The post responsibility system of construction management personnel, a complete project department should be composed of project manager, project secretary, project chief engineer and other leading groups and functional departments of the project department such as engineering department, site laboratory and comprehensive office. Let's share the post responsibility system of construction management personnel.
Post responsibility system for construction management personnel 1 project engineer
1. The project engineer is the main technical director of the occupational health and safety work of this project, and should be familiar with and master the laws, regulations, standards and rules and regulations on occupational health and safety formulated by the state, local governments and companies.
Second, according to the national, local and company's laws, regulations, standards and regulations on occupational health and safety, the content requirements of safety production norms and regulations, combined with the characteristics of this project, design the safety technical measures of this project and write safety technical articles. Explain the possible hazards and preventive measures in the production process, as well as effective technical measures to ensure personal safety and health, and check and supervise the implementation at any time.
Three, before the start of the unit project, it is necessary to project related personnel, responsible person of ZuoYeDui who undertakes the construction, foreman, team leader and relevant personnel for the project overview, construction method, construction technology, construction procedures, safety technical measures and the disclosure of rules and regulations of unit safety production and civilized construction.
Four, responsible for technical measures plan and seasonal construction plan to formulate corresponding safety technical measures and supervise the implementation, timely solve the problems in the implementation, do a good job of improvement and change.
5. Participate in the acceptance of safety protection facilities and equipment of this project, and take timely measures to strictly control the protection facilities and equipment required by unqualified standards.
Six, to participate in the project safety inspection, the unsafe factors existing in the construction, put forward rectification opinions and solutions from the technical aspects, and review the rationalization suggestions on safety production technology.
Seven, to participate in the investigation and analysis of major casualty accidents, from the perspective of technical factors, put forward the cause of the accident and preventive measures.
Project foreman
First, the project foreman is directly responsible for the occupational health and safety of the work under his jurisdiction. Should be familiar with and master the laws, regulations, standards and rules and regulations related to work safety formulated by the state, local authorities and companies.
Second, we must strictly abide by the national labor protection laws and regulations, conscientiously implement the instructions of higher authorities on safety production and various systems of safety technology operating rules, refuse illegal orders, and immediately stop illegal operations and violations of labor discipline.
Third, strongly support the work of the safety officer, study the rectification measures in time for the problems raised by him, and do not delay time or delay under any excuse.
Fourth, organize the person in charge of the labor subcontracting team to hold a pre-shift or post-shift meeting every day, and make specific arrangements for safety work according to the characteristics of production tasks, site environment, equipment status and personnel thinking, and do a good job in safety inspection to eliminate potential safety hazards.
Five, according to the production tasks, construction characteristics, engineering site safety technical measures, issued safety technical disclosure. Check and accept the safety protection devices such as scaffolding, four-way protection, mechanical and electrical equipment erected on the construction site, and use them only after they are qualified, and shall not command illegally.
Six, organize workers to learn safety technical operation procedures, educate workers not to violate the rules, and improve workers' safety awareness.
Seven, under the jurisdiction of the section, team, regional civilization construction management, do it after the work, don't waste resources.
Eight, seriously eliminate the hidden dangers of accidents, industrial accidents should be reported in a timely manner, not to hide, heavy casualties, to protect the scene, to participate in the investigation and handling.
Project safety officer
First of all, the project safety officer is responsible for supervising the occupational health and safety in the whole construction process. Should be familiar with and master the laws, regulations, standards and rules and regulations on occupational health and safety formulated by the state, local authorities and companies.
Second, participate in the editing of safety measures in construction organization design, and put forward reasonable suggestions on safety production management. Assist the relevant departments at higher levels to formulate and improve the safety production management system and safety operation procedures for various types of work, and supervise and inspect the implementation of the project.
Three, assist the project manager to carry out the national laws, regulations and standards related to production safety, and supervise and inspect the implementation. Check daily safety production and urge relevant personnel of the project to eliminate hidden dangers of accidents. In case of "three violations", it should be instructed to stop operation first, correct and eliminate potential safety hazards, and report to the unit leader immediately if major safety hazards are found. Those who violate the law and discipline shall be dealt with according to the regulations.
Four, to assist the project manager in other professional management positions of education and supervision. Cooperate with the project manager to carry out occupational health and safety education and safety activities for all employees.
Five, responsible for organizing relevant personnel to carry out the propaganda of labor protection work, special operations personnel certification before taking up their posts, in conjunction with the superior departments of special types of work and robots for safety technical assessment, and handle temporary safety technical operation certificate.
