Coal mine must have "six long", seek explanation ~ there is any regulation, documents say more than how much size must be configured "six long" not?

Please see the standard source of the so-called six long, and the editor's note attached to it.

Shanxi Province coal mine construction standards (Jin coal office base hair [2012] No. 505)

Chapter II basic conditions of coal mine construction

Section I of the enterprise access conditions for the opening of coal mines

Article XIV of the coal mining enterprise employees in accordance with state regulations to implement the occupational access system. Mainly includes: coal mine "six chiefs" (mine manager and safety, production, electromechanical, chief engineer or technical deputy mine manager, ventilation assistant), deputy chief engineer, the head of the safety management department, as well as engaged in the construction of mines, mining, electromechanical, transportation, ventilation, monitoring, water control and geological surveying and pyrotechnic products use of the management of various other types of personnel and other professions. Must be trained by the relevant departments, examined and qualified, and hold the relevant documents before taking up their duties.

Article 15 Coal mining enterprises shall have various types of engineers and technicians appropriate to their production scale. The number of management and technical personnel with college and above professional qualifications in the subject of coal shall not be less than the following minimum standards:

If the scale of the coal mine reaches 10.00 Mt/a and above, not less than 150 people, if the scale of the coal mine reaches 3.00Mt/a and above, not less than 120 people, if the scale of the coal mine reaches 1.20 Mt/a and above, not less than 100 people, if the scale of the coal mine 1.20 Mt/a and below, not less than 50 persons, of which 30% shall have middle and senior professional and technical titles.

Article 16 of the coal mine "six" and deputy chief engineer, must have a college degree or above in coal mine safety production-related professions (of which, 0.30 Mt/a of coal mines, with secondary school or above), engaged in coal mine safety production-related work for more than 3 years of experience; mine manager (manager) must also have safety production technology, management positions for more than 2 years of work experience. The person in charge of the coal mine safety production management organization must have coal mine safety production related professional secondary school education and above and engaged in coal mine safety production related work for more than 2 years of experience.

All types of coal mine director, deputy director, chief engineer, ventilation assistant in accordance with the affiliation in the municipal coal administrative department above the registration, and in the provincial coal department for the record, the same person shall not serve in two or more coal mines.

Article XVII of the coal mine enterprises shall, according to the actual production and safety requirements, equipped with sufficient, qualified by the law and obtain "coal mine special operations license" of the safety officer, gas inspector, full-time gunnery operator, underground electric clamping, explosion-proof electrical equipment inspectors, large equipment drivers, gas extraction, safety monitoring and control, anti-surge, water discharge and other special operators.

Article XVIII of the coal mine enterprises to actively implement the change of recruitment for enrollment, and constantly improve the number of newly recruited employees in the direct enrollment ratio, to the end of the "12th Five-Year Plan" all the implementation of the change of recruitment for enrollment to comprehensively improve the quality of employees.

Article 19 of the coal mine enterprises in accordance with the provisions of the establishment of staff training institutions, with full-time training personnel, to strengthen the daily production safety knowledge training for all employees, especially to do a good job of "three major regulations" to learn to do a good job of production safety techniques, technology, equipment application training, do a good job in the identification and prevention of disasters, emergency and self-help knowledge and skills. Self-rescue and mutual rescue knowledge and skills training, without training or training unqualified employees shall not be on duty.

Old Coal Mining Editor's Note:

The term "six long" originated in Shanxi coal mines.

This is a new invention in the large-scale merger and reorganization of Shanxi coal mines in the past three years, equipped with a full six long is a condition of access to the coal mine.

Other coal mines in the country are generally involved in the production of safety for the five mine director deputy director of personnel, that is, Henan, the so-called five mine director, that is, the mine director, chief engineer, production deputy director, deputy director of safety, mechanical and electrical deputy director.

Shanxi in the first few years of frequent mining accidents, the size of the librarians are y implicated, although greatly enriched a bit, but some librarians are also due to run the mine coal bosses big bribes and fell out of the hat and even into the classroom.

