2, special construction organization design (scheme) reported to the contractor, safety technical measures for examination and approval records.
3. The subcontractor shall be equipped with a full-time security officer with a valid license.
4, the subcontractor's (professional) safety emergency plan.
5. The subcontractor shall provide the general contractor with the roster, copies of ID cards and health certificates of all personnel entering the site, as well as mechanical equipment acceptance records and mechanical lists.
6, special construction organization design (scheme) including quality objectives and specific guarantee measures, as well as finished product protection measures, etc.