Commitment letter of engineering construction

In today's society, many places will use the letter of commitment, which is usually a contract that needs to be written, and its commitment must also be written. I believe many people will find it difficult to write a letter of commitment. The following are 9 engineering construction commitments I have collected, which are for reference only and I hope to help you.

Commitment letter of engineering construction 1 Dear xxx: (name of the tenderer)

We hereby declare that the project manager we intend to send to (project name, bid section) (hereinafter referred to as "this project") is not engaged in any construction project at this stage.

We guarantee that the above information is true and accurate, and we are willing to bear all legal consequences caused by our fraud in this respect.

Hereby promise

Bidder: (with company seal)

Legal representative or its entrusted agent: (signature)

Commitment: XXX

Time: XX, XX, XX, XX

Project Construction Commitment Letter 2 In order to ensure the construction safety of the interior decoration project of Wanbo Mall Phase II, Party B's construction contractor solemnly promises that he will be responsible for the safety management within the construction scope according to the construction contract. The basic contents of the commitment are as follows:

I promise that during the construction period, I will strictly follow the requirements of Henan Tiandi Decoration Engineering Co., Ltd. and the general contractor on site, clarify the safety responsibilities in accordance with relevant laws and regulations, do a good job in the construction organization design and technical disclosure of construction safety, and obey the daily management and inspection of relevant departments of the company.

Second, promise to carry out safety education for the construction personnel of this unit, have a sound safety management system and training and education records, and ensure that the construction personnel do not violate the company's safety regulations and national laws and regulations. Obey the supervision of Henan Tiandi Decoration Engineering Co., Ltd. and the site general contractor.

3. Devote to civilized construction, ensure that there are no fire safety accidents and industrial accidents at the site, set up a person in charge of on-site safety, explain the guarantee of construction fire safety work and the implementation of construction scheme to relevant departments of the company, and ensure the safety of construction personnel, the company and third-party personnel and property. In case of any accidents or casualties caused by construction, the constructor promises to take full responsibility, which has nothing to do with Henan Tiandi Decoration Engineering Co., Ltd. and the site general contractor.

Fourth, provide employees with labor protection articles that meet the national standards or industry standards, and supervise and educate them to wear and use them correctly according to regulations.

5. Promise that the construction personnel will consciously abide by the safety management regulations of Party A.. If man-made unsafe behavior endangers personal and property safety, it must be rectified unconditionally and immediately, accept the inspection and supervision of the functional departments of Party A's company, and resolutely rectify the problems in the Notice of Non-conformance Rectification issued by relevant departments of the company.

Six, the company's safety supervision personnel found that there are major unsafe factors, at any time have the right to ask the construction party to stop work for rectification, and the construction party shall not continue to force construction in violation of regulations.

Seven, this letter of commitment is the effective proof of Henan Tiandi Decoration Engineering Co., Ltd. and the on-site contractor's external construction safety supervision, which is an annex to the contract and has legal effect. If the commitment party violates it, it shall be handled according to the third opinion.

Eight. Security issues include but are not limited to the above. For matters not covered, refer to national laws and regulations and the terms of this undertaking.

This undertaking is made in triplicate. (The company keeps one copy, the project department of the company keeps one copy and the contractor keeps one copy. After the construction is completed, the contractor will take this letter of commitment as the settlement voucher. )

Contractor: ID number:

Person in charge of the site: ID number:

Date: Date:

Tel: Tel:

Project Construction Commitment Chapter III Party A: xxx

Party b: xxx

Through negotiation between Party A and Party B, Party A will clear the single project of this project to Party B for construction in the form of labor service package. In order to ensure the project quality, construction period, safe and civilized construction and establish a good image of the construction unit, Party B promises to Party A's project department as follows:

First, obey the unified command of the project department, carry out orderly construction in strict accordance with the requirements of construction drawings and national construction specifications, and the project department will formulate sub-projects to ensure completion, and will be punished voluntarily if it fails to meet the requirements.