The Wang County Wang Daotai originated from the same coal gas staff, have done ventilation district captain, presided over the Shanxi Province, after the work of floating, because the ventilation safety is indeed the top priority of the coal mines, coupled with the origins of the coal mines, ventilation preference, so it is coupled with a long that is the so-called ventilation assistant mine director (generally is the part-time captain of the ventilation district), through the legal process to be implemented in the province.

Wang Daotai's move allowed ventilation district captains to take advantage of the yellow robe, forced into the class or vice president level of the quasi-class, giving them increased income. Many ventilators are still grateful to Wang Daotai!

The place called Shangpang, a few years ago, there is a jataka county magistrate into the Shangpang, and then a new creation and promotion, transformed into seven long, plus a safety production command center (in fact, it is the scheduling room) for the Shangpang County essential conditions. Jatang county guard engaged in the fancy new, and let the Shangdang County out of the color again!

Six long, seven long surface is a change of position, screw a very exciting, in fact, but is just the system inside the fried rice. When the right person arbitrarily pat on the head of a thing, so that a lot of coal people from then on the stage, increase income, shameful face into the vice president of the post above. Woohoo, in a word, unknown.

A small report in May 2012:

As the coal resource integration work in Shanxi Province wraps up, more than 1,000 coal mines are in urgent need of unified standards to regulate management. Recently, Shanxi Province, the coal industry quite introduced "Shanxi Province, coal mine modernization mine standards", "Shanxi Province, coal mine mining enterprise standards", "Shanxi Province, coal mine management standards", "Shanxi Province, coal mine construction construction management standards", "Shanxi Province, coal mine construction standards" and other five standards, to further improve the province's coal mine construction and management level, and to promote the coal industry towards "seven high and one civilization "The new standards will be implemented from the date of issuance. The new standards have been implemented since the date of issuance.

"Shanxi Coal Mine Modernization Mine Standards" applies to the construction, production scale in 1.5 million tons / year and above the well mine, the standard requires existing production mines in accordance with the standard optimization and rectification, the end of 2015 the province's 1.5 million tons / year and above the modernization of the mine mine to reach the standard rate of 80% or more; in the construction of mines completed and put into operation in three years to meet all the modernization of the mine standard.

"Shanxi Province, coal mine mining enterprise standards" to adapt to the merger and reorganization and integration of coal mining enterprises, mining enterprises to innovate management mode, to promote the main enterprise to be stronger, to achieve the standardization of coal mining enterprises, institutionalization, order of the operation of the requirements of the establishment of the mining enterprise level standards, improve the level of mining; the establishment of the mining enterprise annual review system, the implementation of dynamic management.

"Shanxi Province coal mine management standards" is divided into general provisions, resource protection, production and construction of ten chapters ***51 rules, aimed at promoting the province's coal industry towards high standards, high technology, high management, high-end, high requirements, high quality, high efficiency, modern civilization, "seven high and one civilization" development mode, to achieve intensive, efficient, ecologically harmonious, scientific and safe. The new mode of development is "seven highs and one civilization", which realizes intensive, high efficiency, ecological harmony, and scientific safety.

The Shanxi Coal Mine Construction Management Standard strengthens the management of bidding, record management, construction project management, labor management, construction unit safety management, departmental supervision and management, and other six aspects of the 33 standards, to strengthen the province's coal mine construction team, construction projects, construction safety management, and to promote the implementation of safe and standardized coal mine construction projects, and to ensure that the quality of the construction of modernized mines in our province. and level. Shanxi Province coal mine construction standards require from the coal mine construction basic conditions, coal mine design standards, open-pit coal mine design standards, coal mine construction management standards, enterprise culture construction, coal mine construction project quality and completion and acceptance, comprehensively enhance the level of coal mine construction, a high starting point for the design, high-quality construction, high standards of acceptance, the construction of modernized mines with first-class equipment, advanced technology, reliable systems, safety and efficiency.