Six, can independently handle general safety accidents, participate in the investigation and handling of major accidents, be responsible for the statistics, analysis and reporting of casualty accidents, and manage accident files.
Seven, responsible for the supervision and inspection of protective equipment (appliances) quality and correct use. Responsible for setting safety warning signs and supervising safety activities before shift.
Eight, urge the relevant personnel to do a good job of combining work with rest and protecting women workers (including subcontracting teams).
Nine, to assist the organization to carry out advanced production safety model and experience propaganda.
Ten, regularly put forward the project safety situation, analysis report and opinion.
Project technician
A, should be familiar with and master the national, local and company regulations, standards and rules and regulations related to equipment safety.
Second, responsible for the safety management of all kinds of equipment on the construction site, to ensure the safe use of equipment, the integrity and accuracy of data sorting and preservation. Check and inspect the equipment regularly to ensure that the safety protection device of the equipment is in good condition.
Three, all kinds of mechanical equipment safety protection device should be kept complete, sensitive, effective and reliable, mechanical equipment migration, safety protection device should be complete and effective at the same time, to avoid loss and damage.
Four, responsible for the installation of various equipment and meet the specified requirements, listed in the fixed assets should be managed according to the fixed equipment.
Five, in conjunction with the competent department at a higher level, the safety technical assessment of mechanical equipment operators, for temporary safety technical operation certificate.
Project website administrator
First, seriously study and master the laws, standards and rules and regulations on occupational health and safety formulated by the state, local governments and companies.
Second, assist the project manager to carry out civilized construction work, and be responsible for checking and supervising the implementation of civilized construction.
Three, responsible for the reasonable setting and management of fire control facilities, examination and approval of hot work. Participate in the investigation of the cause of the fire accident, and work out measures to prevent the fire from happening again with relevant personnel.
Fourth, organize civilized construction education for workers in subcontracting teams, and fill in, collect and sort out relevant information.
5. Be responsible for the implementation and inspection of working environment measures on the construction site.
Project materials personnel
First, seriously study and master the national laws, regulations and standards related to occupational health and safety, as well as the rules and regulations of enterprises.
Second, responsible for building materials, components, materials piled up according to the general layout, and neatly packed, need to cover or enclosure should cover enclosure.
Three, responsible for the safety protection supplies, appliances storage, distribution.
Four, responsible for the construction waste stacking and identification.
Five, responsible for the classification code release and storage of flammable and explosive goods.
Six, responsible for the custody of emergency supplies in the emergency plan, and can be issued in time.
Project information officer
1. Responsible for maintaining national occupational health and safety laws, regulations, standards and enterprise rules and regulations.
Two, we should seriously study and master the national laws, regulations and standards related to occupational health and safety, as well as the rules and regulations of enterprises.
Third, in accordance with industry regulations, the actual safety assurance data on the construction site should be filed, and the data collection should be timely, complete and accurate.
Four, responsible for the collection, induction and collation of occupational health and safety information. Data collection is timely and comprehensive, and the induction system is correct, neat and clean.
Five, to participate in the safety meeting organized by the project department, make meeting records; Records should be comprehensive and true.
Other management personnel of the project department
First, do your own occupational health and safety work well.
Second, be responsible for the safety work in your post.
Three, seriously study and understand the national and local laws, regulations and standards related to occupational health and safety, as well as the rules and regulations of enterprises.
Four, strictly abide by the rules and regulations, not illegal command, illegal operation, violation of labor discipline. Stop the phenomenon of "three violations" in time.
Five, actively rescue the wounded after the accident, protect the scene and report to the leadership in time; Assist relevant departments in accident investigation and evidence collection, and do not commit perjury.
Post responsibility system for construction management personnel. Job responsibilities of construction management personnel
The builder's post responsibility for production safety.
1, conscientiously implement the national guidelines, policies, laws and regulations on production safety and instructions from superiors.
2. Carry out the idea of "safety first, prevention first", and run the idea of "safety first" through the whole process of construction organization design when participating in construction organization design and construction scheme preparation.
3, study hard and master the professional theory and construction technology of building construction, in strict accordance with the national construction acceptance specifications, operating procedures and inspection standards, in the organization of comprehensive construction technology management at the same time, to put the engineering quality and safety management in the first place.
4, the project construction organization design or construction scheme, there must be safety measures, temporary electricity organization design, approved by the department head before implementation.
5, responsible for the concrete implementation of the construction organization design, construction organization plan, must be on the premise of high speed, low consumption and safety, to ensure the construction period.
