Model essay on personal work summary of electric power engineer 1
Time flies, I graduated from _ _ University in June, 2065438+0 _, and started working in _ _ company in July, 2065438+0 _. 201_ year11has been working for one year. In this short period of more than a year, I have not only deepened my understanding of what I have learned, but also gained a better understanding of what I have not touched or touched very little in books before. Since my work, I have made great progress and gained a lot through my own efforts under the training and guidance of the leaders, whether I am studying or working. The work is summarized as follows:
In study, since I joined the work, I have been strict with myself, taking my work seriously and trying to improve my ability. At this point, the company gave me good conditions: a large number of practical engineering cases really have a good guiding role for our graduates who just worked; There are also a wealth of books and materials, which can give me a good opportunity to broaden my knowledge and get information and understanding of the development and changes of the industry in time. The design institute also has a positive working environment and a high-quality staff team, which can inspire me to keep learning, surpass myself and improve my self-cultivation.
In my work, I listen to my experience carefully, record it carefully, and gain new experience from every engineering design project. I devote myself seriously, study hard, pay attention to learning in my work, learn and master new technologies, new knowledge, new standards and new norms in time, and apply them to my work. I persist in studying according to my work needs and apply my learned technologies and knowledge to my practical work, so as to improve my professional level and have strong professional work ability. Can learn from engineers and technicians with an open mind according to work needs, and adhere to the principle of combining theory with practice.
The first project I took part in was _ _ design. In this project, I am familiar with the basic process of project design, learned the usage of electrical design software EES, and applied the cad skills I learned in school to practical work, and learned a lot of practical experience. The second project is the design of _ _. In this project, I know how to communicate with Party A and deal with problems encountered in design. Under the guidance of chief electrical engineer and communication with senior staff, my professional knowledge and skills have been greatly improved. Later, I also participated in the design of _ _, _ _, _ _ and other projects. During this period, I paid a lot and gained a lot. After more than a year's work and study, I feel that as an engineering technician, I must be careful, do every step well, be familiar with the design process, drawings and specifications, continue to learn the knowledge related to design and specialty, arm myself with knowledge, learn to communicate with people at work, how to be a man, and establish a correct attitude.
With the development of society, people have higher and higher requirements for design quality. Quality is the solid foundation for the survival and development of enterprises. The improvement of quality depends on the overall quality of employees and the improvement of technical management level. In order to face more fierce competition, it is the focus of the company's work to cultivate high-quality, high-level professional technical and management talents. In the past year's work, with the care of leaders and the support and help of colleagues, through continuous efforts, I have adapted to the pace of work and have certain technical work ability, but there are still some shortcomings. In my future work, I will strengthen my study, overcome my shortcomings and strive to continuously improve my professional and technical level. At the same time, I clearly realize that in order to adapt to the new situation of electrical design, I need to constantly strengthen theoretical study, especially the study of new technologies and theories.
Model essay on personal work summary of electric power engineer II
I joined the work on 1996. I have been engaged in electricity meter calibration and electricity inspection, and now I am the deputy director of the operation department, responsible for line loss management, measurement management and electricity inspection. In several years of practical work, the professional and technical level has been significantly improved by studying with an open mind, exercising hard and combining book knowledge with practical work. Now I will report my personal work.
First, strengthen the management of standard equipment to ensure the accuracy of value transmission. We often say that the electric meter is the "weighing beam" in the business activities of electric power enterprises, and the standard measuring equipment is a tool for calibrating the "weighing beam", which is of extraordinary importance to electric power enterprises. Our bureau has 19 sets of standard equipment. In order to ensure the stable and healthy operation of these equipment, I presided over the establishment of a standardized accounting of measuring equipment, clearly defined the management of special personnel, and sent them for inspection regularly to avoid overdue service. For the portable single-phase watt-hour meter calibration table with unstable performance, we maintain it once a year by the manufacturer, and compare it with other standards irregularly, so as to solve the problem in time and avoid serious consequences. In, we sent 65,438+02 sets of standard equipment for inspection. Due to the work in place and effective measures, the qualified rate of inspection reached 100%, which was well received by the leaders of the Institute of Electric Power.