Shanxi Provincial Coal Mine Construction Standards

Chapter 1 General Principles

Article 1 In order to implement the scientific outlook on development and the national development of the coal industry, laws, regulations and guidelines, policies, norms and standards, and to adapt to the need to improve the socialist market economic system, to consolidate the results of the merger and reorganization of coal mines in the province and the consolidation of resources, and to build a modernized mine with "seven highs and one civilization", it is necessary to establish the following standards for the construction of coal mines in the province High a civilization" of modern coal mines, the formulation of this standard.

Article 2 This standard is for the coal mine construction project decision-making services and reasonable control of the level of mine construction and the preparation of the province's unified standards, is the preparation, assessment and review of mine project proposal, project application report, capital application report, preliminary design and construction drawings and design basis, but also to supervise and inspect the construction process standards.

Article 3 This standard applies to the coal industry in Shanxi Province, the new construction, alteration and expansion of mine construction projects, production mine technology transformation, industrial upgrading, etc. can refer to the implementation.

Article 4 The construction of coal mines should be based on the approved geological report on well exploration to prepare feasibility study reports, preliminary design and construction drawings. Preliminary design must be in accordance with the hierarchy of management authority, the competent department of the coal industry for approval. Preliminary design must be carefully analyzed and studied before the geological data, the degree of exploration, resource reliability, mining conditions and economic value to make an evaluation.

Article 5 The construction of coal mines should be in line with the national coal industry policy, coal industry development planning and coal development policy of Shanxi Province; and should be coordinated with related industries, ecological environment and regional economic development.

Article 6 The design and construction of coal mines shall be in accordance with the requirements of scientific and technological progress, and take the road of sustainable development of the coal industry with high utilization of resources, guaranteed safety, good economic benefits and less environmental pollution.

Article 7 The design and construction of coal mines shall implement the "safety first, prevention first, comprehensive management" approach to production safety, and establish and improve the production system.

Article 8 The construction of coal mines should be in accordance with the "scale, intensification, mechanization, modernization" principle, adhere to the scientific design, high-quality construction, high standards of acceptance, with advanced equipment, technology, technology to equip mines, the construction of modern mines. Full implementation of high standards, high technology, high management, high-end, high requirements, high quality, high efficiency and modern civilization of the new mode of development.

Article IX design and construction of coal mines should adhere to the safety, environmental protection, health and other engineering and facilities and the implementation of the main project of the mine, "while designing, while construction, while put into use" system.

Article 10 of the open-pit coal mine engineering design, should implement the principle of sustainable development, safety and efficiency as the goal, the use of modern technology and equipment, the implementation of information management, the implementation of centralized production, reduce the environmental burden of the policy. Maintain a balance between mining and re pleading, dealing with the near and distant future, the relationship between the construction of the near future as the main body.

Article 11 of the open-pit coal mine engineering design, must implement the comprehensive utilization of the policy, the effective use of resources and protection of resources. Its *** raw, associated mineral resources should be recycled or protected.

Article XII of the open-pit coal mine project design, environmental protection projects, soil and water conservation projects and land reclamation projects, must be done with the main project, "the same time the design, construction, and put into use at the same time.

Article 13 The design and construction of coal mines should be in line with this standard, in addition to the current national regulations, norms, standards, indicators and quotas.

Chapter 2: Basic Conditions for Coal Mine Construction

Section 1: Conditions for Enterprises to Open Coal Mines

Article 14: Employees of coal mining enterprises in accordance with state regulations to implement the occupational access system. Mainly includes: coal mine "six chiefs" (mine manager and safety, production, electromechanical, chief engineer or technical deputy mine manager, ventilation assistant), deputy chief engineer, the head of the safety management department, as well as engaged in the construction of mines, mining, electromechanical, transportation, ventilation, monitoring, water control and geological surveying and pyrotechnic products use of management of various other types of personnel and other professions. Must be trained by the relevant departments, examined and qualified, and hold the relevant documents before taking up their duties.