6, responsible for the axis of the project, elevation control, positioning and unreeling, settlement observation, safety construction and other technical management work.
7. Organize and participate in the intermediate acceptance, completion acceptance, concealed engineering acceptance and signing of the main structure.
8, responsible for the preparation of construction technical disclosure (including construction, quality, safety construction methods, requirements to meet safety and quality standards), and organize the implementation before the construction of each component project.
9. Timely and carefully record, sign, collect, sort out and archive the technical records and materials of the affiliated projects.
10, specifically solve and deal with the problems in drawings and construction, eliminate common quality problems, and ensure the safe production of the project without accidents.
1 1, responsible for the use, storage and testing of instruments such as level and theodolite.
12. According to the characteristics of different engineering structures, conduct on-site inspection on key parts and implement relevant technical quality and safety measures.
Job responsibilities of quality inspectors in production safety
1, conscientiously implement the national production safety guidelines, policies, decrees, rules and regulations, as well as the instructions and resolutions of superiors.
2, at the same time of acceptance of the project quality, supervision and inspection of production safety, found that the problem immediately report to the superior, take preventive measures.
3, in conjunction with the safety, construction and other departments to prepare safety technology education plan, safety technology education for employees.
4. Participate in monthly and ten-day comprehensive inspection, check the problems existing in safety production at the same time, put forward rectification opinions and make rectification in time.
5. Carry forward the spirit of unity and friendship, supervise each other and abide by safety rules and regulations, be strict with yourself and take the lead in implementation.
Chief engineer's responsibility book for safety post
1, take safety responsibility for all technical problems in construction.
2. Seriously implement a series of national guidelines, policies, decrees, rules and regulations on production safety and the instructions and resolutions of superiors, and check the implementation.
3, organization, examination and approval of construction organization design, construction scheme, implement the "safety first.
A, prevention first "policy, the safety measures to penetrate into all aspects of the construction organization design and construction scheme, make the construction organization design and construction scheme become a scientific and comprehensive basis to guide the construction and inspection.
4, responsible for leading the publicity, education and training of safety technology, to participate in safety inspection, to find out the hidden dangers from the technical measures to put forward improvement methods.
5, to participate in the investigation of major casualty accidents, and put forward preventive measures and opinions on the cause of the accident, technology and other aspects.
Responsibility book of project manager's safety post
1, fully responsible for the safety production work of this project, put safety work on the agenda, hold special meetings on safety work at least twice a month, analyze and study the safety production situation, and make meeting records.
2, seriously implement the national production safety policy, labor protection policies, regulations, decrees and the construction plan approved by the superior, and check the implementation.
3, supervise and inspect the implementation of the responsibility system for production safety of personnel in various functional departments.
4, in strict accordance with the department, the project department on-site civilized construction management regulations to assess all the cadres and workers of the project department.
5. Take direct leadership responsibility for safety production, do not command against regulations, and stop illegal and risky operations.
6. Be responsible for the integrity, integrity, effectiveness and compliance of the project construction site, environment, safety and all safety protection facilities.
7, in the "five simultaneous" production activities, safety work must run through specific links and teams at the same time.
8, organize workers to learn safety technology operating rules, and check the implementation, education workers to use protective equipment correctly.
9. Organize and participate in the monthly safety inspection, and instruct the team to rectify the problems found within a time limit.
Material engineer's post responsibility for safety in production
1, conscientiously study and implement the relevant national production safety guidelines, labor protection policies and regulations, and the instructions of superiors on production safety.
2, safety nets, seat belts, safety ropes must be tension, impact test, qualified rear can warehousing acceptance.
3, steel, cement, commercial concrete and other important materials, must be sent to the relevant departments for acceptance before purchasing.
4. Important materials, machinery and equipment, especially the "three major materials" and "three treasures", must be purchased from manufacturers with good quality and good reputation, and must have the manufacturer's warranty and product certificate.
5. All fasteners and accessories supplied to the site must have factory certificates when purchasing, meet safety requirements when issuing, and must be overhauled after recycling.
6. Be responsible for purchasing labor protection articles, such as safety helmet, safety belt and safety net. Must meet the national requirements and standards.
7. Materials used for safety facilities approved by leaders should be included in the supply plan and collected in time.
Job responsibilities of equipment manager in safety production.
1. Strictly implement the management system of enterprise mechanical safety equipment, be responsible for the scheduling, repair and maintenance of mechanical equipment and scaffolding, and ensure that accidents caused by abnormal operation of machinery do not occur during the operation of mechanical equipment.
2, the establishment of mechanical equipment safety management accounting, records, accurate content, records carefully.
3. Formulate and organize equipment safety management system, and organize equipment maintenance regularly to ensure the normal operation of equipment and prevent accidents.
4. Be responsible for organizing equipment appraisal and carrying out accident-free equipment activities.
5, do a good job in equipment safety technology, organize and participate in the investigation and analysis of equipment accidents, and put forward treatment opinions.
6, seriously implement the safety operation procedures and maintenance procedures, keep the equipment clean, tidy and lubricated, and ensure that the equipment is in good technical condition.
7, organize safety technical training for mechanical operators, adhere to the related certificates, mechanical operators must wear protective equipment in accordance with the provisions.
8. Do a good job in fire prevention, theft prevention, moisture prevention and loss prevention.
9, often in-depth understanding of equipment maintenance, maintenance, use, to assist the leadership to do a good job in the safety management of various materials and equipment.
Job responsibilities of safety production of testers.
1, carefully study the national safety production policy, labor protection policy and superior instructions on safety.
2, strictly abide by and implement the provisions of the relevant national materials, test standards, methods and technologies. Responsible for the sampling test and inspection of raw materials such as mortar, concrete and original components to ensure the quality and safety of the project without accidents.
3, do a good job in the design and trial matching of concrete and mortar mixture ratio, often to the scene to check the use of mixture ratio, to ensure the engineering quality and safety without accidents.
4. Be responsible for filling, sorting and summarizing all kinds of test reports, and report the test results to the leaders in time.
5, often go deep into the scene to understand the situation, help the scene to master the mixture ratio of concrete and mortar, determine the moisture content and silt content of sand and gravel, timely sample the number of test blocks, and carry out pressure maintenance and delivery.
6. Maintain the test machinery and equipment, wipe the test molds and test instruments and tools clean, store them neatly and manage them properly.
7, according to the standard method to do a good job of sampling second-round exam of steel and sampling inspection of all kinds of welded joints.
8, when using commercial concrete, do a good job of mixing ratio monitoring statistics and records.
9. Evaluate the strength of mortar and concrete by mathematical statistics, and conduct dynamic control.
10, the inspection found that the material concrete did not meet the standard, and timely reported the test results to the project manager, so as to timely correct the use of unqualified products and nip unsafe factors in the bud.
1 1. Carefully organize all kinds of inspection data for future reference.
On-the-spot safety production post responsibility book
1, strictly abide by and implement the production policy of putting national safety first, as well as the instructions and resolutions of superiors on safety.
2. Collect engineering safety technical files in a timely and complete manner, and report any problems found in time.
3, often in-depth site to understand the progress of the project, collect safety information.
4, after the completion of the project, do safety information is complete, classified custody filing.
5. Keep a secret.
6, abide by the safety system.
Job responsibility system of construction management personnel 3. Job responsibilities of project manager
1. The project manager is the authorized agent of the legal representative of the construction enterprise and is fully responsible for the project on behalf of the enterprise.
2. Abide by the policies and regulations of the state and local governments, implement relevant rules and regulations and instructions from superiors, and perform the project contract signed with the owner on behalf of the enterprise.
3. Organize and deploy a lean and efficient project management team, and determine the responsibilities and authorities of various departments and institutions in the project management department.
4, presided over the preparation of the project construction organization design and quality assurance system, presided over the preparation of the overall project schedule and quarterly and monthly construction schedule, timely organize and deal with major technical problems in the construction.
5, according to the requirements of the contract and the instructions of the superior, to ensure that the construction personnel, mechanical equipment comes into play on time, to do a good job of material supply.
6. Presided over the formulation of the project cost plan, examined and approved the financial cost of the project, and formulated the income distribution plan for relevant personnel of the project.
7. Be responsible for the scheduling, arrangement, use and fund guarantee of the project funds.
8. Go deep into the construction site, deal with major construction accidents and solve major problems in construction.
9, timely processing of creditor's rights and debts, do a good job of asset liquidation, to ensure that the loss of state-owned assets.
10, do a good job in the spiritual civilization construction of the project and strengthen democratic management and ideological and political work.
1 1. Implement relevant national laws and regulations to ensure that the wages of migrant workers are paid in full and on time.
12. Be responsible for the performance of internal and external contracts of the company, and organize various inspections, supervision and assessment on this basis, and accept the supervision of superior departments.
