Winter three defense against wind and snow emergency plan

Three winter wind and snow emergency plan (selected 5)

In the weekday study, work and life, it is inevitable to face unforeseen emergencies, in order to make the first time to respond to emergencies, it may be necessary to formulate an emergency plan in advance. Preparation of emergency plans need to pay attention to what problems? The following is my collection of three winter wind and snow emergency plans (selected 5), welcome to read, I hope you can enjoy.

Winter three anti-wind and snow emergency plan 1

1.General

1.1 Preparation purpose

To effectively prevent safety accidents, minimize the harm caused by typhoons and the consequences, and reduce casualties and property losses.

1.2 Preparation basis

Based on the "Xiamen Municipal People's Government's Overall Emergency Response Plan for Public Emergencies***", "Xiamen Construction and Management Bureau system flood and typhoon prevention work plan", "Xiamen City, Xiamen City, the construction quality and safety supervision of flood control and typhoon contingency plan," "production and management units production safety accidents and emergency preparedness guidelines," and other relevant provisions.

1.3 Scope of application

This plan is applicable to the work of typhoon prevention in engineering projects.

1.4 Working Principles

People-oriented, safety first; prevention-oriented, rapid response, decisive disposal.

2. Hazard Analysis

2.1 Basic Project Information

Project Name: xx

Project Address: xx

Overview of the Project Works:

2.2 Main Sub-works and Risk Analysis

Deep Foundation Pit: xx

High Slope:xx

Formwork:xx

External Scaffolding:xx

Construction Crane:xx

Temporary Electricity:xx

Temporary Facilities:xx

3.Emergency Rescue Organizations and Responsibilities

3.1 Project Department Emergency Command Department

The project department set up a leading group for typhoon prevention and emergency response, headed by the project manager, with the project technical manager, safety officer, construction worker, material worker, and each team leader as team members. Emergency command unified command project typhoon emergency disposal work, responsible for the project engineering emergency rescue command work, responsible for the enterprise, the government rescue department request rescue, report rescue situation, responsible for the approval of the plan to start and terminate.

3.2 Each construction team

According to the actual situation of each project, implement the typhoon prevention measures formulated by the project, and obey the deployment and command of the project.

4 Typhoon grading

According to the scope and degree of typhoon impact, typhoon warning level is divided into four levels: Ⅰ (particularly serious), Ⅱ (serious), Ⅲ (more serious), Ⅳ (general). Typhoon development process of its intensity, scope, landfall location, the degree of harm, etc. changes, should be promptly adjusted warning level.

4.1 Preparedness and alert stage

The area where the project is located may be affected by the tropical cyclone within 48 hours.

4.2 Level Ⅳ (general) warning

Within 24 hours, the project area may be affected by a tropical cyclone, with an average wind of up to 6 or more, or gusts of 7 or more; or has been affected by a tropical cyclone, with an average wind of 6 to 7, or gusts of 7 to 8 and may continue.

4.3 Level Ⅲ (heavier) warning

Within 24 hours, the project area may be affected by a tropical cyclone, the average wind can be more than 8, or gusts of more than 9; or has been affected by a tropical cyclone, the average wind of 8 to 9, or gusts of 9 to 10 and may continue.

4.4 Level II (severe) warning

Within 12 hours, the project area may be affected by a tropical cyclone, the average wind can be more than 10, or gusts of 11 or more; or has been affected by a tropical cyclone, the average wind is more than 10, or gusts of 11 or more and may continue.

4.5 Level Ⅰ (particularly severe) warning

Within 12 hours, the project area may be or has been affected by the typhoon, the average wind force of up to 12 or more, or has reached 12 or more and is likely to continue.

5, grading response procedures

5.1 Preparedness and vigilance stage

Pay attention to the collection of the latest typhoon issued by the meteorological department, the reasonable arrangement of the construction schedule, to avoid the continuous operation of the process to be constructed in the period of typhoon impact.

5.2 Level Ⅳ Response Measures

The project department will check the safety of each sub-item according to the Hidden Trouble Inspection Points in Attachment 1, and carry out timely rectification of the hidden safety problems found.

5.3 Level Ⅲ Response Measures

On the basis of Level Ⅳ Response, the project department will reinforce the foundation pit, external scaffolding, construction hoisting machinery, temporary facilities, etc. according to "Points for Anti-Typhoon Measures" in Annex 2.