Article 15 Coal mining enterprises shall have various types of engineers and technicians appropriate to their production scale. The number of management and technical personnel with college and above professional qualifications in the subject of coal shall not be less than the following minimum standards:

If the scale of the coal mine reaches 10.00 Mt/a and above, not less than 150 people, if the scale of the coal mine reaches 3.00Mt/a and above, not less than 120 people, if the scale of the coal mine reaches 1.20 Mt/a and above, not less than 100 people, if the scale of the coal mine 1.20 Mt/a and below, not less than 50 people, of which 30% shall have middle and senior professional and technical titles.

Article 16 of the coal mine "six" and deputy chief engineer, must have coal mine safety production related college education and above (of which, 0.30 Mt / a coal mine, with secondary school education and above), engaged in coal mine safety production related work for more than 3 years of experience; mine manager (manager) must also have a safe production of technical, management positions for more than 2 years of experience. technology, management positions for more than 2 years of work experience. The person in charge of the coal mine safety production management organization must have coal mine safety production related professional secondary school education and above and engaged in coal mine safety production related work for more than 2 years of experience.

All types of coal mine director, deputy director, chief engineer, ventilation assistant in accordance with the relationship between the municipal coal administrative department, and in the provincial coal department for the record, the same person shall not serve in two or more coal mines.

Article 17 The coal mine enterprises shall, according to the actual production and safety requirements, equipped with sufficient, qualified by law training and obtain "coal mine special operations license" of the safety officer, gas inspector, full-time gunnery operator, underground electric clamping, explosion-proof inspection of electrical equipment, large-scale equipment drivers, gas extraction, safety monitoring and control, anti-surge, water discharge and other special operators.

Article 18 of the coal mine enterprises to actively implement the change of recruitment for enrollment, and constantly improve the number of newly recruited employees in the direct enrollment ratio, to the end of the "12th Five-Year Plan" to implement the change of enrollment for enrollment, and comprehensively improve the quality of employees.

Article 19 of the coal mine enterprises in accordance with the provisions of the establishment of staff training institutions, with full-time training staff, to strengthen the daily production safety knowledge training for all employees, in particular, to do a good job of the "three regulations" to learn, to do a good job of production safety techniques, technology, equipment application training, do a good job in the identification and prevention of disasters, emergency evacuation and self-rescue knowledge and skills. Self-rescue and mutual rescue and other knowledge and skills training, without training or training unqualified employees shall not be on duty.

Article 20 The registered capital of the main enterprises in the coal mine shall at least reach the minimum limit prescribed by the current laws and regulations; the ratio of monetary contributions and paid-in capital in the registered capital of the company shall be in accordance with the provisions of laws and regulations, and the state for the coal industry characteristics of the newly issued regulations have higher requirements from the provisions of the provisions thereof.

Article 21 The initial capital contributed by the main enterprise shall be paid in full within the prescribed time limit in accordance with the national standards, and it has sufficient ability to pay the remaining capital contribution within the prescribed time limit. The main coal mine enterprises in the application for the coal mine, to provide proof of capital in place and the source of funds for project investment and financing, to ensure that the coal mine project construction funds to implement.

Article 22 The main enterprise that intends to start a large-scale coal mine shall have at least 10 years of experience in starting or managing medium-sized and above coal mines, and shall start a non-coal enterprise of a considerable scale in the locality.

Section II Technical Conditions for Starting Coal Mines

Article 23 The design capacity of newly built mines shall be no less than 1.20Mt/a, that of newly built open-pit mines shall be no less than 3.0Mt/a, that of altered and expanded shaft coal mines shall be no less than 0.90Mt/a, and that of integrated shaft coal mines shall be no less than 0.60Mt/a.

Article 24 In principle, all coal mines shall realize integrated Mechanized wall mining (other mining methods can be used in special circumstances), information management, and comprehensively enhance the level of modernization. Actively promote the unattended working face; when conditions permit, the main ventilation fan room of the mine, the main underground drainage pump room to achieve online monitoring, unattended.

