Sudden mechanical injury emergency drill plan

Sudden mechanical injury emergency drill plan1

1, the purpose

In the Fushun Ikosi New Materials Co., Ltd. construction site, in the event of construction personnel lifting machinery, rigging injuries, in order to be able to quickly and orderly emergency response work, maximize the protection of the lives of the injured, and minimize the loss of state property. Losses, to minimize the harm of the accident, especially the development of this emergency plan.

2, the scope of application

This plan specifies the lifting machinery, rigging injury emergency response plan procedures and requirements.

This plan should be used in the construction site lifting machinery, rigging accident emergency response management.

3, lifting machinery, rigging injury emergency implementation procedures

(1) found that the personnel lifting machinery, rigging injuries, the first person to find out should call for help, and at the same time, send out first aid signals to notify the scene of emergency rescue team.

(2) The site emergency response team immediately rushed to the scene of the accident, the organization around the employees to protect the scene.

(3) On-site emergency rescue team according to the injury to take the necessary care, while making a decision to take the kind of emergency first aid measures.

(4) the scene of emergency rescue team immediately contact the nearest hospital to inform the injured and the time of occurrence, the hospital to make first aid preparations and dispatch ambulances.

(5) site emergency rescue team to the project emergency leadership team to report the situation, if necessary, request assistance.

(6) Doctors and members of the on-site emergency response team with the vehicle to send the injured to the hospital for first aid, not to give up treatment on the way. Project emergency leadership team and on-site rescue team always keep in touch with the same time the project emergency leadership team to the higher level of hospital contact, so that in the local hospitals can not deal with the timely transfer of treatment.

Emergency drill plan for sudden mechanical injury2

I. Hazardous features:

1. unauthorized operation of packers and manipulators;

2. inflexible switches

Second, the current control situation:

1. the operator is not familiar with the operating procedures Unfamiliar

2. Plus protective lighting

Third, the scenario hypothesis:

Reach into the packaging machine to send touch, inadvertently cut his fingers.

Fourth, emergency:

1. Immediately issued an emergency call for help, the emergency team members quickly into the room of the director of the duty to take medical equipment, bandage the wound.

2. Notify the head of each department to organize the emergency personnel sent to the hospital to deal with wounds.

3. Workshop supervisor to fill in the accident occurred (year, month, day, shift) through.

4. Reported to the General Manager's Office.

5. Find the root cause of the accident.

6. To analyze the typical factors of unsafe production behavior.

7. Emphasize in the pre-shift and post-shift meeting for production safety precautions to strengthen the awareness of employees.

Sudden mechanical injury emergency drill plan 3

In order to effectively prevent the occurrence of sudden mechanical equipment, mechanical injury accidents, minimize accidental injuries, according to the "People's Republic of China *** and the State Safety Production Law", combined with the actual project, the development of this plan.

First, the project may occur in the mechanical equipment, mechanical injury accidents

1, the performance of mechanical equipment failure, resulting in some parts fall off, fracture, resulting in itself or the pendant fall hurt people and things.

2, mechanical equipment performance failure, resulting in power leakage, brake failure, the operator electrocuted, the vehicle rushed out of the road overturned.

3, the operator does not operate in accordance with the procedures, resulting in the surrounding personnel, vehicles, objects injury.

4, construction workers do not follow the construction safety regulations construction, do not pay attention to their clothing wear, resulting in their own injury.

Second, the prevention of machinery and equipment, mechanical injury measures

1, the units should strengthen the leadership of the safety of machinery and equipment, and regularly organize operators to learn the principles of machinery and operating procedures, to improve the awareness of safe production, check the equipment failures, found that the problem is corrected in a timely manner, to eliminate the hidden dangers.

2, each unit of machinery and equipment operators must hold the relevant departments issued by the operating license, and familiar with the structure of the equipment, principles, performance and safety requirements, operators are strictly prohibited from operating in violation of the mechanical equipment with "sick" operation.

3, the education of machinery and equipment operators to operate in strict accordance with operating procedures, pay attention to the surrounding environment, to protect themselves and do not harm others. Education of other employees in accordance with the project construction safety requirements of construction, and construction machinery to maintain a safe distance; pay attention to their own clothes to wear, to prevent being involved in machinery, resulting in personal injury.

Three, emergency rescue rescue quasi match

1, the establishment of emergency rescue leadership group. Manager of the Ministry, sub-manager of the Ministry of emergency response leadership group that is the manager of the Ministry, sub-manager of the Ministry of the collapse of the emergency rescue leadership group.

2, the manager of the department, the manager of the department of the relevant functional departments usually do emergency rescue materials, technical preparations.

