1, house inspection is a hard and complicated project, and the preparatory work before construction must be in place, so house inspection is handy. There must be a house purchase contract, and there are many attachments in the contract that are of great significance to the acceptance of the renovated house, such as the distribution map of the community and the agreed rules.
2. The drawing of the size of the house should be prepared before the house acceptance, not only the floor plan of the house, but also the drawings of the circuit and waterway should be complete.
3. Before the house is accepted, you should take the keys. There are many keys, including the floor keys, door keys, water meters and electricity meters. Be careful not to leave them out.
4. The confirmation sheet of decoration materials is also essential for acceptance, which records the brand, style and model of materials and needs to be checked when accepting the fully decorated house. What should be paid attention to in house inspection is the principle to be adhered to: as long as problems are found, no matter how big or small, they should be recorded in relevant documents or forms. It's easy to forget if you don't write it down with a pen. There are problems that need to be rectified by developers, and how to deal with them should be made clear in person.