Article 25 Coal mines can only build a set of main production system, coal mines should be in accordance with the "one mine, one well, one side" mode of construction. Meet the following conditions, can build "one well, two sides":

(a) the design capacity of 0.90Mt / a and above, the coal mine must meet one of the following conditions:

1. belong to the thin, thick coal seam mining or high, low sulfur (ash) coal seam mining.

2. belonging to the thin coal seam mining.

3. belonging to the emancipated coal seam mining.

4. belonging to the sharp inclined coal seam mining.

(ii) Coal mines with a design capacity of 3.0 Mt/a and above.

Article 26 The coal mine must establish a perfect monitoring and control system, personnel positioning system, emergency evacuation system, pressure wind self-rescue system, water supply rescue system and communication system, referred to as the "six systems", and to achieve the "system is reliable, perfect facilities. "The six systems must be designed, constructed and put into use at the same time as the mine construction to realize the "three simultaneous".

Article 27 All construction of coal mines must meet the requirements of the preliminary design and relevant national and provincial regulations at the time of completion and acceptance.

Section III: Resource conditions for opening coal mines

Article 28: New coal mining enterprises must obtain a mining license.

Article 29 The construction of coal mines should have an approved well field (mine field) exploration and geological report. Well field (mine field) area is large, the whole well field (mine field) to reach the level of exploration is difficult, the first mining lot must reach the level of exploration, and the service life of not less than 10 years.

Article 30 The scope of coal resources/reserves estimation should be harmonized with the boundary of the well field. The depth of coal resources/reserves estimation is generally 1000m, and the maximum is not more than 1200m.

Article 31 The primary and secondary protection areas of surface water sources of drinking water, key protection areas of springs, nature reserves (core area and buffer area), highways, scenic spots above provincial level, forest parks, geoparks, World Heritage Sites, national key cultural relics protection units, geological hazards, and historical and cultural protection sites. , historical and cultural preservation sites, geological disaster risk areas, urban planning areas, the ecological environment can not be restored to the use of the area, the destructive impact of mining is strictly prohibited.

Article 32 The mining of coal seams with sulfur content greater than 3% (except for raw coal for chemical raw materials) is prohibited.

Article 33 of the national railroad lines, highways within 2km on both sides of the ban on open-pit mining.

Article 34 The newly opened coal mines should be approved by the gas outflow prediction report, there is a threat of coal (rock) and gas (carbon dioxide) protrusion of mines should be approved by the coal (rock) and gas (carbon dioxide) protrusion appraisal report, high gas mines, coal (rock) and gas (carbon dioxide) protrusion of gas mines should be approved by the design of the extraction.

Article 35 The actual construction of coal mines found in the field (mine field) geological conditions, coal quality information such as the scope of the air space with the original approval of the field (mine field) geological report has a large change, shall be entrusted to a qualified unit to supplement the exploration, and its report shall be approved by the original approval department.

Section IV: External Conditions for Starting a Coal Mine

Article 36 The construction of a coal mine shall be equipped with transportation conditions for external transportation. Reasonable modes of external transportation shall be determined in accordance with the capacity and distance requirements of the mine and the conditions of existing, newly built or designed (planned) railroads, highways and other transportation channels in the area where the mine is located, and shall be connected with the local and national transportation networks.

Article 37 The construction of coal mines should have the production and living needs of water resources conditions, and with the local water resources management department to reach an agreement on water withdrawal; encourage the priority use of urban water supply facilities.

Article 38 The construction of coal mines should economize on land use, occupy less arable land, and obtain the relevant procedures for land use.

Article 39 The construction of coal mines should have reliable communication conditions. Mine communications should utilize the existing communication resources in the mining area; independent coal mines or coal mines with inconvenient communication network, can also be used in the region's communication resources.

Article 40 The construction of coal mines shall have a reliable power supply, and power supply agreement with the power supply department.

Chapter 3: Coal Mine Design Standards (Shaft Construction)

Section 1: Requirements for Coal Mine Design

Article 41: The design of a coal mine shall be prepared by a design organization that has the appropriate qualifications.

