Wuhu City is located in southeastern Anhui Province, located in the lower reaches of the Yangtze River, the center of the geographic coordinates of 118 degrees and 21 minutes east longitude, latitude 31 degrees and 20 minutes north, relying on the southern Anhui mountain system in the south, and looking north to the Jianghuai Plain. It is adjacent to Hefei City and Maanshan City in the north, bordering Xuancheng City and Chizhou City in the south, connected with Maanshan City and Xuancheng City in the east, and bordering Tongling City in the west. The terrain is high in the south and low in the north, and the terrain is in the shape of an irregular strip; there are various types of landforms, and the plains and hills are all ready, and the rivers and lakes are densely covered.
The eastern and northern part of Wuhu City is an alluvial plain, with depressions and a few hills, and the terrain is low and flat, high in the southwest and low in the northeast. The west and south are mountainous. There are Yangtze River, Qingyi River, Yuxi River, Huadu River, Biantan River, Jingshan River, Huanghu River, Inverted River, Zhang River, Qingshan River and other rivers in the territory. Lakes such as Nantang Lake, Shiban Lake, Xichong Lake, Chi Lake, Zhusi Lake and Longwu Lake. National Highway 205 (Hebei Qinhuangdao Shanhaiguan-Guangdong Shenzhen), National Highway 318 (Shanghai-Tibet Zhangmu), National Highway 329 (Zhejiang Zhoushan-Henan Lushan), National Highway 347 (Jiangsu Nanjing-Qinghai Delingha), National Highway 236 (Anhui Wuhu-Guangdong Shanwei)
Expressways: Wuhai Expressway (G5011), Ningwu Expressway (G4211), Huyu Expressway ( G50), Liwu Expressway (S28), Tongnanxuan Expressway (S32)
Expressway under construction: Wuhuang Expressway (S11), North Yanjiang Expressway (S22) Within the country, there are five high-speed railroads (Wuning, Wutong, Anhui-Gan, Huainan, Xuanhang (connected by Anhui-Gan Line to Xuancheng City), and four high-speed railroads (Ning'an High-speed Railway, Shanghehang High-speed Railway (under construction), Beijing-Fu High-speed Railway, and Anhui-Gan Expansion Railroad (under construction)). connecting, and outwardly accessible to railway stations all over China.
Ningan High-speed Railway: (Wuhu Station) (Eagle River Station) (Fanchang West Station)
Shanghehanghang High-speed Railway: (Wuhu North Station) (Wuhu Station) (Wanjing South Station)
Beijing-Fu High-speed Railway: (Wuhu Station) (Nanling Station)
East Square of Wuhu New Railway Station formally started its operation on Nov. 27, 2014, and after expansion, the Wuhu Station will have 3 station yards, namely, Shanghehang, Ning'an, Puzhou 3 station, ****8 platforms 14 platforms as well as 20 railroad lines converge. At the same time will also be reserved for rail transportation conditions, divided into two squares of the east and west station, waiting room racked above the railroad line, the use of the upper into the lower part of the airport like the lower passenger transportation mode, 2017 Wuhu station west square is completed. By then, the time from Wuhu, Anhui Province to Nanjing, Shanghai, Wuhan and Beijing will be reduced to 40 minutes, 3 hours, 4 hours and 5 hours. Wuhu Port is located in the combination of economically developed areas on the east coast of China and inland areas in the west, is the fifth largest port of water transportation on the Yangtze River, the first largest port of coal energy output and the largest port of freight transportation, foreign trade and container transshipment in Anhui Province, the State Class I port, with an annual throughput capacity of 50 million tons. Existing 55 docks, depot area of more than 600,000 square meters, with more than 200 sets of various types of loading and unloading equipment (sets).
Yuxikou Port is the largest inland coal port in Anhui Province, and in September 2011, the two sections of branch channels of Yuxikou and Taipingfu between Wuhu and Maanshan were upgraded to "national level". Zhujiaqiao Foreign Trade Terminal has an annual throughput of 6 million tons, a container capacity of 100,000 TEU and a ro-ro capacity of 50,000 cars. It is a comprehensive wharf integrating bulk cargo, general cargo, containers, automobile ro-ro and other transshipment transportation.
Wuhu Yangtze River Bridge is one of the landmarks of China in the twentieth century, and is also the leading bridge in terms of scale and technology among the built public-railway bridges on the Yangtze River. Its completion further improves the function of the second corridor in East China, strengthens the regional economic ties of the Yangtze River Economic Belt, and promotes the formation of the economic circle of life in the middle and lower reaches of the Yangtze River. Bus: Wuhu basic 1 yuan ticket system, air-conditioned bus 2 yuan ticket system. All kinds of public transportation IC card can be applied for preferential rides, active military personnel, disabled military personnel, retired cadres, and the old, weak, sick, disabled, pregnant people can be implemented in accordance with the relevant provisions of free rides.