5.4 Level Ⅱ Response Measures

Stop work at the site at the right time. Prepare emergency materials and emergency food; construction site temporary electricity in addition to lighting, drainage and emergency power, other power supply should be cut off; external scaffolding safety nets according to the main structure of the situation given to the demolition; tower crane according to the surrounding environment to give the lowering of the section or so that the boom is in a state of free rotation, the hook received the highest position.

All the people in the brick building dormitories, near the sea, pits, brick walls and billboards of the building dormitories, in the height of the tower crane as the radius of the ground within the scope of the building facilities are all withdrawn to a safe location.

5.5 Ⅰ response measures

The project into a special emergency wind state, all personnel should stay in the wind safety as far as possible, the project department to be ready at any time to do emergency response to emergencies;

6, the end of the emergency

When the typhoon and the secondary disasters have been effectively controlled, namely Typhoon threat to the construction site has ceased, or the typhoon has turned direction does not land in the project's regional scope, according to the original approval of the authority to start the emergency, the project manager may declare the end of the emergency as appropriate.

The project department repairs the external scaffolding, construction hoisting equipment and temporary facilities that have been damaged. Organizations construction, technology, safety and other personnel on the construction site comprehensive inspection, the construction site in line with the conditions of safe production before resuming work.

7. safeguard measures

7.1 Emergency team security

The project department according to the actual situation of the project department, the formation of including external scaffolding, construction lifting equipment, carpentry, masonry, and other emergency rescue team, regular organization of emergency rescue skills training.

7.2 Emergency materials and equipment security

The project department according to the scale of the project with the appropriate amount of safety and protective equipment, emergency lighting, emergency vehicles, emergency equipment and facilities and emergency drugs. The project designates a person to regularly check the emergency rescue materials and equipment to ensure that they are in a normal state of use.

7.3 Emergency financial security

The project sets up a special fund for the emergency material reserve, post-disaster treatment, post-disaster restoration work funds and subsidies for emergency personnel required for flood and typhoon prevention.

7.4 Disaster shelters

The project department should prepare disaster shelters according to the actual situation of the site, set up signs to ensure that the typhoon is in the dangerous area of the workers to take refuge and resettlement.

8. Training and drills

8.1 Training

The project department regularly trains all employees in emergency response knowledge. When new employees join the company should be for possible accidents emergency knowledge (mainly including emergency procedures, precautions, escape routes, meeting places, etc.) training; project emergency rescue personnel to carry out specialized emergency rescue training (including emergency judgment, emergency rescue techniques, on-site disposal measures, etc.).

8.2 Drill

The project department should organize regular drills to make the emergency personnel clearer about their respective duties and work procedures, improve the ability to work together, and ensure that the emergency rescue work is carried out effectively and quickly. And analyze and evaluate the effect of the drill, and solve the problems exposed in the drill in a timely manner.

Winter three anti-wind and snow emergency plan 2

First, the general principles:

1, the preparation of the purpose

In order to effectively do a good job in defending against the typhoon of the work, the timely disposal of typhoons due to a variety of disasters, to maximize the reduction of my construction site of the loss of all kinds of damage, to maintain the normal construction, to ensure the smooth progress of the project.

2, the scope of application

This plan applies to the construction of this section of the scope of typhoon disaster prevention and emergency response.

3, the principle of work

Typhoon disaster according to the construction area to implement local management, the main disposal of the functional departments and construction teams, and the implementation of the functional departments corresponding to the construction team responsibility system. Each functional department actively support and guide, supervise the corresponding construction team's emergency disposal work. To put the typhoon disaster . Prevention is placed in the prominent link, and all the preventive work is done seriously. Seriously analyze the typhoon may cause gusty winds and rainfall, once the danger occurs, should respond quickly and promptly start this emergency plan, organize personnel and forces to do their best to rescue and relief work.

4, the focus of work

(1) the pit excavation construction site of waterproofing, anti-pit wall collapse and rolling stone, etc.;

(2) construction road landslides, avalanches, and other disasters that may cause accidents prevention;

(3) temporary construction site and construction team stationed at the site of the transfer of personnel and equipment before the disaster comes;

(4) the construction sites

(5) vertical transportation equipment, scaffolding, construction power safety measures;

(6) the construction site and the resident in the period of high winds, heavy rain life security;

(7) typhoon, heavy rain weather forecast, prediction and early warning, in a timely manner, to the construction team, the construction site to release typhoon warning information.

Second, the flood and typhoon disaster leading group:

The project set up a flood and typhoon disaster leading group, the implementation of unified command, sub-departmental corresponds to the specific responsibility of the construction team.