2. In the process of construction, if the construction personnel do not meet the requirements, Party A's technicians will correct them twice and the project department will study and replace Party B's construction team, and Party B will withdraw unconditionally. After the evacuation, Party A will pay 70% of the contract unit price to the workers according to the quantities completed by Party B. ..

Three. Party B shall manage its own construction personnel, do a good job in civilized construction and safe construction, and take good care of all mechanical equipment, facilities and turnover materials of Party A's project. Don't damage, steal or waste. If Party A's management personnel find the above-mentioned undesirable phenomena, Party B will voluntarily accept a fine of RMB 3,000, in addition to holding the parties accountable.

Four. During the construction period, Party B shall reasonably use the equipment provided by Party A, tidy and clean it after work, put it back in its original place and pile it up neatly. Cut off water and power supply to prevent rain, leakage, loss and danger. If the above requirements cannot be met immediately every day, Party A will arrange personnel to handle them, and the expenses incurred shall be borne by Party B. ..

Five, dormitory, kitchen, toilet cleaning every day, to prevent the epidemic. Employees' belongings should be placed neatly and kept clean and tidy. If it does not meet the requirements, Party A will send someone to clean it up, and the expenses will be borne by Party B. ..

6. If Party B temporarily invites runners, they will voluntarily accept exit inspection after work, and the vehicles will be parked in the designated place in an orderly manner.

Seven, to all the construction personnel entering the site to do a good job before and after the safety education. When entering the construction site, you must wear safety helmet correctly and be familiar with various operating procedures. In case of violation, Party B voluntarily accepts the punishment.

Eight. Duration Schedule: (Effective Duration)

1, basis

2, the basement:

3, a layer of structure:

4, the second floor and above:

5, plumbers, scaffolder crossover operation, full cooperation.

Nine, rewards and punishments regulations

1, the construction period is advanced and postponed for half a day, and the rewards and punishments are calculated cumulatively.

2. Those who don't wear safety helmet and slippers will be fined RMB each time.

3. The structure is capped, and the project department organizes each building number to use * * *, and the quality and time limit for a project are up to standard, and the worst penalty is RMB.

4. Concrete leakage, honeycomb and formwork running were found, and a severe fine was imposed from 500 yuan to 500 yuan.

5. Anyone who does homework after drinking or makes trouble because of drinking will be fined 500 yuan.

Person in charge of Party A (signature and seal):

date month year

Party B promises (signature and seal):

date month year

Project construction commitment Article 4 During the construction of xxx, our construction team solemnly promises to xxx Company as follows:

1. Ensure that, according to your company's requirements, the rights and obligations stipulated in the contract will be earnestly fulfilled, a capable construction team will be put into use, equipped with good construction machinery and vehicles, and engineering and technical personnel with good work style, fine skills and rich practical experience will be arranged for management and coordination, and the on-site supervision work appointed by the owner and the company will be cooperated and obeyed, so as to ensure that the project can complete all construction tasks within the time limit stipulated in the contract.

2. We promise to carry out the construction according to the relevant date stipulated in the contract, and agree that 2% of the project cost will be deducted as liquidated damages for delay for every day when the completion date is delayed. If the user has reason to complain because of the delay in the construction period, we promise to punish 1000 yuan each time (except for force majeure factors and the owner's reasons), and analyze the reasons and learn lessons.

3. Our construction team promises that the engineering quality will meet the specification requirements in the ministerial standards and the relevant regulations of the company, ensure that the line engineering qualification rate reaches 100%, and strive to achieve an excellent and good rate of 75%. If the construction quality fails to meet the design and construction standards stipulated in the contract, a fine of 1% of the total project cost shall be imposed, and the rework shall meet the acceptance standards within the specified working days, and all responsibilities for rework shall be borne.