Fourth, the response and emergency rescue

1, the accident reporting process according to the project department "emergency plan" provisions.

2, once the accident occurs, the accident scene set up emergency rescue headquarters, according to the project department "emergency plan" leadership group, departmental division of labor, mobilization of people, machines, objects, equipment, first rescue victims, evacuation of hazardous areas, people, machines, objects, equipment, cut off the chain of spread of the accident, control the scene. The emergency command at the accident scene should provide technical support according to the protocol and on-site situation to prevent secondary accidents from occurring. Victims shall be immediately sent to hospitals for treatment if they need emergency treatment after temporary disposal. If external support is required, the command shall promptly notify the relevant local departments and request assistance. Command staff should utilize all resources to eliminate accident hazards as soon as possible.

3, the accident occurred in the relevant units must strictly protect the scene of the accident, really need to move the scene because of the rescue objects, must make signs, photographs, detailed records and draw a map of the scene, and properly preserved the scene of the main traces, physical evidence.

V. Emergency rescue technical measures

1, leakage electrocution. If the mechanical equipment leakage electrocution phenomenon, the person concerned should be promptly reported to the person in charge of the work area or the emergency rescue leadership group, to take effective rescue measures. If the operator is electrocuted, the electrocuted person should be detached from the power supply as soon as possible to implement rescue.

2, brake failure. Brake failure when going uphill, can not take off the gear, let go of the gas pedal, pull over, turn off the engine, use the hand brake to stop the car, and then find someone to dispose of. Downhill when the brake failure, hanging low gear driving, can not turn off the engine, driving to the side, driving to a flat place to turn off the engine, using the hand brake to stop the car, and then find someone to deal with.

3, lifting equipment accidents. When lifting equipment accidents, immediately evacuate the site personnel quickly, notify the emergency rescue team, and organize personnel to deal with the derrick, electric hoist (winch), coupling safety hazards.

Six, aftermath disposal

After the end of the emergency response, the managerial department, sub-managerial department and the relevant departments, should do a good job of aftermath disposal, for the casualties in the emergencies, emergency response personnel, as well as emergency mobilization, requisitioning of the relevant units and individual materials, in accordance with relevant regulations, to give compassion, subsidies or compensation, and provide psychological and Judicial assistance, production recovery work.

Seven, accident investigation and treatment

After the emergency rescue, the manager department, sub-manager department to organize the relevant departments or to assist the superior investigation team, the cause of the incident, nature, impact, responsibility, lessons learned for investigation and assessment, and in accordance with the "four don't spare" principle of the emergency incident. The principle of "four don't spare" to deal with the emergencies.

Sudden mechanical injury emergency drill plan 4

To conscientiously implement the implementation of the "safety first, prevention first" approach to production safety, to further strengthen the production safety management of the Ministry of the project to control and reduce the occurrence of mechanical injury accidents, and in the event of an accident can be decisive, take effective measures and timely rescue, minimize casualties and minimize the impact of the accident, and to minimize the impact of the accident on the environment. Maximize the reduction of casualties and property losses, according to the "Construction Safety Management Regulations", "Safety Technical Regulations for the Use of Construction Machinery" and the relevant provisions of Guangdong Province, Shenzhen City, combined with the actual situation of the Ministry of the project, the development of emergency rescue plan for mechanical injuries.

First, the project overview

Shenzhen Bolton Science and Technology Park, a phase, the second phase of the project is located in Nanshan District, Shenzhen City, Xili Tea Light Road, the site of the R & D building (Phase II project) *** there is a basement of two floors, the A tower above ground structure of 25 floors, the height of 113.3 meters, the B tower on the ground of 21 floors, the height of 96.8 meters, which podium 3 floors, total building height of 96.8 meters. The podium has 3 floors, with a total floor area of 94705 M2, including 19820 M2 in the basement and 74885 M2 on the ground. The first phase of the plant project includes a tobacco flavor (I) workshop of 3127 M2, a tobacco flavor (II) workshop of 1312 M2, a savory flavor workshop of 1691 M2, a power workshop of 725, a general warehouse of 677 M2, a hazardous goods warehouse of 677 M2, a fire protection pool and a pump room of 661 M2, a water tank and a pump room of 661 M2, and a water pump room of 661 M2, and a water tank and a pump room of 661 M2. The first phase of the plant project has a total construction area of 8,877 M2. In view of the characteristics of the project, the project department mainly focuses on the prevention of mechanical injuries by checking whether all kinds of mechanical safety guards are complete and effective; whether the personnel of the special equipment is licensed; whether the operators operate according to the instructions and operating procedures, and so on.

