplementary unit valuation table

9. the number of major equipment materials and Price list

Question 8: What is the project budget is in order to express clearly the amount of money needed for the construction of a project, a series of calculation schedules. If compared to an article, there are themes, general outline, thesis and arguments correspond roughly to: 1, the total cost; 2, the cost of the composition of the categories of the table, such as how much excavation costs, the cost of foundation works, bricklaying costs, how much the cost of windows and doors, how much the cost of the elevator, how much the cost of water and sewage installation, etc., and in addition, there are not such as how much the fees and how much the taxes, etc.; 3, the cost of each category of the composition of the table, such as tens of dollars a party to excavate the earth. For example, tens of dollars a side of excavation, why? Have to have the composition of details: machinery costs, labor costs, transport distance, taxes, fees, etc.; Another example is why an elevator so a cost? There are composition details can be found: the cost of purchasing the elevator, installation labor costs, commissioning costs and so on.

Question 9: What is included in the comprehensive project overview, budget? Project, also known as a single project, is a complete project with independent existence, which consists of a number of unit works of the complex.   Engineering project comprehensive estimate, budget is to determine the project (such as production workshop, independent utilities or independent buildings) all construction cost documents. The whole construction project has how many projects, it should be compiled to how many projects of the comprehensive estimate, budget book.   Comprehensive project estimates, budgets, including the contents of the construction, installation costs, equipment purchase costs and other costs.   The above costs are compiled based on the unit project estimates, budgets and other engineering and cost estimates.

Question 10: What items are included in the project budget comprehensive costs Measures, management fees, various fees and taxes , eg: safety and civilization construction costs, pension insurance 。。。。