operation sequence/order
1. Cleanliness: Before running the plastic runway, the site must be kept clean. Cleaning work includes removing debris, dust and residues from the site. Clean with cleaning tools to ensure that the surface of the site is clean and tidy.
2. Layout: Layout according to the size and shape of the site. When making the layout, it needs to be adjusted according to the actual situation to ensure the rationality and aesthetics of the layout.
3. Painting: After the layout is completed, painting is needed. Painting requires the use of professional pigments and tools to ensure the quality and effect of painting. After the paint is finished, it needs to be dried to ensure that the paint is fully dry.
4. Inspection: After painting is completed, inspection is required. The contents of the inspection include the smoothness of the site, the quality of the coating and the effect of the coating. If problems are found, they need to be fixed in time.
profit
1. Improve sports experience: The new national standard plastic track has the characteristics of elasticity, wear resistance and non-slip, which can effectively reduce the impact of sports on joints and improve the comfort and safety of sports.
2. Ensure health and safety: The new national standard plastic track is made of environmentally friendly materials, which does not contain harmful substances and is harmless to human health. At the same time, its anti-skid, waterproof, fireproof and other characteristics can also effectively ensure sports safety.
3. Save maintenance cost: The new national standard plastic track has the characteristics of wear resistance, corrosion resistance, weather resistance, long service life and low maintenance cost. At the same time, its characteristics of easy cleaning and maintenance can also save maintenance costs.
final result