Second, the project emergency rescue organization:

Project emergency rescue leading group

Group leader:

Group member:

Project emergency rescue team

Team leader:

Team member:

Third In order to avoid the occurrence of mechanical injury accidents, minimize the loss of mechanical injury accidents and accidents caused by the negative impact, to protect the property and personnel safety, for the actual construction site, the development of this emergency plan.

2 Scope of application

This emergency plan applies to the project department in the event of mechanical injury accidents, emergency preparedness and response.

3 Responsibilities

3.1 When the mechanical injury accident occurs, the project manager is responsible for directing the accident.

3.2 The project emergency rescue team, constructor, safety officer and other relevant personnel should be at the place where the accident occurs, and cooperate to deal with the accident.

4 Basic safety requirements to prevent mechanical injury accidents

4.1 Education and training measures. For all types of machinery operators to strengthen the general knowledge of machinery, safe operation of stacked knowledge of education and training to improve safety production skills and safety self-protection awareness. Education and training can be used in the form of training courses, bulletin boards, knowledge contests, safety meetings, pre-shift meetings and so on.

4.2 for all types of machinery operators, especially special operations operators, according to the relevant state laws and regulations require the organization of training, to achieve all the requirements of licensed.

4.3 Strengthen mechanical equipment maintenance. The use of units at all levels, departments regularly repair and maintenance of machinery and equipment, improve all types of safety components, the national mandatory requirements for testing equipment by the authority of the department testing, external strict inspection of test certificates, from the essence of the elimination of hidden dangers of mechanical safety.

4.4 Do a good job of special inspection of machinery and equipment, equipment management department on a regular basis on all machinery for special inspections, focusing on checking the safety components of the equipment, testing, equipment, equipment, equipment, clear the state expressly prohibit the use of the equipment, the detection of hidden equipment safety and supervise the relevant departments of the maintenance, rectification, and strive to all types of machinery and equipment in a safe operating condition.

4.5 Strengthen site supervision and inspection. The safety departments and site safety officers to strengthen the construction site supervision and inspection of the use of machinery and equipment, safety departments regularly check the site full-time safety officers should be dedicated daily inspection, found that the equipment accident hidden danger, and immediately formulate rectification measures, fixed person fixed responsibility to determine the rectification time, to eliminate all the equipment safety hazards.

4.6 The construction site is equipped with the necessary disinfectant drugs and first aid supplies, to ensure that the occurrence of mechanical injuries required for emergency response.

5 Emergency plan content

5.1 Minor injuries

5.1.1 Immediately shut down the operating machinery, protect the scene, and report to the emergency team.

5.1.2 Simultaneously disinfect, stop bleeding, bandage, pain relief and other temporary measures for the injured.

5.1.3 Send the injured to hospital as soon as possible for anti-infection and anti-tetanus treatment, or further examination according to medical advice.

5.2 Serious injuries occurred

5.2.1 Immediately shut down the operation of machinery, protect the scene, and promptly report to the site emergency command team and the relevant departments, the emergency command department received the accident report, and then quickly rushed to the scene of the accident, the organization of the accident rescue.

5.2.2 Immediately bandage the injured, bleeding, pain relief, disinfection, fixation and other temporary measures to prevent the deterioration of injuries. If there is a broken limb, etc., promptly wrapped with a clean towel, handkerchief, piece of cloth, placed in a non-cracked plastic bag or rubber bag, the bag mouth tied tightly, placed around the pocket ice, ice-cream and other cooling items, shall not be coated with alcohol, iodine and other disinfectant in the amputation of the limb.

5.2.3 Rapidly call 120 for help and send the nearby hospital first aid, amputated limbs are transported with the injured.

5.2.4 In the case of traumatic bleeding casualties, should be quickly bandaged to stop bleeding, so that the casualty to keep in the head down feet high lying position, and pay attention to keep warm. Correct on-site hemostatic treatment measures:

a) General wound hemostasis for small wounds: first flush the wound with saline (0.9% NaCl solution), apply red mercury water, and then cover it with sterilized gauze, use a bandage, and bandage it more tightly.

b) Pressurized bandage hemostasis: Use gauze, cotton, etc. to make a soft cushion, placed on the wound and then bandaged to enhance the pressure to achieve hemostasis.

c) Tourniquet hemostasis: choose elastic rubber tubes, rubber bands, or triangular towels, towels, strips of cloth, etc., upper limb bleeding ligature in the upper arm on the upper 1/2 (close to the heart position), lower limb bleeding ligature in the thigh on the upper 1/3 (close to the heart position). When ligating, put sterilized gauze cotton gauze between the tourniquet and the skin. Relax it every 25-40 minutes for 0.5-1 minute.

