A, 100 square meters of dental decoration design
1, dental clinic decoration design to meet the basis of these professional regulations of the Department of Health, it is the dental clinic dental clinic decoration design and construction with the same content as the general work of the same content, colors, shapes, materials, through the exquisite design and organization of the construction, and finally delivered to the party is a health professional qualified, dental clinic decoration Through the exquisite design and organization of construction, the final delivery to the party is a health professional qualified, dental clinic decoration, practical and beautiful design, construction technology first-class perfect project.
2, dental clinic renovation design must comply with the health bureau regulations of the floor plan layout plan, is the necessary basis for each dental clinic renovation design, at present, the health bureau, all over the world, are required to each dental clinic renovation design must have a cleaning room, disinfecting room and closed medical filth room, and then dental film X-ray equipment room.
3, dental clinic renovation design sewage treatment equipment. At present, the local health bureau requires medical sewage needs to be treated and qualified before being discharged to the municipal sewerage system, the current small dental clinic renovation design after the sewage treatment equipment is not large, after ozone, plasma disinfection, and filtration devices, it can meet the health bureau regulations. Dental clinic renovation design need to pay attention to is that the dental clinic sewage treatment equipment, generally need to be below the drain, and have a storage tank, after the upper suction equipment, discharged into the sewage processor, and then discharged into the municipal sewers.
4, the design of the sterilization area and centralized and decentralized management. Sterilization and re-supply area is the center of the clinical work terminal, be sure to place this area in the center of the area, fully equipped with these two areas so that it can be disinfected and re-storage of all the instruments, if you are ready to create a clinic less than 10 treatment areas, do not consider the disinfection of the location of the location of the dispersal of the location of the multiple locations, you should be the center of the disinfection area. Don't waste money on a pre-established sterilization center either; these centers are too compact, usually don't employ full-time sterilization assistants, and don't provide a good cost-to-profit ratio.
5. The design and management of the stockroom should be applied. Gathering stock does not mean buying in large quantities. Consolidating the stockpile so that it can be quickly re-supplied is all that is required. Don't make yourself regret this one aspect of your design. We often see clinics that spend a lot of money on large quantities of goods piled up to the point of being overwhelmed. These make purchase control and inventory turnover impossible. It also makes product replacement limited and new technology impossible.
Two, 100 square meters of oral decoration order
1, the main demolition and alteration
The main demolition and alteration is one of the first on a project, mainly including demolition of the wall, masonry, shoveling the wall, demolition of the heater, replacement of plastic steel windows and so on. After the demolition of the garbage, to timely clean out, to ensure the cleanliness of the interior, but also more convenient for future construction.
2, water circuit transformation
Water and electricity before the transformation, cabinet designers should come to the door for the first time to measure and develop a transformation program.
3, the installation of socket panels
Socket panels can be installed in about half a day, it should be noted that the socket is best to buy a switch with the function of the switch can be controlled.
4, install the finished door
The finished door should be installed before the floor. Mainly because of the complexity of the steps to install the door, hinges, door locks, door sucker, door frame, etc., the use of many tools, such as the first installation of flooring, bumps and bruises is difficult to avoid.
5, the installation of hardware
It is recommended that before installing the floor, cinder scattered more fragmented items installed one by one, if the procedure is reversed, it is likely to cause damage to the floor.
6, install the floor
The floor must be done before the installation of chiseling, ask the workers do not cut the floor in the house, should go to the corridor to cut, so that as long as the last to clean the corridor can be.
Decorating the house, there are many things to know: price, selection of materials, soft furnishings, hard furnishings and so on. However, many people put their energy on the price and selection of materials, ignoring the order of decoration. The above is the content of 100 square meters of oral decoration design and 100 square meters of oral decoration order.