4. In the process of engineering construction, our construction team will implement the safety guarantee system, conduct self-examination and self-correction, ensure the safety of construction personnel, vehicles and construction equipment, ensure that construction materials are not wasted or lost, and ensure the safety of other facilities. If the materials are inconsistent with the actual materials, resulting in the expenses being deducted by the owner, or the demolished materials are inconsistent with the actual situation, the construction team promises to compensate according to the actual situation.

5. Promise to obey the arrangement and scheduling of the owner and the company, and never shirk the construction tasks arranged by the owner. Handle all kinds of relationships between the construction site and the construction process.

6. Promise to carefully write the construction organization plan after receiving the construction task, submit the construction progress to the company on time, and provide a report on the construction progress and specific conditions of the project every 10 day, otherwise 200 yuan will be fined every time.

7. Promise not to lend, lease or sell the qualification and business license of your own company. Without the consent of the company, you shall not do anything beyond the scope of authorization in the name of your company. In case of the above acts, he is willing to bear a fine of 5000- 10000 yuan and bear corresponding legal responsibilities.

8. This letter of commitment has the same legal status as the subcontract agreement. My personal commitment.

Company name:

Date:

Project construction commitment Article 5 Our company is responsible for the project construction undertaken by our company in my name, and hereby promises as follows:

1. We will complete the project bidding, settlement, completion and all the work during the project warranty period, and bear all the expenses incurred during the period.

2. All expenses (including industrial accidents) incurred by us in the construction process shall be borne and repaid by us, and have nothing to do with your company.

We will never owe all expenses such as materials, machinery and equipment in the name of your company. If it happens, we will bear the economic and legal responsibilities (deducted from the deposit), which has nothing to do with your company.

We promise not to default the wages of migrant workers. In case of breach of contract, all legal, civil and economic responsibilities shall be borne by us, which has nothing to do with your company.

5. During the construction period, we were accused and punished by the owner and the administrative department for the quality, safety and civilized construction of the project, and we took full responsibility, which has nothing to do with your company.

6. We promise that there will be no safety accidents, otherwise all economic, civil and legal responsibilities will be borne by us, which has nothing to do with your company.

7. Consciously implement the company's safety instrument management measures. See attached table.

8. Voluntary implementation of the company's industrial injury insurance.

9. Voluntary performance of all terms and contents of the project cooperation agreement.

Commitment: attachment: 65438+ 0 copies of ID card.

Badian construction and installation co., ltd

Safety management agreement of electric power construction project

(SAQBl-4 Power Transmission and Transformation Project-Line and Substation Installation Services)

Project name:

Signing place:

Signing time: year month day

Safety Agreement for Labor Subcontracting of Electric Power Construction Project

SAQBl-4 Power Transmission and Transformation Project-Line (or Installation) Engineering Services

Contract awarding unit: hereinafter referred to as Party A's contractor: hereinafter referred to as Party B. In order to implement the safety production policy of "safety first, prevention first and comprehensive treatment", clarify the safety responsibilities of both contractors, improve the management level of safe and civilized construction on the construction site, and ensure the safety and health of the construction personnel, both parties signed the engineering labor subcontracting contract through consultation in accordance with relevant national laws and regulations and relevant regulations of State Grid Corporation of China on safe and civilized construction, combined with the characteristics of this project.

I. Contracted projects

1. Project name:

2. Project address:

3. Scope of contract:

4. Form of contract: labor subcontracting

5. Project contract number:

6. Construction period: from year to year (in case of any change, the actual power transmission time of the project shall be taken as the deadline of the project contract).

Second, the content of the agreement

1. Safe and civilized construction goal

(1) No minor injuries or personal accidents will occur.

(2) No mechanical, equipment or fire accidents, no traffic accidents and environmental impact events with equal or above responsibilities will occur.

(3) No power grid and equipment accidents caused by engineering construction and manual operation.

(4) Meet the requirements of site safety and civilized construction proposed by Party A. ..