Flood and typhoon disaster leading group

Leading group leader:

Deputy leader:

Members:

Third, the prevention and early warning mechanism:

1, typhoon and other disaster monitoring

By the Ministry of Safety is responsible for the typhoon, torrential rains, storms and mountains. Disaster monitoring and information collection, in advance of the weather conditions, timely summary of the construction site base, traffic roads, a variety of information reported to the leading group.

2, the construction site safety inspection

adhere to the construction site safety inspection, the implementation of wind and flood control measures as the focus of the inspection work, and timely understanding of the relevant information, the possible hazards caused by the basement, the road in advance to arrange for personnel to deal with, to avoid accidents caused by disasters.

3, the construction site of the implementation of the responsibility of the early-warning staff

designate the construction site of the part-time safety officer at the same time for the disaster early-warning staff, is mainly responsible for the collection of information on the construction site dynamics, reporting and the leading group of the release of the instructions of the briefing. Assist the construction team leader to do a good job in the implementation of disaster prevention measures and disaster command work.

4, disaster early warning mechanism

safety group to establish the weather conditions, the construction site conditions of the monitoring system, the implementation of information to obtain measures, adhere to the daily inspection system, during the rainfall, encrypted observation inspections, once found signs of danger, the immediate issuance of an alarm, the transfer of personnel and equipment, and reported to the project leading group.

Four, emergency response:

The project department leading group of the overall command, all members of the participation, and coordination of the relevant departments to participate.

The disaster monitoring department analyzes the development trend of the typhoon according to the weather forecast, releases the rainfall and wind forecast, and puts forward the defense goal to report to the leading group in time. According to the report, the leading group to clarify the defense objectives and priorities, issued the order to transfer people, and announced into the emergency flood control and wind prevention period, start the disaster prevention plan, to the disaster area to send people to guide the work, organize and direct the rescue and relief work, and timely report to the relevant departments of the higher levels of the relevant situation, if necessary, reported to the higher level of coordination of the deployment of medical and living materials assistance.

Fifth, rescue and relief:

After the typhoon landed or seriously affected, the leading group of disaster prevention and relief meeting held in a timely manner, the deployment of rescue and relief work. Organize various personnel to the scene of the disaster, guide the rescue and relief, fully committed to the rescue and relief work.

(1) group leader in time to grasp the summary of the disaster, coordination of rescue and relief work, is responsible for the deployment of disaster prevention materials, and with the relevant personnel to do a good job of disaster prevention and evaluation, and do a good job to the construction command and supervision of the Department of the report.

(2) the members of the team in accordance with their respective responsibilities, the organization of post-disaster recovery of materials, equipment and other supplies, priority arrangements for the construction personnel stationed in the supply of living supplies.

(3) the construction team on the damaged construction site, timely development of repair plans, and organize forces to repair as soon as possible.

(4) The leading group contacted the local health department, organizing forces to actively rescue the sick and injured people, while cooperating with government agencies to do a good job of quarantine and epidemic prevention in the disaster area, to prevent the epidemic.

(5) the construction team to organize forces to repair the damaged roads and communications and other facilities to do a good job after the disaster production self-help work.

(6) logistics personnel to do a good job in the management of materials issued to ensure that the supply of necessities of life.

(7) Contact the insurance department to do a good job of claims.

(8) After the typhoon, each construction team and department should report the disaster damage to the leading group in time. After the disaster, the leading group should summarize the lessons learned from the flood, disaster, and disaster resistance, and submit a written report to the project command and supervision department.

(9) When the typhoon and the occurrence of disasters are effectively controlled, the leading group can be based on the information summarized, announced the end of the emergency.

Six, emergency security:

1, rescue team security

I project within the scope of all construction personnel have the obligation to participate in the typhoon and disaster prevention. Each construction team to lead and safety officer as the backbone, disaster should be organized when all personnel to participate in disaster relief work.

2, material security

Materials and logistics departments should reserve the necessary anti-Taiwan rescue materials for emergency use in case of major disasters.

3, financial security

The office to do a good job in the implementation of rescue and relief funds, when the disaster occurs, according to the instructions of the leadership team, the distribution of funds and distribution work.

4, communication and information security

Communication links to cell phones and hand-held telegraphs, public telephone network failure, timely start the application system of disaster prevention and telegraphs, the use of fixed-channel contact after the notification, to ensure that the information channel is unimpeded.