Taxi: daytime 2.5 kilometers within the starting base price of 7 yuan, the starting mileage (2.5 kilometers) after the car kilometer price of 1.8 yuan, nighttime (22:00 pm to 5:00 pm the next day) driving, the starting base price of 2.5 kilometers of 8 yuan, 2.5 kilometers, each kilometer unit price of 2 yuan. If a cab is rented for more than 10 kilometers, 50% of the empty driving fee for the part above 10 kilometers will be added, RMB 2.55/km during the daytime and RMB 2.85/km at night. Free waiting time is 4 minutes, after 4 minutes each minute waiting fee 0.34 yuan, night from 0.38 yuan per minute.
Public **** bicycle: September 22, 2012 "World Car-free Day", Wuhu public **** bicycle rental system began trial operation. According to the plan, Wuhu public **** bike rental system is fully completed, will set up 553 rental stations in Wuhu, *** put 12,000 public **** bike .
Elevated, overpasses: the second ring of Shenshankou Interchange, the new city mouth Ji and elevated, Eshan Road, Chengnan Ma drinking interchanges, Huangshan East Road interchanges, three mountainous areas of the Bijieyuan Interchange, the second ring of the city of northern Wanchun Interchange, the railway station station interchanges have been completed and opened to traffic. Eagle River Road, the second ring fastening Chi Chi Mountain Road Interchange, Nantang Lake Road Interchange, Qianqiao Interchange is under construction. Yangtze River Middle Road elevated, Shanghehang Bridge Wangjiaxiang interchange will soon begin construction. Wuhu Yangtze River Bridge (opened to traffic in September 2000)
Wuhu Yangtze River Highway Bridge No. 2 (under construction, opened to traffic in December 2017)
Wuhu Yangtze River Bridge No. 3 Shang-Hang-Hang Railway Public-Railway Bridge (under construction, opened to traffic in December 2019)
Wuhu Yangtze River Bridge No. 4 Taishan Road Yangtze River Bridge (opened to traffic in 2017)
Beijing-Fu High-speed Railway Tongling Yangtze River Public-Railway Bridge (opened to traffic at the end of 2015)
The first tunnel of the Anhui River: the Dagongshan Road Yangtze River Tunnel (opened in May 2016) The Wuhu rail transit construction lines identified in the program will use cross-seat monorail trains, and the overall layout of the line network will be a grid-radial type, consisting of five urban lines and four city lines. According to urban development and passenger demand, soon to be constructed is the urban line 1 line, line 2 a project, in 2020 before the formation of a total length of 41-50 kilometers of the "ten" skeleton rail line network.
December 18, 2015, the National Development and Reform Commission Director's Office considered and passed the "Wuhu City rail transit construction plan (2016-2020)", marking the city's rail transit construction of new progress in the preliminary work. The next step of the National Development and Reform Commission will be co-signed by the Ministry of Housing and Urban-Rural Development and then submitted to the State Council for approval.
February 2, 2016, the State Council today officially approved the "Wuhu City rail transit construction planning (2016-2020)", so Wuhu completed the last step of the approval to become the 40th city of the national rail transit, construction began in September this year.
Wherein, the rail transit line 1 line from the north of the city Longshan Street Baoshun Road and Heping Road intersection area, to the south successively through Hengshan Road, Fengming Lake Road, Harbor Road, Silver Lake Road, North Zhongshan Road, in the area of the intersection of Huangshan Road and West Beijing Road and the No. 2 rail transit line interchange, and then along the Huangshan Road to JiuHua Road, and finally to the Eagle River Railway Station, and the No. 3 rail transit line interchange, and then along the Ning'an Railway And then along the Ning'an Railway to the end of the Baimashan Vehicle Section (tentative name). The total length of the line is about 30km, with 24 elevated stations, of which the underground line is about 0.8km (underneath the section of Shanghehang Wuhu Yangtze River Bridge), the ground and elevated line is about 29.2km, totaling 4 interchange stations. The project is scheduled to start in 2017 and be completed and open to traffic by the end of 2020.
The first phase of the rail transit line 2 project started in the Wuhu Maritime Bureau area, eastward along Beijing Road, in the area of the intersection of Huangshan Road and Beijing Road, and line 1 interchange, and then along Beijing Road to Eagle River Route Road to the north, and access to the Wuhu Railway Station, and then along the Chichuzhuangshan Road to the east, to the Monxie Road folded to the north, and then finally to the east to the terminus of the Yurwen School area. The total length of the line is about 16km,**** with 12 stations (11 elevated stations, 1 underground station), of which the underground line is about 1.5km (Wuhu Railway Station section), the ground and elevated line is about 14.5km, and there are 3 interchange stations. A phase of the project is expected to plan to start construction in September 2016, and in December 2019 was completed and opened to traffic.