2. The main laws, regulations, rules, norms and standard systems for the implementation of this project include but are not limited to:

(1) Law of People's Republic of China (PRC) on Work Safety.

(2) Regulations of the State Council on Safety Management of Construction Projects.

(3) Regulations of the State Council on Reporting, Investigation and Handling of Production Safety Accidents.

(4) National Development and Reform Commission's Work Rules for Electric Power Construction Safety (DL5009.2, DL5009.3).

(5) Relevant safety regulations of national ministries and commissions.

(6) Regulations of State Grid Corporation on Safety, Health and Environment Management of Electric Power Construction.

(7) Regulations on Power Safety of State Grid Corporation.

(8) Rules and regulations of State Grid Corporation on safe and civilized construction.

(9) Local safety and environmental laws and regulations to which the construction project belongs.

(10) Rules and regulations of the owner's project department and general contractor on safe and civilized construction.

3. Rights and obligations of Party A and Party B in respect of safe and civilized construction.

(1) Seriously implement the national, local and State Grid Corporation's guidelines, policies, laws, regulations, rules and standards related to production safety, implement the management systems and regulations of the owner's project department and Party A (general contractor or professional contractor) related to production safety, and earnestly fulfill the management responsibilities of safe and civilized construction and environmental protection related to this agreement.

(2) For subcontracted projects, according to the principle of "labor subcontracting contract and safety agreement shall be signed before construction starts", both parties shall not start construction in advance for any reason before signing the subcontracting contract and safety agreement.

Commitment of engineering construction Article 6 In order to effectively prevent and eliminate all kinds of unsafe factors in engineering construction, our company makes the following commitments to the construction project of Qingzhen New Campus of Guizhou Communications Vocational and Technical College:

First, make sure to set up construction safety (warning) signs at the eye-catching position of the entrance and exit of the construction site. Eye-catching warning signs should be set up in key places and key parts of safety management in engineering construction.

Second, formulate construction safety management organization and safety management responsibility system, equip full-time and part-time safety officers for engineering construction projects, and earnestly implement various construction safety management regulations.

Three, all engineering construction workers must go through safety education and technical operation training, special type of work workers must have the corresponding technical qualification certificate.

Four, all kinds of auxiliary materials (equipment) needed in the construction should have the product certificate, the installation and use of auxiliary equipment should comply with the safety management regulations, and strictly implement the safety operation procedures.

Five, to ensure the safety of capital investment, to meet the conditions of safe production, to provide employees with labor protection articles in line with national standards or industry standards, and to urge them to wear and use according to regulations.

Six, in accordance with the requirements of relevant national laws and regulations and relevant national or industrial safety standards and norms, formulate preventive measures to ensure that all links meet safety requirements, implement emergency measures for operating posts, and formulate emergency rescue plans and safety precautions for production safety accidents according to law.

Seven. In case of any safety accident during construction, our company is willing to bear corresponding responsibilities.

Name of unit (seal): legal representative (signature):

Project manager (signature): full-time safety officer (signature):

date month year

Once we win the bid, we promise to use our own (or rented) equipment in the project construction, as follows:

The catalogue of self-supplied (or self-rented) equipment is as follows:

We make the following commitments to all problems caused by self-provided (or self-rented) equipment during the project:

First of all, our own (or rented) equipment must be qualified products and must meet the relevant national standards.

Technical quality standards and relevant national safety standards.

2. Before construction, we are responsible for providing the manufacturer's qualification, factory certificate, test report and other relevant documents of our own (or self-rented) equipment, such as providing the relevant qualification of the leasing unit and the lease contract or agreement of self-rented equipment; We are responsible for providing professional equipment operators with identity certificates, employment certificates and relevant certificates of equipment operation.

Three, own (or rented) equipment must be fully functional, complete accessories, can be used normally, trouble-free and potential safety hazards, and the safety protection facilities required by national or local regulations must be complete; Professional operators must be healthy and have no diseases or physical defects that can affect normal operation and use.