5, health care security

The leading group contacted the local health department is responsible for the affected area of the health epidemic prevention and medical care, prevention of disease epidemics, immunization and disinfection of public **** place.

6. Evaluation of typhoon prevention and relief work

After each typhoon, the leading group should summarize, analyze, and evaluate qualitatively and quantitatively all aspects and links of typhoon prevention and relief work. Summarize the experience, identify problems, and further improve the work of typhoon prevention and response.

This plan by the project department "flood and typhoon disaster leading group" is responsible for interpretation.

Winter three wind and snow emergency plan 3

Do a good job of construction site typhoon work, social stability and economic development is of great significance. In order to make the windproof work can be carried out in an orderly manner, to ensure that the site emergency response work in a timely, efficient and orderly manner, to minimize the accident disaster, to protect the safety of people and property, and to maintain social stability, according to the "People's Republic of China *** and the State Production Safety Law", "the State Council on the provisions of the accountability for administrative responsibility for large-scale safety accidents" (State Council Decree No. 302), combined with the actual situation of my site. The development of this emergency treatment work plan.

First, the basic principles of emergency response

(a) This plan for my site in the typhoon, the basic procedures and organization of the work of emergency response principles.

(b) This plan applies to the emergency treatment of the site.

(3) this plan in the implementation of emergency response work in the implementation of unified command, each responsible for their own responsibilities, close coordination, prevention-oriented, rescue first, rapid response, local protection, to ensure the principle of safety.

Second, the organization and command structure and the main responsibilities

The establishment of the site of the wind work command group

Leader:

Members:

Main responsibilities:

(a) responsible for the project's implementation of the wind emergency response to the development and modification of the plan;

(ii) Before the typhoon, is responsible for notifying the person in charge of the site to do a good job of windproof work, checking the site safety facilities reinforcement, evacuation, transfer of temporary shed accommodation;

(c) arrange for personnel on duty, inspect the site, if casualties occur, immediately organize rescue rescue and aftercare work; and maintain close contact with the relevant government departments, at any time to report on the emergency treatment of the scene of the accident or request for necessary rescue and care of the situation

Third, the implementation of the plan

(a), when the typhoon is developing, is expected to have the possibility of affecting our region, the weather station issued a typhoon news:

1, issued a notice of the work of the wind, the teams should pay attention to listen to and watch the weather forecasts, and pay close attention to typhoon movements.

2, notify the site teams, requiring them to pay attention to all preparations for typhoon prevention.

(2), when the typhoon is approaching the city, will affect our region within 48 hours, the weather station issued a typhoon warning:

1, the teams should be reasonable arrangements for the construction, to stop must be continuous construction of process operations;

2, do a good job of pre-typhoon safety checks, the inspection content, including whether the well frame is solid, rows of fences and other facilities are solid, including the safety of the temporary work shed. To take measures to reinforce and eliminate potential safety hazards.

3, strengthen the inspection of the site, the problems found during the inspection, hidden danger to issue a rectification notice, order the construction team to immediately rectify and deal with.

(C), when the typhoon is likely to hit our region within 24 hours, there will be a serious impact on our region, the weather station issued an emergency typhoon warning:

1, the site of the typhoon work command team personnel in place, arrange for personnel on duty, inspections of the site.

2, the site to stop construction, the construction workers will be evacuated to a safe area.

3, further check the implementation of the various defense measures, and is in a state of readiness, the implementation of the site rescue teams in place, and is in a state of readiness.

(d), when the typhoon has landed and weakened to low pressure, no longer have an impact on the city, the weather station issued a typhoon warning lifted, the construction team should check the damage. For the safety of site equipment and facilities should be reinforced in a timely manner, and summarize the work of typhoon prevention.

Winter three anti-wind and snow emergency plan 4

In order to do a good job in the face of meteorological disasters in the emergency response, improve our school to deal with meteorological disasters in the emergency response capacity, minimize or avoid losses caused by meteorological disasters, according to the relevant laws and regulations, the development of this plan.

I. Rainstorm

1. Rainstorm signals are released by the weather station, and the school reacts to the rainstorm information broadcast by the district television or radio station.

2. Yellow rainstorm signal emergency work

(1) the General Affairs Office set up to check all buildings, facilities and equipment, and do a good job of shower prevention, anti-submergence of all work. Check and drain the school drainage facilities.

(2) students stop outdoor activities, the Office of Education, classroom teachers to urge students to return to the interior. Students in the classroom are strictly prohibited from clamor, so as not to cause panic, the teacher on duty to the class to check student discipline, attendance.

(3) students should bring rain gear to school or after school, prohibit students riding bicycles with umbrellas.

3. Red rainstorm signal emergency work

(1) continue to do a good job of yellow rainstorm signal emergency work.

(2) Suspend all outdoor activities and operations for all school personnel.

(3) The General Affairs Office organizes the transfer or protection of low-lying and easily flooded materials.

4. Black rainstorm signal emergency work

(1) the General Affairs Office to do a good job of protecting school property, according to the rainy conditions to do a good job of campus flooding work; the Office of the academic staff to do a good job of management of teachers and students; the Office of the teaching announced the suspension of classes and to make the resumption of classes and the adjustment of the curriculum to arrange for the notification.

(2) Teachers and students stay in the classroom and pay close attention to the weather. The classroom teacher will come to the classroom to manage and calm the students and take care of their safety.

(3) When the Black Rainstorm Signal is issued, teachers and students should stay at home or at school and not go out. Teachers and students on campus should not go home until the situation is appropriate.

(4) If students are on their way to and from school, they should immediately find a safe place to avoid the rain, notify their parents by phone to pick them up at home, and call the classroom teacher to fulfill the leave procedures.

(5) The classroom teacher strengthened the management of students' attendance, and contacted the parents of the students who were not in school to clarify their whereabouts.

(6) Each class, each office, each function room of the responsible person to do their own responsibility within the scope of the security protection of people and materials. The school makes an assessment of the damage caused.

5, rainstorm warning lifted, the classroom teachers should immediately report to the General Affairs Office of the personnel and materials, and each office should quickly report to the principal's office of the situation of personnel and materials.

Typhoon

1. Typhoon signals are issued by the weather station, and the school responds based on the rainstorm information broadcast by the TV station.

2. White Attention Signal and Green Warning Signal for Emergency Response

(1) All school departments prepare for the wind.

(2) General Affairs Office to do a good job of checking buildings, facilities and equipment.

3. Yellow warning signal emergency work

(1) The school into the wind state.

(2) Students stop outdoor activities.

(3) All people do not stay or walk under the windy windows.

(4) The General Affairs Office organized the protection of buildings, facilities and equipment.

4. Red emergency alarm signal emergency work

(1) The school entered the emergency wind state.

(2) The General Affairs Office to do a good job of protecting school property, the Registrar's Office announced the closure of classes and made the resumption of classes and course adjustments to arrange the notice.

(3) Teachers and students should stay at home or at school and not go out, and teachers and students in the school should go home only when the situation is appropriate.

(4) If students are on their way to or from school, they should avoid staying under trees, balconies, light box advertisements, or windows, and immediately find a safe place to avoid the wind, notify their parents by phone to pick them up at home, and call their homeroom teachers to fulfill the leave procedures.

(5) has returned to the school students, classroom teachers to class management and appease the students' emotions, take care of the students' safety. For students who are not in school, they should contact their parents to clarify their whereabouts.

(6) each class, each office, each function room of the person responsible for the scope of responsibility to do a good job of the security of the people and materials within the scope of responsibility. The school makes an assessment of the damage caused.

(7) General Affairs Office to organize the protection of buildings, facilities and equipment.

5. Black emergency alarm signal emergency work

(1) continue to do a good job of red emergency alarm signal emergency work.

(2) The General Affairs Office is responsible for cutting off the school's power supply.

(3) Everyone should stay in a safe place to avoid the wind until the alarm is lifted. After the warning is lifted, you should also stay indoors and pay close attention to the weather to prevent the remaining winds from blowing.

6. After the typhoon warning is lifted, all classroom teachers should immediately report the situation of personnel and materials to the General Affairs Office, and all offices should quickly report the situation of personnel and materials to the Principal's Office.

3. Thunderstorms

1.

2. Once there is an omen of a thunderstorm, all personnel should stop outdoor activities and classroom teachers should urge students to return indoors. Students inside the classroom are strictly prohibited from clamoring to avoid causing panic, and the classroom teacher goes to the class to check students' discipline and attendance.

3. During a thunderstorm

(1) students stay in the classroom to study, the class teacher or subject teacher to class management discipline, teachers on duty to strengthen the check.

(2) If students are on their way to and from school, they should immediately find a safe place to avoid the rain, notify their parents by phone to take them home, and call the class teacher to fulfill the leave procedures.