13. Reward excellent employees and punish those who violate discipline according to the rules and regulations of the superior.
14. When an industrial accident occurs, organize rescue according to the emergency plan and participate in accident investigation and handling.
15, strengthen the management of materials, machinery and finance, and improve the management decision-making level and command ability.
Second, the chief engineer job responsibilities
1, under the direct leadership of the project manager, be responsible for the technical management and quality management of the whole bid section, and carry out the national and superior guidelines, policies, systems and methods related to quality work.
2. Organize technicians to be familiar with the contract documents and construction drawing design documents, understand the design intent, and participate in the design disclosure and blue prints.the design organized by the owner.
3, presided over the preparation of project implementation construction organization design and quality objectives, and organize their implementation.
4. Arrange the daily production activities of the project, supervise the implementation of the overall project schedule and the concrete implementation of quarterly and monthly construction schedule.
5. Responsible for formulating the quality responsibilities and work quality standards of various departments and technicians, making fair evaluation and assessment opinions on the performance of responsibilities every month, organizing the formulation of quality control measures in the construction process, work instructions for special procedures, and organizing regular quality inspection of each bid.
6. Do a good job in technical disclosure before and during construction, and review the work-start report of the division project.
7. Be responsible for the written technical disclosure to the construction technicians, and supervise and inspect the on-site technical disclosure of the construction technicians.
8. Guide the construction technicians to organize the construction in strict accordance with the design drawings, construction specifications and operating procedures, and control the quality and progress.
9. Establish the project quality management system, coordinate the quality work and the division of responsibilities and interface work of relevant departments, check the implementation of responsibilities of relevant departments, and report the operation of the quality system to the project manager regularly.
10, which releases quality information on behalf of the project department and processes quality information from the owner, supervision department and quality supervision department.
1 1. Lead the project engineering technology, quality and safety, measurement, test and measurement, and approve the test results and reports of measurement, quality inspection and test.
12, responsible for the review and implementation of the project engineering change design, reporting the claim intention and checking the integrity of the claim data.
13, presided over the compilation of completion technical documents, participated in the completion acceptance, organized the summary of construction technology and the writing of academic papers, and was responsible for auditing and reporting to superiors.
14. Complete other tasks assigned by the project manager.
Iii. Responsibilities of the General Department
1, under the leadership of the project manager and chief engineer, responsible for the administration, reception, sanitation and kitchen work of the project department.
2, do a good job in the daily reception of the project department, set up a good image.
3. Do a good job of sending and receiving correspondence documents from the project department, and establish a perfect account for sending and receiving documents.
4, do a good job in the health of the project department, regular or irregular inspection, appraisal.
5. Do a good job in the management of office supplies in the project department, establish a ledger of recipients, and strictly implement the related system between the company and the project department.
6. Do a good job in the kitchen management of the project department to ensure the living supply of the employees of the project department.
7. Be responsible for the safety of the project department.
8, responsible for the project department personnel selection, training and other personnel management.
9, complete other work assigned by the leadership.
10, do a good job in the staff canteen, often change the pattern, and strive to improve the quality of food. Ensure the hot water and boiled water supply for employees to and from work.
1 1, responsible for the accommodation management of project staff, landscaping of staff dormitories and living quarters, and environmental protection of the project.
12, establish and improve the car use system and arrange the car use reasonably.
13, establish and improve the public security system on the construction site, maintain normal working order, strictly take various preventive measures, and supervise the implementation.
IV. Responsibilities of the Finance Department
1. Establish and improve the corresponding internal financial management system according to laws and regulations, financial accounting system and various rules and regulations of the project management department.
2. Strengthen the basic accounting work, strictly enforce the laws and regulations of implementation of accounting, and ensure the orderly accounting work.
3. Adhere to the principle of good faith.
4. Participate in reviewing the construction budget, urge relevant departments to provide quarterly (or monthly) cost analysis data of the completed project budget, and organize cost profit and loss accounting.
5. Strictly examine and approve the loan and project payment settlement business.
6. Register the general ledger account books in time, establish and improve the project account books, and keep abreast of the project price settlement and project payment.
7. Prepare monthly, quarterly and annual financial statements and final accounts, and provide real and perfect capital information to superiors in a timely manner.
8. Make cost plan, implement cost control, analyze monthly cost expenditure and report to relevant leaders.
9 overall arrangement, rational allocation of funds, optimize the allocation of funds.
10, regularly check the financial revenue and expenditure of each construction team (team) of the project department and the payment of wages for migrant workers, and correct them in time when problems are found.