6 telephone report rescue instructions

6.1 In the local rescue at the same time, you should immediately call the 120 phone, to the medical unit for help, and prepare the vehicle ready to transport the injured to the nearest Xili hospital for treatment.

6.2 Make a phone call to try to say the following things:

a: Description of the injury and what measures have been taken, so that the ambulance crew to prepare for first aid in advance;

b: Speak clearly where the injured in what place, what road a few what intersection, what kind of features in the vicinity;

c :Description of the unit of the reported rescuer, name and phone number;

d: Pass the injured in what place, what road several what intersection, what kind of features nearby;

c :Description of the reported rescuer unit, name and phone number;

d: After the call, should be sent to wait outside the scene to meet the ambulance, while the ambulance into the site of the road obstacles to give timely clearance, in order to ambulance arrives in a timely manner, can be rescued.

7 Mechanical injury emergency plan personnel and their telephone numbers:

7.1 Duty phone:

7.2 Emergency rescue leading group leader:

8 Accident after the work

8.1 with the relevant departments to identify the cause of the accident and the responsible person.

8.2 Write a report in writing to the superior, including the time and place of the accident, the name of the injured (dead), gender, age, type of work, the degree of injury, the injured part.

8.3 Develop effective 'preventive measures to prevent the recurrence of such accidents.

8.4 Organize accident education for all personnel.

8.5 Read out the results of the accident to all personnel, and the treatment of those responsible.

9 Appendix

Emergency Equipment List

Omitted

Sudden Mechanical Injury Emergency Drill Plan 5

Mechanical injuries are common accidents in on-site mechanical equipment construction. It is also the main type of personal injury accident on the project. The purpose of preparing an emergency response plan for mechanical injuries is to deal with personal injury and death due to mechanical injuries in a timely, effective and rapid manner, and to avoid and mitigate personal injuries and property damage caused by mechanical injuries.

I. Scope of application of the plan

This emergency plan applies to all employees engaged in the production of the project, in the workplace mechanical injury accidents, bear the responsibility for the implementation of emergency rescue of other people's injuries. In other places in the occurrence of mechanical injury accidents, bear the obligation to implement emergency rescue of outsider injuries.

The second simulation exercise

Assuming that the mechanical injury accident occurred in the contract section of the project, the loader driver Pu Xiaogang in the backing up, due to the lack of concentration, suddenly touched down the workers Wang Shijun, Wang Shijun fell to the ground, leg injury.

Three, drill time and personnel

(1) drill plan

The project department decided to July 21, 20xx at 3:30 pm, in the project department to carry out mechanical injury emergency rescue plan drill. 7:00 pm on July 20, in the project department of the first-line workers amateur school, by the safety and environmental protection engineer Xue Liangyou to all participants in the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department, the project department and the project department. Liangyou conducted the briefing of this drill to all the participants of the project department.

(2) The main participants are:

Project office leaders, director office leaders, the company's safety office leaders, project leaders, project department heads and members of various departments, machinery operators, civilian workers, etc.

Fourth, the plan of the organization and responsibilities:

1, the organization of the mechanical accident Institution (commander-in-chief)

Commander-in-chief: Liu Guoying

Main responsibilities:

a, fully responsible for the scene of the emergency rescue work;

b, the decision to start the emergency response plan;

c, the command of the emergency rescue work.

Deputy commander-in-chief: Yang Yang, Xue Liangyou

Main responsibilities:

a, organize the emergency rescue work;

b, coordination of all departments to unify the scheduling of the work;

c, responsible for the investigation, monitoring and rescue program to determine.

On-site commanders: Yin Jun (Project Office), Huang Zhijiang (Office of the Superintendent), Ding Jian, Tao Wentao,

Main Responsibilities:

a, conveying, liaising with all departments of the exercise, responsible for the smooth flow of traffic and rescue routes and on-site vigilance;

b, assisting the commander-in-chief to do a good job in all logistical matters and related to the preparation of materials for the exercise and other related matters;

c. Coordinate the communication with local hospitals and be responsible for the work of collecting and organizing the information of the drill.

2, the responsibilities of each group:

(1) accident handling group: the main task is to determine the rescue program and organize personnel and vehicles rescue, rescue the injured in the mechanical injury accident; (Tao Wentao)

(2) medical rescue group: the main task is to rush to the scene of the accident in a timely manner to rescue the injured, depending on the condition of the injuries to determine the first aid on the scene or in a nearby hospital to ensure that the personnel's life safety. life safety. (Ding Jian)

(3) vigilance liaison group: the main task is to upload and send the leadership instructions and guide the traffic routes, and to ensure that the vehicles to and from the line unimpeded, the external liaison to inform the scene of the mechanical injuries occurring in the accident, and sent to the intersection of the pick up and record the whole process of the exercise. And is responsible for the scene of the aftermath of the work.