Article 42 The approval (approval) documents of project approval (approval) by the relevant competent authorities at the provincial level and above have been obtained.

Article 43 has obtained the approval documents of the administrative department of land and resources to delineate the scope of the well field or the mining license issued.

Article 44 has obtained the relevant competent authorities to assess the record (approval) of the wellfield exploration geology report.

Article 45 The mines with high gas and the risk of coal and gas protrusion have obtained the approval documents of "Preliminary Design of Gas Drainage" approved by the relevant competent department of the industry.

Article 46 has obtained the approval documents or agreements on land, water supply and power supply necessary for the construction of the mine.

Article 47 Other information specified by the provincial and above industry administrative departments.

Section 2: Principles of determining the scale of mine construction and its classification

Article 48 The scale of mine construction shall be in line with the national industrial policy, the development plan of the coal industry and the overall planning of the mining area, as well as with the relevant policies and plans formulated by Shanxi Province.

Article 49 The scale of mine construction shall be divided into two types: large and medium:

(1) Large mines are: 1.2, 1.5, 1.8, 2.4, 3.0, 4.0, 5.0, 6.0, 8.0, 10.0, 12.0, 15.0Mt/a and above.

(2) Medium-sized mines are: 0.60, 0.90Mt/a.

Article 50 The scale of construction of mines shall be determined according to the geological structure, resources/reserves, technical conditions of mining, production capacity of coal seams and working faces, technical equipment, external construction conditions, market demand, economic benefits and other factors. And shall comply with the following provisions:

(a) The sequence of coal seam mining shall meet the requirements of safe production, in principle, the top-down downward mining.

(b) A mining level to ensure the production capacity of the mine.

(c) In accordance with the principle of safety and efficiency, the mine should be organized in accordance with the "one well, one side" production. A working face to determine the production capacity of the mine; design capacity of 0.60Mt / a and below, the mine must strictly implement the "one well one side".

(d) The design capacity of 3.0 Mt / a and above, in principle, can be arranged "one well two sides".

(5) For mines with the risk of coal and gas protrusion, the design capacity shall be 0.45 Mt/a and above, but shall not be higher than 5.0 Mt/a.

(6) The design capacity of high gas mines shall not be higher than 8.0 Mt/a.

(7) The design capacity of gas mines shall not be higher than 15.0 Mt/a.

Section III. >Section III Service Life of Mines

Article 51 The service life of newly constructed mines and their first level shall not be less than the provisions of Table 2-1.

Article 53 The service life of an altered mine shall not be less than 50% of the service life of a newly constructed mine of the same type.

In principle, mines with a service life of less than 5.0 years (excluding 5.0 years) shall not be subject to reconstruction or expansion.

Article 54 When calculating the design service life of the mine and the first mining level, an appropriate reserve reserve reserve factor shall be determined according to the geological conditions and the degree of investigation. The reserve reserve reserve coefficient shall be 1.3-1.5, with a larger value for complex geological conditions and lower degree of exploration, and a smaller value for the opposite.

Section IV: General Provisions on Project Composition

Article 55: A mine project shall be composed of the main production system, auxiliary production system, comprehensive development and utilization of resources, safety and hygiene, environmental protection, administration, management and living services, and other works and facilities.

Article 56 The specific composition of engineering projects shall be determined in accordance with the principles of specialized collaboration and socialized services.

Section V Composition of Projects

Article 57 The production system shall include: shafts, underground yards and chambers, main transportation lanes and return airways, mining areas, mining faces, hoisting, ventilation, underground drainage, air pressure, coal sorting and processing, surface storage, loading and transportation, and other works and facilities.

Article 58 The auxiliary production system shall include the following works and facilities: power supply and distribution, water supply and drainage, heat supply, communication, light house, metering and coal sampling and testing, mechanic repair, equipment supply, ground transportation, monitoring, control and computer management.