Second, do a good job in meter management and safeguard the legitimate rights and interests of both parties. Through business investigation, we have established an electric meter account and brought the electric meter into standardized management. We have determined the work flow of electricity meter verification, and the account is dynamically managed by a special person to ensure that the account is consistent with the fact. Before instrument calibration, check the accounts and register the work records. During the calibration process, the microcomputer will automatically record the error data, and after the calibration, a special person will change the meter account. If it is necessary to replace the electric meter, a replacement record of the metering device shall be issued, and a report on the amount of electricity returned by the metering device shall be issued according to the actual situation. The consequences of this effectively curb the bad behavior of individuals who make an issue of electricity meters and seek personal gain. In order to ensure the quality of meter calibration, we implement the lifelong responsibility system for meter calibration. As long as it is determined that the unqualified error is artificially adjusted, no matter how long it takes, the verifier should be held accountable and will not be tolerated. In _ _ _ *, 474 ammeters and 48 current transformers were inspected, exceeding the planned task by 56.7%, which provided technical support for global loss reduction and energy saving.
Third, pay close attention to bus balance management and eliminate the blind spot of line loss management. Generally speaking, line loss consists of high-voltage line loss and low-voltage line loss, both of which have strict assessment systems and are widely valued; Bus balance between high and low voltage line losses is easily overlooked. In fact, bus balance can not be ignored. For example, our bureau completed the power supply of 299.7 million kWh in the whole year. If the global bus balance rate rises from 0.5% to 1%, the overall annual power loss will be 1.49 million kWh. The balance rate of bus mainly depends on the accuracy of metering device.
In order to ensure the accuracy of the measuring devices in the station, we replaced all the measuring instruments in the station with multifunctional electronic instruments in July, and checked them on site once every quarter according to the measurement regulations to ensure the stable operation of the instruments. Through this work, the bus balance rate has been greatly reduced, and the balance rate of Mibei and Bandong Station has been reduced from more than 1.5% to less than 0.5%, and the effect is particularly obvious. In order to know the balance situation in the station timely and accurately, we assign special personnel to pay attention to the balance situation of each station every day and check it once a week. As long as the balance rate of a station exceeds 0.5% for two consecutive days, we will immediately rush to the scene to find out the reason. For metering faults reported by each station, we guarantee that personnel will be in place within 12 hours to solve the problem as quickly as possible. In _ _ _ _ _ _, we replaced 46 meters, conducted on-site inspections 146 times, and handled three meter failures in the station to ensure that the overall bus balance rate was within 0.5% throughout the year. In order to achieve the power supply target and ensure economic benefits, we set out early in the morning to replace the electronic watch and try to work during the low power consumption period. This is the first "zero point project" of our bureau.
Fourth, pay attention to on-site management and fully cooperate with the loss reduction work. On-site management includes positioning, acceptance and various forms of on-site investigation. Every positioning or acceptance, I ask team members to be serious and responsible, not limited to taking notes, to really participate, and to strictly control. In September, 2000, during the acceptance of Bao Si Leather Plastic Co., Ltd. 1000kva expansion project, we carefully checked the wiring, found the measurement wiring error of the manufacturer, and prevented a serious measurement accident. For other field work, whether it is a general survey of electricity consumption, a key survey of some lines and substations, or a survey of the load of public distribution transformers, I insist on seeking truth from facts, and strive to investigate the real first-hand information clearly, so as to provide a reliable basis for leadership decision-making. In addition, I also regard field research as a rare opportunity for me to go deep into the grassroots and get in touch with the front line. Through on-the-spot investigation, we can solve practical problems for comrades in power supply stations, enrich our own experience and supplement our own knowledge. In _ _ years, 30 lines and 8 stations were investigated, and 1 1 misconnections were corrected.
5. Optimize reactive power configuration to provide technical support for loss reduction. Reactive power management is an important link in line loss management. For reactive power management, I am not satisfied with reporting several forms and filling in a few figures in the power supply station, but devoted myself to this work. On the one hand, I have visited Beisha, Dongyang, Dabucun and other places for many times, starting with correcting the wiring of reactive power meters, helping power supply personnel to measure the reactive power of users, determine the reactive power compensation scheme for users, and check the reactive power compensation effect; On the other hand, access to relevant information, understand the dynamics of reactive power compensation, constantly replenish our minds, and seek practical working methods of reactive power compensation in our bureau. Through unremitting efforts, comrades in power supply stations and many power users have continuously improved their understanding of this work. Last year * * * reactive power compensation was nearly 1 10,000 kvar.
