Can Wenxian Yellow River Bridge pass during the epidemic? March 26th, 2022
According to relevant information, the query shows: Yes. According to the epidemic prevention and control requirements of Wenxian Yellow River Bridge, it can be unsealed on March 20, 2022. After the Yellow River Bridge in Wenxian County is unsealed, checkpoints should be set up, and foreign vehicles are not allowed to enter. Need to take temperature, check health code and 48-hour nucleic acid test report.