Article 59: Comprehensive development and utilization of resources, safety and health, environmental protection projects and facilities shall include: *** associated mineral resources development and utilization, mine water and domestic sewage treatment and utilization, coal slurry, coal gangue and residual heat, geothermal heat utilization, mine safety, occupational hygiene, firefighting, rescue, soil and water conservation, ecological protection and environmental management, energy saving and emission reduction projects and facilities.

Coal (rock) and gas (carbon dioxide) prominent mines, high-gas mines must be established to extract gas system, the extracted gas should be utilized comprehensively, there is heat damage to the mines must be established to control the heat engineering.

Article 60 administrative and living service facilities include: mine office buildings, district office buildings, light houses, bathrooms, canteens, medical facilities, staff apartments, staff education, staff cultural and sports activities and other facilities.

Section 6: Principles of selecting the location of wellheads and industrial sites

Article 61: The general layout of the industrial sites of coal mines shall have recently measured topographic maps and engineering geological, hydrological and meteorological data. The scale of the topographic map shall be determined according to the topographic conditions, scale of the enterprise and the nature of the project. 1:1000 or 1:2000 can be used in the feasibility study stage, and 1:500 or 1:1000 is suitable to be used in the stage of preliminary design and construction drawings design.

Article 62: The selection of the location of the head of lifting shaft shall be conducive to the whole well field development and industrial site layout, and according to the conditions of the well upstream and downstream construction, and to conduct a Technology, economic comprehensive demonstration, in order to invest less, put into production early, good benefits, and conducive to safety as the principle.

The main and auxiliary hoisting shafts should be located in the same industrial site, and under special conditions, they can also be located in two separate sites.

Article 63 of the wind well well location should be selected to meet the ventilation safety requirements; can be arranged with the lifting well in the same industrial site, in order to shorten the construction period and save land.

Article 64: When there are reasonable technical reasons and conditions, the industrial site and the site of the wind well can be arranged outside the scope of the well field, and if there is any pressurized occupation of resources, an agreement on mutual guarantee shall be signed, but the entrance of the well shall be located within the scope of the well field.

Article 65 The location of industrial sites of coal mines shall not be chosen in the areas of environmentally sensitive targets that need to be protected and around the protection zones of military facilities.

Section VII: Engineering Geological Conditions of Well Shafts and Industrial Sites

Article 66 The location of well shafts shall avoid as far as possible thick topsoil layers, thick aquifers, fault fracture zones, coal (rock) and gas (carbon dioxide) protruding coal seams or weak rock seams, and shall not pass through air-mining zones and undesirable geological structure zones in principle. If it is really necessary to go through the hollowing area due to the condition limitation, measures should be taken to deal with the hollowing area first, and safety measures should be formulated to ensure the safety during the construction and production operation of the wellbore.

Article 67 The industrial sites shall have good engineering geological conditions, avoiding underground mining areas, ground subsidence areas, ground cracks, and other sites with poor geological environments, and shall not be affected by mudslides, avalanches, landslides, karsts and earth cave-ins, and other undesirable factors.

Article 68 The industrial sites in the seismic-resistant defense zone shall be selected to be favorable to the seismic-resistant section, avoiding the unfavorable section, and shall not be selected in the dangerous section.

Section VIII: Exploitation Arrangement

Article 69: Exploitation of mines shall be based on factors such as topography, geological conditions, conditions of coal seams, mining technology, equipment, external construction conditions, ecological environment, design production capacity, and economic benefits, etc., and the use of flat, inclined and vertical shafts, or a comprehensive method of exploitation shall be determined by comparing the programs.

Large mines with a large field area, rich reserves or high gas content shall adopt the zoned development, zoned ventilation and centralized coal discharge zoned development method if the conditions are suitable.