Other work of intransitive verbs has been completed. Over the past year, in addition to the above work, I also cooperated with other departments to complete the assessment of agricultural electricians and the inspection of pump station equipment in flood season, so I won't go into details. The above is my work in the past year. Although some achievements have been made, the shortcomings are also obvious. In the future, I will try my best to correct my own shortcomings, study professional and technical knowledge seriously, improve my personal quality, and lay a good foundation for the smooth completion of various tasks.
Summary of three people's work of power engineer Fan Wen
I graduated from _ _ _ _ University with a bachelor's degree. Worked in _ _ _ from June to 10 in 438, and worked in _ _ unit successively. Time flies. In the past few years, I have not only deepened my understanding of the original knowledge, but also got a better understanding of the knowledge that I didn't touch or didn't touch deeply in the previous books. Since my work, I have made great progress and gained a lot in my thought, study and work under the careful training and teaching of the unit leaders and through my continuous efforts. The professional and technical work in recent years is reported as follows:
First, political thought:
Second, professional learning:
From the work in recent years, I deeply realized that the technical work of radio and television transmission and safe broadcasting is trivial and arduous, and every link can't be slack. In the process of work, I keep learning and reflecting, making progress in learning and growing up in reflection, so that I can become an excellent technical backbone one day in the future. Clear work purpose, correct attitude, study business and work hard. Love your career, unite with colleagues, ask for advice modestly, and observe labor discipline. Participate in various activities organized by the unit, strengthen the cultivation and improvement of their own quality, and start from themselves. The particularity of the profession of engineer determines the inevitability of our "people-oriented, safety first".
During my work, through heart-to-heart talks and exchanges with leaders and colleagues, I gradually learned about the transmission and launch center. Secondly, under the leadership of the leadership, I have been studying various rules and regulations and professional books, and at the same time, I have changed from my initial inferiority and worry about my work to my confidence in my work, and I have been constantly cultivating my enthusiasm and initiative in my work. During the operation, I followed my colleagues in the computer room to learn how to turn on and off the machine, what matters should be paid attention to, and how to control the machine in the process of turning on and off the machine. Under the leadership of my colleagues, I slowly began to learn some simple operations, such as switching signals, the objects to be monitored in the process of switching signals, the normal running state of equipment, how to judge the transmitter failure and how to deal with it. Every time I operate, my colleagues will ask me questions and try to learn a simple operation every eight hours. During the duty, we must make accident prediction, master the current situation of equipment and strengthen the monitoring of defective equipment.
Since entering the Department of _ _, the center has provided us with a good learning environment through various channels. From the initial induction training, to the professional knowledge training arranged by the team every week, and the monthly departmental examination training, when the factory representatives came to assist in the work, the leaders also seized the opportunity and invited the factory technicians to tell us all kinds of professional knowledge. In the process of continuous training, each of us has gained a lot. Today, with the rapid development of science and technology and increasingly fierce competition, I personally realize that only by constantly learning new knowledge, mastering new skills and constantly improving my professional level and work skills can I meet the needs of my work and adapt to the development of society.
In the course of my work, I will constantly learn from my experienced colleagues skills or techniques that I have never really mastered, and apply them. I will also collect and sort out some information during my work and turn it into information for future use. In my spare time, I read some professional books and websites to learn and master some advanced professional and technical knowledge. I also read some management books or other websites to learn all kinds of knowledge and improve my comprehensive ability. In my future work, I will improve my quality through continuous study and practice, so that my progress can keep up with the development of society and meet the needs of my work. At the same time, I can be proactive, hardworking and conscientious in my work. Treat all tasks with the right attitude and love your work. Have a strong sense of responsibility, earnestly abide by the rules and regulations of the center, and strive to improve the efficiency and quality of the personal summary work of its assistant engineers.
After several years' employment, I deeply realized the importance of changing working ideas and repositioning, completing communication, making up for deficiencies, improving my ability and perfecting myself, and striving to grow into a qualified and high-quality employee.
The above is a summary of my professional and technical work since I joined the work. By combining theory with practice and summing up my own experience, I have been able to do my job well and complete various tasks. In the future work, I will continue to consolidate and improve my professional knowledge and professional level, and further do my job well.
Summary of four people's work of power engineer Fan Wen
First of all, I would like to thank the company leaders for giving me this precious opportunity to work in our motorcycle and motorcycle business center project. At the same time, I sincerely thank my colleagues for their selfless help to my work during this time. In the past 20__ years, I have been working actively under the guidance of company leaders. The current work is summarized as follows:
At this time, A has not been capped, and the work of board surface and laying piping is progressing with the progress. The main works in Area B and Area C are completed, and the installation engineering related majors and the main body and wall works are carried out normally.
During the daily on-site inspection, we found the following quality problems:
1, the embedded box of indoor switch socket is not standardized, the box is too deep, the height deviation is too large, and the inclination phenomenon is common.
2. The nursing work of embedded pipes is not in place, and the binding and arrangement of pipes do not meet the requirements. As a result, the embedded pipeline can't be hidden in the process of dredging and cleaning on site, and pipeline blockage occurs from time to time.
3. At the project site, the coordination between the participating units in the installation is not in place, the installation team is all managed by the contractor, and the contractor's project personnel are not perfect, causing many problems.
4. The technical strength of the construction unit is weak, the technical disclosure work is not in place, there are few people, the quality of completion is not high, and the sensory effect of molding is poor. Before the progress was basically normal, it was carried out with the progress of civil engineering. However, after the housing allocation is determined, the fire water and electricity, water supply and drainage, strong and weak electricity have all changed greatly. This part should be determined as soon as possible, and the construction should be carried out. Security;
1, temporary electricity layout basically meets the requirements of temporary electricity construction, but private connection is common, and on-site personnel management is not in place.
2. The management information of temporary electricity consumption is incomplete, and the construction unit has not carried out regular inspection on the electrical devices, mechanical equipment, tower cranes and other electrical equipment of the distribution box, and there is no inspection record and other relevant information.
To sum up, I think the above reasons and problems are mainly caused by the following reasons:
1, head of safety technology of the construction unit, with weak safety awareness and insufficient understanding of relevant specifications.
2. The technical person in charge of the construction unit is not familiar with the construction technology, and the on-site construction experience is not rich, and he doesn't know much about the requirements of relevant specifications, technologies and construction technology. 3. The technical director of the construction unit did not do a good job of technical disclosure of the labor team.
4. The relevant management personnel of the construction unit have a poor sense of responsibility and a weak sense of responsibility. 5. The phenomenon that the construction unit is entrusted by the contractor is outstanding, and the supervision of the head of the general contractor is not in place.
6. Supervisors have a weak sense of responsibility.
In view of the above problems, I will communicate with relevant personnel in the future. In order to effectively control the project quality and progress, I will take the following measures: 1. Actively communicate with supervisors and urge them to strengthen on-site supervision and management. 2, timely understand the progress of the construction site, at the same time actively communicate with each team related technical director, put forward guidance and rectification opinions; Responsible for supervising the follow-up and rectification and putting them in place one by one; Arrange the construction sequence of each professional process; Supervise the dynamic situation of on-site construction of the construction unit, so as to be aware of it and be in control; According to the drawings, relevant specifications and contract requirements, all incoming materials are required to be inspected in declare in advance before entering the site, and the quality of materials is strictly controlled, so as to prevent the phenomenon of shoddy materials, changing the brand of materials without permission and reducing the quality of materials. 3 Strengthen communication with supervision, project management and construction team, understand everyone's working ideas, standardize construction technology and flow, and try to avoid some rework in the later period.
While doing a good job in site management, the unreasonable part of the construction drawing was revised with the design unit; Completed the optimization of the original distribution drawings; Location determination of distribution room in Area B, construction of distribution room, determination of indoor high-voltage distribution scheme, drawing design and site construction guidance in the later period, etc. Correct the mistakes in outdoor hydropower drawings and determine the design scheme; Determine the change plan of fire protection specialty; Complete other tasks assigned by the leaders, and at the same time make preliminary contact with local functional departments such as water supply companies and power supply bureaus, and connect with the first-level development to access the relevant systems.
According to the 20__ year progress plan, this project must meet the requirements of completion and delivery within this year, and the later hydropower installation has a large workload and tight time. In the next 20__ years, in addition to the quality, progress and safety management of the construction site, I will conscientiously do a good job in the preliminary work of elevator engineering, power transformation and distribution engineering and intelligent weak current engineering in conjunction with manager Wang, the department leader, to create entry conditions for various system engineering; Strengthen the optimization of each system engineering, combine the actual functional requirements, comply with national laws and regulations, industry norms and standards, and try to control the construction cost; Actively cooperate and coordinate with the general contractor and subcontractor to ensure the smooth construction of each unit, control the construction cost for the company in management and create management benefits. At the same time, realize the completion of the delivery node and do your own service work well.