(3) If a student stays at home and it is not appropriate for him/her to go to school, he/she can call the class teacher to request an excused absence.

(4) The classroom teacher should strengthen the management of student attendance and contact the parents of students who are not in school to clarify their whereabouts.

4. The General Affairs Office organizes the protection of buildings, facilities and equipment.

5. After the end of the thunderstorm, the classroom teachers should immediately report to the General Affairs Office on the situation of personnel and materials, and each office should quickly report to the principal's office on the situation of personnel and materials.

Winter three anti-wind and snow emergency plan 5

First, the guiding ideology of the work of typhoon prevention and relief:

Our school typhoon prevention and relief work, under the unified leadership of the Education Bureau of the XX District, to reduce the loss of national property and the lives of teachers and students as the goal, minimize losses, effectively protect the school and teachers and students of the safety of life and property, and to maintain school Normal teaching, life order, in line with the principle of prevention, rescue as a supplement to the work of the typhoon, according to national laws, regulations and related policies, combined with the actual school, the formulation of emergency plans against typhoons.

Second, Establishment of Emergency Working Group:

School typhoon leading group:

Members: all teachers

Third, the focus of flood control:

Flood control

1. Teaching buildings, function rooms, cafeteria, gymnasium and other buildings.

2. Ensure smooth drainage in and around the school.

3. Enhance the transportation of students to and from school during typhoons, storms and thunderstorms.

4. Improve the self-protection ability of teachers and students against sudden weather changes (storms, thunderstorms, lightning, etc.).

Fourth, the preparations before the typhoon:

1. Ideological preparations: through a variety of publicity tools, the use of various forms of publicity, vigorously publicize the knowledge of flood control and disaster relief, education of the majority of teachers and students, fully aware of the significance of the flood control, disaster relief and rescue. Firmly overcome the paralysis, set up a "would rather believe that there is, not to believe that there is no" thinking and "everything is given to stand, not to be abolished" point of view, always be prepared, standby.

2. Organizational readiness: the establishment of a typhoon check responsibility system, clear responsibilities and tasks, do a good job before the typhoon safety checks, the problems found in the inspection, the existence of hidden trouble to put forward processing advice. Attach great importance to the work of typhoon prevention and relief, strengthen the typhoon duty and safety inspection, the implementation of various typhoon prevention measures, to ensure smooth communication, and the establishment of a monitoring mechanism.

3. Preparation for work: to strengthen the various types of flood control, flood control, windproof work inspection, found that the problem is timely and deadline for rectification, attach great importance to the safety of the school during the typhoon, and seriously check all the hidden safety hazards, to ensure the safety of teachers and students' lives and property.

4. Material Preparation: According to the requirements of the possible danger of rescue, prepared in advance rescue materials and equipment for emergency use. Strengthen the key parts of the inspection and supervision of the typhoon, during the typhoon must have enough drainage and repair power, effective prevention of flood emergencies.

V. Typhoon relief emergency response:

1. The school received the release of the higher level of government to make emergency preparations for the typhoon, or according to the typhoon situation is about to occur, immediately start the school typhoon relief system, the arrangement of the work of the disaster prevention, the full state of emergency do all the emergency work.

2. According to the actual situation of the school typhoon prevention and relief, the organization and implementation of emergency response work plan, in accordance with the typhoon prevention and relief agencies set up to carry out the school typhoon prevention and relief work, and rescue rescue operations.

3. Throughout the time of the typhoon, the principal of each campus will arrange for team members to take turns on duty at school, and the duty officer and the duty leader should be in place in a timely manner. The duty officer should constantly patrol the campus, and immediately report to the principal of each campus and the relevant leaders if he finds any dangerous situation.

4. Strengthen the duty patrol, in case of heavy rain, long rain must pay close attention to the surrounding areas of the school, once found dangerous, timely start the relevant emergency plan, do a good job in the evacuation of teachers and students.

5. Strengthen the students during the typhoon, school traffic guidance. Ensure that the school and the surrounding drainage smooth.

6. If the buildings are found to be in danger, immediately close and stop using them, and promptly transfer teachers and students to a safe place to live, to ensure the safety of teachers and students.

7. In the conspicuous place to post safety warnings to enhance the awareness of teachers and students of the safety hazards.

8. Prepare classrooms for accommodating disaster victims in the surrounding areas.

9. If there are injuries, property damage or serious accidents, the school will report them to the XX District Education Bureau and the higher authorities.

10. Call the police for help 110. fire 119. medical care 120. traffic accidents 122.

;