Supporting facilities of the project: bring your own kindergarten and bring your own 100 mu park. The greening of the project is as high as 60%, with its own game pool, basketball court and 200,000 square meters large commercial complex shopping center, cinema, catering, leisure and entertainment. Delivery time: 202130 September Qingshui.
Longhu property, broad vision, beautiful house and park green space.
Transportation advantage: The distance between the double subway station 13 line and Line 4 (Science Park Station) is about 400 meters. High-speed railway station is about 2km away from the project. The three-dimensional transportation networks of "three highs, four fasts and five tracks", such as Tianwendu Expressway, Chengwenqiong Expressway, Xinhua Avenue, Chengqingpu High-speed Railway and Guanghua Line 8, are seamlessly covered, and rail transit and road traffic are seamlessly connected to ensure the convenience of urban residents in the future. Line 23 (under planning), the bus stop w 19 at the entrance of the project can reach Wansheng subway station, and the subway and bus are seamlessly connected.