Summary of five people's work of electric power engineer Fan Wen
In June, 20__, I applied to work in _ _ Real Estate Development Co., Ltd. as a hydropower engineer and was assigned to _ _ Garden to be responsible for the management of the owner's hydropower project. Worked for a year and a half, and worked on the construction site for a year. Over the past year, with the support of the company leaders and the assistance of colleagues, the corresponding tasks have been basically completed smoothly, recognized and praised by the leaders, and a lot of new knowledge has been learned and some achievements have been made, but there is still a certain gap compared with the requirements of the leaders. During my work, I worked hard, was serious and responsible, and didn't dare to get tired. I work hard and have a good professional ethics and a strong sense of responsibility. Below I will make the following report on the work situation and hydropower project management experience in the past year.
Since I moved from the headquarters to the construction site on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Facing myself, I didn't flinch, actively solved the problem, actively asked the leaders for instructions, actively communicated with the design unit and the construction unit, and coordinated various relationships, so that the project went smoothly and accelerated the progress of the project.
In practical work, I took the time to familiarize myself with the drawings and related design materials, and optimized the drawings in combination with relevant specifications, actual situation on site and work experience. Because in the distribution system, the high-voltage and low-voltage drawings are designed by two design units, and the diameters of switches and bus cables do not correspond; The distribution metering box is not designed and installed in the public part of the low-voltage distribution diagram, which can not meet the requirements of the power supply department. Some cables are too large in diameter, resulting in waste. The diameter of some cables is too small to meet the requirements of use and specification, and there is a lack of connecting cables and contact wires from the generator distribution panel to the generator. There are contradictions in the elevation of basement drainage pipe, municipal small drainage pipe and municipal drainage pipe in the construction drawing. Because the science and technology road on the southwest side of the community has not been built, there is no municipal water supply and drainage pipeline, so the water supply and drainage pipeline of the whole community must be connected to the municipal pipeline on the west road, and so on. After communicating with design units, construction units and government departments, major problems were asked for instructions from civil engineering leaders and colleagues, and the existing problems were solved. In the field construction, long-term supervision is needed for important engineering parts and sub-projects that are prone to problems, such as: installation of drainage pipe sleeve on basement side wall, elevation measurement, installation of 1-4# first floor and municipal small drainage pipe, backfilling and layered compaction; The installation of embedded and concealed electrical lines, as well as the installation of related main switches and electrical boxes need to be supervised by the side station to ensure the construction quality. After a period of time, some achievements have been made, but the hydropower installation project is mainly civil work, which will inevitably be changed and modified in the future construction, which is also a problem that needs serious consideration and solution in the new year.
I have encountered many problems since I started construction. Due to the original mode of thinking and my lack of attention to construction electricity, there is a contradiction between professional units and general contracting units, and the distribution of electricity before the opening of the sales center is not parallel, which affects the office and is severely criticized. Let me realize my own shortcomings, but also give me a valuable lesson with facts.
In the management of hydropower projects, I received strong support from President Liu and other leaders and great assistance from my colleagues. I would like to express my heartfelt thanks to the leaders for their trust, support and help. I am confident that the hydropower project management of this project can be achieved. Therefore, in next year's work, we are prepared to strengthen from the following aspects:
1, broaden your knowledge, pay attention to the absorption of relevant knowledge in your work, and strengthen yourself from the aspects of civil engineering, decoration and project budget;
2. Do a good job of external coordination and actively communicate with design units, construction units and relevant government departments;
3. Adhere to three centers of gravity (quality, progress and cost) in the work;
4. Make the overall work plan, focusing on the interests of the company.
Power engineer's personal work summary essay related articles;
★ Model essay on personal work summary of electric power engineer assistant
★ The power engineer personally summarizes the excellent model essay.
★ Personal Work Summary of Electrical Assistant Engineer
★ Model essay on personal work summary of electrical engineers in 2020
★ Summarize the latest 5 essays on power engineering work.
★ Personal Work Summary of Electric Power Assistant Engineer (2)
★ Five essays summarizing the personal work of engineers.
★ 5 summaries of individual engineers' annual work in 2020.
★ Model essay on technical personal work summary of electrical engineer
★ Model essay on summary of professional and technical personal work of electrical engineer