4. We are responsible for the coordination, transportation, installation, debugging and daily maintenance of our own (or rented) equipment.

Regular maintenance work, the use of equipment must meet the requirements of relevant national and local laws and regulations; We are responsible for educating the operators who bring their own (or rent) equipment about operating procedures and safety in production. Equipment safety operation regulations and safety production warning signs must be hung in the equipment use place. All expenses arising from the above work will be borne by us.

5. When using our own (or rented) equipment, we must meet the requirements of the mechanical equipment safety management system in the annex.

Commitment: (official seal)

Legal person (or customer):

Date, year and month

Commitment letter of engineering construction 8 In order to ensure the smooth implementation of the project, realize safe and civilized construction and ensure the quality of the project, we solemnly make the following commitments:

1, comply with relevant safety regulations, and construct according to the quality acceptance standard proposed by the supervision unit entrusted by Party A;

2. Before construction, organize construction personnel to learn relevant safety laws and regulations, and take safety protection measures during construction to prevent safety accidents. Our company is responsible for safety accidents such as communication, traffic and personal injury caused by improper construction;

3. Take care of all kinds of facilities on the construction site and do not damage other road facilities. If there is any damage, the company will be responsible for compensation; Our company is responsible for disputes or compensation caused by the construction scope exceeding the route;

4. During the construction period, the person in charge of our unit or site management personnel will supervise the construction at the site; 5, construction materials piled up, shall not occupy the fire escape and public places, construction waste, waste to clean away, tidy up the scene after installation;

6, actively cooperate with the highway management department and supervision unit to do a good job of safety inspection.

Commitment unit:

Contact person:

Time: 20xx MM DD YY

Commitment letter of engineering construction 9. First, pre-sales service

1. Send a Commissioner to introduce the implementation standards of crane industry at home and abroad to users, introduce the product characteristics and general situation of our factory, and choose high quality for users.

Cheap products and provide decision-making materials.

2, technical solutions, send professional and technical personnel, business personnel for technical exchanges, business disclosure. You can organize your company's personnel to visit the factory for guidance. Provide product performance, characteristics, scheme design drawings and various parameters in time before and after the whole bidding process, and actively cooperate with your company.

Choose a satisfactory product manufacturer. Even if our products are not selected due to other factors, our factory is willing to provide your company with technical consultation for this project, so that your company can purchase products with advanced technology, reasonable price and reliable performance.

Second, selling services.

1. In terms of technical design, our factory optimizes the design and strives for perfection. We work closely with the design institute and your company to ensure the smooth development of the design work, and actively listen to the requirements of on-site operators to improve the design. If the design institute needs to be changed and users have special needs, our factory will try its best to meet their requirements and try its best to coordinate the cooperative relationship with all parties.

2. Choose the best parts manufacturer in China, which not only meets the performance requirements, but also facilitates future maintenance and parts supply.

3. In the manufacturing process, we fully cooperate to arrange the work of drawing review, product supervision, inspection and acceptance, so that the products can be completed before shipment.

All the work can be carried out in an orderly way.

Third, after-sales service.

1. When the product is delivered to the user, our factory will send a special person to open the box for inspection with the relevant personnel of your company.

2. In the process of equipment installation and debugging, our factory sent senior engineers with rich field experience to the site to guide the installation and debugging free of charge to ensure the normal and smooth operation of the products.

3, free training crane drivers and crane maintenance personnel, and establish contact with maintenance personnel, in terms of maintenance and use, do long skills.

Surgical support. During the use of the crane in your company, it provides 24-hour maintenance to ensure the use requirements of users.

4. Supply spare parts in time to ensure customer satisfaction.

(1) timely reflect the needs of users;

(2) Provide products with high quality and low price, and ensure timely delivery;

(3) Strictly control product quality;

(4) Proper packaging to prevent omission and damage.

Person in charge of commitment unit:

Technical director: