1. power outage emergency plan
One, the purpose of the emergency drill:
Improve the ability to respond to sudden power outages, to protect the normal conduct of medical work.
Second, the content of emergency drills:
The normal 1 transformer failure led to power outage of the department quickly switched by the normal 2 transformer power supply.
Third, the emergency drill time:
May 31, 20xx 13:30 pm
Fourth, the emergency drill location:
outpatient building, inpatient building, high distribution room.
V. Emergency Command Team:
Chief Commander: XXX
Deputy Chief Commander: XXX
VI. Working Group:
Leader: XXX
Deputy Leader: XX
Members: Engineering Department, Security Department
VII. Preparation for Emergency Exercise:
Notify all departments of the power outage of the program. Program to notify the power outage departments, prepare emergency lights and so on.
VIII, emergency drill description:
May 30, 20xx, high distribution room often 1 transformer failure, resulting in outpatient building, medical building, inpatient building multi-sector blackout, the property engineering department quickly in accordance with the plan repair, 15 minutes later, the power supply will be switched to the often 2 transformer, restoring power supply. (The drill, does not affect the operating room, blood dialysis room, ICU and other key departments, because these departments are equipped with the end of the automatic switching bit, in case of emergency can be automatically switched to the normal 2 transformer, to ensure normal power supply)
Nine, emergency drill procedures:
1, the commander-in-chief XXX announced the start of the drill.
2, the high distribution room often 1 transformer failure lights, staff quickly reported to the Department of Logistics, property managers, while the implementation of repair.
3, logistics and security department immediately after receiving the report command security center, the use of public **** broadcasting system to issue a sudden power outage notice, notify the outpatient emergency room, ward medical staff to maintain order. Comforting propaganda to stabilize the mood of patients or family members in the outpatient emergency room and about the elevator (elevator trapped in the implementation of the plan).
4, the property was notified, the engineering department six staff divided into three groups, respectively, into the door building, inpatient building of the high distribution room and the total high distribution room, the power supply transformer from the normal 1 switch to the normal 2, to restore power supply, and to the normal 1 for troubleshooting.
5, elevator class is responsible for each elevator patrol.
6, the security guard is responsible for emergency room patrol.
7, after filling out the emergency reported to the hospital office.
X. Notes:
1, the emergency drill before the preparatory work should be adequate, publicity work should be in place.
2, the electrician to switch the power supply in strict accordance with the operating procedures to implement.
2. Emergency plan for power outage
1, the occurrence of emergency power outage, should be promptly reported to the general manager's office, the person in charge of the Ministry of Affairs should immediately rush to the distribution room to organize repair, check the cause of the accidental power outage, reduce the accidental loss of production. This article is from. Notify the mall broadcaster to apologize to customers and remind employees. The electrician operator should check and analyze the cause of the power outage.
(1) If it is the cause of the power supply department line, the fire emergency power supply should be started in time for local power supply.
(2) If it is a localized electrical failure blackout, the blackout area should be repaired in a timely manner, as soon as possible to restore power.
(3) Especially during the night business blackout, such as power supply can not be timely, should be reported to the general manager's office leadership, to decide whether to operate.
2, departmental managers, functional managers should be present to maintain business order. Salesman, cashier must stick to their posts, effectively do a good job in the area of security, to customers to do a good job of explaining the work, the administrator should be organized to guard the main channel, to maintain a good look at the site of the goods, to prevent the goods artificially short, to prevent theft and robbery. If the power outage time is not long should be timely to the customer to explain the power outage time, stabilize the customer.
3, loss prevention personnel should quickly rushed to the blackout parts of the main channel mouth, the gate, control customers into the field, monitoring the theft and robbery. Prohibit the closure of the fire evacuation channel.
4, the night business during the blackout, such as power supply can not be timely, should be reported to the general manager's office leadership, by the general manager to decide whether to continue business. This article is from. If you decide to stop business, you should promptly notify the loss prevention and department to do a good job in advance of the closing and clearing preparations to guide customers away from the scene, control the entry of personnel.
5, after the resumption of power supply should be located in the area of goods, electrical equipment, etc. to check to prevent theft and robbery.
6, the fire monitoring center should be obtained by the monitoring staff on duty, in order to issue timely instructions.
3. power outage emergency plan
A, guiding thinking:
Emergency response plan is to respond to emergencies, mastering the development of the accident, reduce the loss of the accident of an effective way according to the national, provincial and municipal for the enhancement of the public **** insurance emergency prevention work request and "Anhui Province, primary and secondary school students personal safety accident prevention and Disposal measures" provisions, combined with our school may appear irregular power outage situation, such as in the case of evening self-study or dormitory power outage, in order to all the residential student safety, the school should be developed accordingly power outage emergency plan.
Second, the work requirements:
Once the power outage emergencies in the evening, to immediately start the emergency response plan, in accordance with the same command, hierarchical responsibility, the guidelines of their respective responsibilities, in a timely manner to control the situation, and strive to minimize the damage of the accident.
Third, prevention and emergency preparedness:
1, the General Affairs Office of the school on a regular basis, electrical appliances, lines, etc., to review, to prevent accidental power outages due to the school's own factors.
2, according to the superior document energy configuration emergency lights, to protect each dormitory as well as the evacuation channel have emergency lights, strictly prohibit the application of candles in the dormitory.
3, on the life of the instructor, on-duty administrative equipment such as flashlights in case of emergency.
4, often the application of classroom lessons, school parties, etc. to the students of the blackout emergency related to the publicity and education, and can be based on the emergency plan for the drill.
Fourth, the teaching building evening self-study large-scale power outage emergency plan:
1. The class counseling teacher will first of all students in the classroom, stabilized students emotions.
2. The administration on duty to understand the situation, tell the person in charge; if the power outage can not be restored in a short period of time to evacuate the students, should be immediately notified to the class counselor.
3. dispersal of students, all counseling teachers to hold the building and stairway, organizing the orderly evacuation of students, teaching students to walk down the stairs on the right, to stop the students in the evacuation process froze to tie their shoes or pick up the items dropped, the evacuation of all floors must be staggered time to avoid crowding, ravaging.
4. Evacuation of all counseling teachers should be with their classroom students together, responsible for the evacuation of the command and organization, until all students separated from the building.
V. Dormitory power outage emergency plan:
1. Career leadership teachers in the first time to notify the duty leader, and obey the deployment of the duty leader.
2, after the blackout, each dormitory students must adhere to the quiet, is strictly prohibited loud, playful, not allowed to light candles without permission.
3, the dormitory director commanded the dormitory students quickly go to bed, and pay attention to safety.
4, during this period, the students are strictly prohibited from visiting each other's dormitories or coming downstairs.
5, if there is a special emergency need to go out of the dormitory, you must call the duty Mr., after permission by the duty teacher led out of the dormitory.
6, the teacher responsible for the dormitory inspection must be responsible for the obligation to take the flashlight to the dormitory to urge students to go to bed and deal with the emergency.
7, the administrative guidance on duty to monitor and direct the above process.
4. Emergency plan for power outage
I. Temporary power outage:
1. After a sudden power outage, the engineering section should immediately contact the power supply company to find out the reason for the power outage and the time, and to inform the owners of the power outage one by one;
2. Check all the facilities and equipments of the public **** part of the facilities and equipment, and disconnect the power supply in time to prevent a sudden incoming call. Produce danger;
3, if the power outage at night, the Security Section to strengthen the neighborhood patrol. As the monitoring center has a UPS backup power supply, the duty officer needs to pay special attention to the community perimeter and monitoring system, a timely notification of the situation patrol personnel to go check.
Second, in advance, has been notified of the blackout:
1, received a blackout notice immediately after the printing of the blackout notice posted on the community bulletin boards and unit bulletin boards, so that owners are informed of the blackout information in a timely manner;
2, the Engineering Technology Section of the company was informed of the blackout of the specific time to check all of the facilities and equipment of the public *** part of the blackout, after the disconnection of the power supply in case of a sudden call to produce a danger!
3, if the power outage for a long time, the owners need to order food and beverage or carry items, our company will promptly arrange for personnel to contact or help carry;
4, if the power outage at night, the engineering section to strengthen the community patrol. As the monitoring center has a UPS backup power, the duty officer needs to pay special attention to the community perimeter and monitoring system, and notify the patrol personnel in a timely manner to check the situation.
Third, processing measures:
1, the power supply company should be prompt supervision of the power supply company for repair.
2, the internal causes of the community should immediately organize the engineering section of the detailed record of the beginning and end of the power outage time, the cause of the incident, the response and the damage caused by the good repair and post-processing work.
5. Emergency plan for power outages
First, the development of the purpose of
In response to the hospital's sudden large-scale power outages, rapid and orderly organization and restoration of power supply to ensure the safety of patients and reduce the loss of property, to ensure that the hospital power smooth, to promote the institutionalization of the emergency response to accidents and standardization of the work based on the relevant national laws and regulations, combined with the actual situation of our hospitals. According to the relevant national laws and regulations, combined with the actual situation of our hospital, the development of this plan.
Second, the scope of application
This plan refers to the "sudden large-area power accident" (hereinafter referred to as "large-area blackout") refers to sudden hospital-wide damage due to severe natural disasters, damage to important facilities or sabotage and other reasons. Large-scale power system security failures, power grid disintegration or collapse of a large area of the accident.
Third, the principle of emergency response
large-area blackout accident handling work to implement the "prevention-oriented, unremitting" policy, follow the "unified leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive" principle. The principle of "unified leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive.
Fourth, the organization
Strategy
Fifth, the emergency procedures
(a) logistics department electrician class emergency procedures
1, planned power outage emergency procedures
(1) electricians in the power supply company to notify the power outage of the phone or other forms of power outage notification, you must ask the time of the power outage, stop for how long and the reasons for the outage. The reason, make a good record, such as not in the shift, should be in the handover handover clear.
(2) notify the head of the emergency leadership team (half of the night to notify the general duty officer), explain the reasons for the power outage, the specific time of the power outage, how long the power outage, and do a good job in the preparation of the backup second power supply.
(3) If during normal working hours, time permitting, should be issued in writing by the Department of Personnel and Administration to the departments to notify.
(4) If the time is urgent, after receiving the notice from the power supply company, should immediately notify the head of the emergency leadership team (night notification of the general duty officer), explain the situation, by the Department of Personnel and Administration to the departments to send a notice, the important departments to talk to the head of the department head nurse to clarify the time of the blackout of the power supply, and make a good blackout plan.
(5) 30 minutes before the power outage to the distribution room, do a good job of switching to the second backup power supply pre-check. When the power outage to ensure the normal start and delivery of the backup second power supply in 15 minutes.
(6) 10 minutes before the power outage, all passenger elevators will be parked in the 1st floor position.
(7) When the external network power outage, start the generator power supply to ensure that the operating room emergency department and other key departments of the power supply.
(8) Make a good record of the operation of the second backup power supply and after the restoration of utility power supply.
2, temporary power outage emergency procedures
(1) temporary power outage, you should immediately ask the power company by phone, ask the reason for the power outage and the duration of the power outage.
(2) Notify the head of the emergency response team or the general duty to explain the situation.
(3) If the blackout time is short (within 10 minutes), you should wait for the utility to send high and low voltage power.
(4) If the blackout time is longer, you should immediately prepare to switch the backup second power.
(5) For various reasons, the dual power supply can not start, should start as soon as possible standby generator, to ensure that the key departments of power supply.
(6) Make a good record of the operation of the second backup power supply.
(7) hospital internal reasons for power outages, to identify the cause of the power outage, high-voltage circuits or low-voltage circuits. If the high-voltage circuit failure, the hospital electrician immediately introduced into the backup power supply, should be promptly contacted with the power supply department repair class, as soon as possible to restore, to ensure that the electricity; if the hospital mortgage circuit failure, should quickly identify the cause, in accordance with the operating regulations to restore the circuit.
(B) departmental sections of emergency procedures
1, the departments received a power outage notice, should be allowed to bar all of its power supply cut off, to be put back into use after the circuit is restored to normal.
2, after receiving the notice of power failure, immediately prepare for power failure. If there is a patient rescue use the backup power.
3, after a sudden blackout, immediately look for ways to rescue patients and their operation of the power to maintain the rescue work, and open the emergency lights lighting, etc.. And should promptly notify the electrician or the general duty.
4, critical patients using a ventilator in surgery should normally have a simple respirator next to the machine, in the event of a sudden power outage, health care workers immediately disengage the ventilator, the use of simple respirator to maintain breathing. The use of electric nitrogen suction patients, with a 50ML syringe connected to the nitrogen suction tube suction nitrogen.
5, such as double line are suddenly power supply failure, the hospital generator power supply, medical staff should first ensure that the patient resuscitation; nurses should be calm and collected, on the ventilator on the hand holding the ball method, on the monitor on the use of manual measurement of blood pressure and pulse, electric nitrogen inhalation is used to use the 50 ml syringe connected to the nitrogen suction tube suction, such as, close observation and please change, the rest of the staff immediately notify the electrician by phone, the Department of Personnel Administration, and the use of emergency lights. Personnel Administration, and the use of emergency lights for lighting.
6, strengthen the patrol ward, appease the patients, while paying attention to fire and theft.
7, the elevator encountered a sudden power outage, logistics staff to do a good job of passenger thinking, to the outside call, with artificial methods to put all the passengers out.
Six, safeguards
1, electricians should do a good job of generator maintenance daily to ensure that the generator is always in use.
2, electricians usually have to master the knowledge of power supply and operating norms, pay attention to operational safety.
3, clinical departments routinely equipped with emergency lights, torches and other lighting, regular checks, to maintain a perfect state.
4, the logistics department should be organized to carry out emergency power outage drills, 1-2 times a year, through the drill, so that everyone is familiar with the emergency procedures for emergency power outages, to ensure patient safety.