(Xu Rongfu)

(4) Logistics Support Group: the main task is to follow the instructions of the leadership of the command department to arrange for the deployment of rescue exercise vehicles as well as the timely supply of emergency funds. (Xu Changxian)

V. Exercise procedures:

(a) Membership of the groups

Accident handling group: Tao Wentao, Wang Fashuo, Wang Zhushan, Zheng Wei

Medical rescue group: Ding Jian, Wang Wang Wangchuan, Fei Ruiming, Chang Zhiheng, Chen Yanbo

Vigilance and liaison group: Xu Rongfu,

Hu Guotao, Xu Rongfu,

The first two groups were in the same room, but they were not in the same room. >

Hu Guotao, Xu Junhua, Li Hao, Niu Weijian

Logistical support group: Xu Changxian, Yang Wei, Fan Shengjian

(b) July 21, 20xx at 15:30 pm sharp, the site commander Liu Guowei announced the start of the exercise.

(C) drill specific implementation steps

① Fan Shengjian before the drill arrangements for the loader placed in the project department basketball court, 15:31 minutes Xue Liangyou whistle on behalf of the accident, the loader backed up and touched down the worker Wang Shijun, there are injuries.

② 15:32 minutes Tao Wentao ran to the deputy commander-in-chief Yang Yang briefly reported the mechanical injury accident location, machinery, personnel specifics. Immediately Yang Yang to the commander-in-chief Liu Guoxing report, Liu Guoxing instructions "as soon as possible to rescue the injured, immediately start the emergency plan for mechanical injuries.

③ 15:32 minutes alert liaison group leader Xu Rongfu rate alert liaison group quickly set up a cordon, guiding the surrounding workers to evacuate to a safe area and evacuate onlookers, for the scene rescue to provide enough space. Xu Changxian is responsible for communicating and coordinating with local hospitals, and arranging for the Civilian Workers Group to ensure the smooth flow of the ambulance path for the drill, and recording the whole process of the drill with a video camera, and Xu Junhua shooting the drill with a camera.

④ 15:32 accident handling group under the leadership of Tao Wentao rushed to the scene and organized the personnel to stop the loader.

⑤ 15:33 minutes Ding Jian, head of the medical rescue team, led the members of the team, Wang Guanchuan, Fei Ruiming, Chang Zhiheng, Chen Yanbo to disinfect, stop bleeding, bandage and other simple treatment of the injured, and initially check the extent of their injuries, in order to carry out the next step of the rescue team.

⑥ 15:10 hospital ambulance arrived at the scene, ambulance group leader Ding Jian sent two people will be sent to the hospital ambulance stretcher, ambulance group Chen Yanbo, Wang Champion set out with the car care for the injured.

⑦15:30 alert liaison group leader Xu Rongfu led the group members Hu Guotao, Xu Junhua put up the cordon and the scene of the aftermath of the treatment.

⑥ 15:35 deputy commander-in-chief Xue Liangyou reported to the commander-in-chief Liu Guoying that the drill is complete, and the commander-in-chief Liu Guoying made a brief summary of the drill.

Six, rescue equipment and materials

Project ambulance with a car, stretcher a bed, oxygen cylinders, a medical box (inside the antiseptic solution, medical bandages and other first aid medicines, cotton swabs, etc.).

Seven, notes

1, vigilance liaison group should be careful and detailed record of the time of the exercise, reporting time, personnel injuries, the scene of the situation of personnel.

2, the logistics support team in the day of the exercise must ensure that before 15:30 points to all the exercise personnel and materials transported to the project, emergency funds and logistics-related material arrangements in place.

3, rescue personnel to arrive at the scene in the shortest possible time, rescue personnel arrived at the scene of the accident, follow the orders of the command department to carry out first aid work. After the rescue is over, all the people will be taken out of the accident scene and evacuated to the safe area.

4, the commander-in-chief Liu Guoxing made a summary of the drill announced the end of the drill, all the drill personnel withdrew from the drill site, back to normal work.

Through this drill, all the construction workers are clearer and clearer about the rescue procedures of the emergency rescue plan. In response to emergencies to ensure the implementation of the emergency plan in an orderly manner, for the rescue to buy time, to achieve the purpose of the exercise.