Article 70 The number of shafts shall be determined after comprehensive argumentation based on the deployment of mine development, hoisting, ventilation, safety needs and investment efficiency. Each mine must have at least 2 shafts, the mine must set up a dedicated return air shaft, and must be used as the mine's safety exit, do not allow multiple shafts in parallel return air; the use of centralized ventilation system for the construction of the mine, when a wing of the well field towards the longer, the well field must be set up near the boundary of the safety exit. The part-time function of the shaft must comply with the relevant provisions of the current Coal Mine Safety Regulations.

Seventy-one mining levels shall be divided according to the conditions of coal seam endowment, geological conditions, the level of mining technology and equipment, resources/reserves and production capacity and other factors, determined by a comprehensive comparison, and shall be in accordance with the following provisions:

(1) When the mine is divided into stages of mining, the vertical height of the stage is appropriate to be:

1. 200-350m for gently inclined and inclined coal seams. 350m.

2. 100-250m for sharply inclined coal seams.

(2) When the conditions are suitable for gently inclined coal seams, the gas content is low, and the amount of water influx is not large, it is appropriate to use a combination of uphill and downhill mining.

(3) near-level multi-seam mining, when the seam spacing is not large, it is appropriate to use a single level of development; when the seam spacing is large, can be divided into coal groups (seams) multi-level mining.

Article 72 When the slope length of the upper (lower) mountain is too long in part of the area due to the different outcrops of the coal seams or large changes in the inclination angle of the coal seams, an auxiliary level can be set up at an appropriate position in the area.

Article 73 The layout of mining roadways shall be determined according to the conditions of coal seams, geological conditions, mining technology conditions and factors such as mine development, ventilation and transportation methods, and shall conform to the following provisions:

(1) When mining close multiple coal seams, it is appropriate to adopt centralized or grouped transportation roadway layout; when the coal seams (groups) are widely spaced, it is appropriate to adopt stratified transportation roadway layout.

(2) mining coal seam roadway shall not be arranged in the coal (rock) and gas (carbon dioxide) protruding coal seams and serious impact ground pressure coal seams.

(3) when the coal seam without coal (rock) and gas (carbon dioxide) protrusion danger, no impact ground pressure, the coal seam top and bottom plate surrounding rock is more stable, the coal seam is hard, the water content is small, or spontaneous combustion and fire, high-gas coal seam to take safety measures in the technically feasible and economically reasonable, the main transport alleys and the total return air lane should be arranged in the coal seam.

Four, near the level of multi-seam mining, the use of layered or grouped arrangement of transportation alleys, it is appropriate to mining level layered (group) transportation alleys overlap arrangement.

Fifth, the development of roadway layout should avoid stress concentration areas and active faults, and should not be arranged along the fault.

Article 74 The net section of the open roadway must be determined on the principle that the section after the maximum permissible deformation of the support can meet the needs of pedestrians, transportation, ventilation, pipelines, and equipment installation, maintenance and so on. The selection of the net section shall be in accordance with the relevant provisions of the current "Coal Mine Safety Regulations" and the current national standard "Design Code for Coal Mine Roadway Sections and Intersections".

Section 9: Transportation of Main Roads

Article 75 The main transportation of coal in main roads shall give priority to belt conveyors; mines should be arranged with coal bunkers at the bottom of the shafts, and large-scale mines with a construction scale of 3.0 Mt/a and above may use belt conveyors for continuous transportation from the down channel of the back-mining face to the ground.

Article 76: The mode of underground auxiliary transportation shall be based on the principles of reducing the number of auxiliary transportation links and reprints, reducing auxiliary transportation personnel, and improving the efficiency of transportation, and shall be determined by a comprehensive comparison of factors such as the deployment of underground pioneering, the mode of coal transportation, and the distance and volume of auxiliary transportation of materials and personnel, and shall be in accordance with the following provisions:

(1) When the surrounding rock in the main road, the mining area, the upper and lower mountains, and the angle of inclination of the coal seam are suitable, and the rock quality and the angle of inclination of the coal seam are suitable. (a) When the lithology and the inclination angle of the coal seam are suitable, it is appropriate to implement direct transportation from the bottom of the shaft yard to the main road, the mining area up and down the mountain and the return mining face down the road.