Adoption of arbitration opinions

In 2022, the second-level constructor qualification examination will be held on June 1 1 day and 12 (that is, tomorrow and the day after tomorrow). In order to ensure that the majority of candidates take the exam safely and smoothly, Xiaomei's warm tips the day before the exam are as follows:

The second construction is organized by the provinces themselves, and the examination time in each province is different.

In 2022, the specific progress of each main body of the second construction project is as follows:

Jiangsu, Shaanxi, Chongqing, Guangdong, Huizhou, Qiong, Mongolia and Yunnan

Gansu, Ningxia, Sichuan, Hubei, Xinjiang, Zhejiang, Tibet, Jiangxi, Guangxi, Shandong, Liaoning, Hunan, Heilongjiang, Kyrgyzstan, Henan and Fujian.

Check it again at last, and be sure to bring:

1. certificate

Id card and admission ticket-put them in the stationery bag.

2. Stationery

Black pen (one for use and one for standby), 2B pencil (one for use and one for standby), eraser, ruler, pencil sharpener and calculator.

3. Epidemic prevention requirements

: masks, health codes, travel codes, negative nucleic acid reports, etc. Enter the examination room area in advance as required!

4. Route:

Be sure to define the examination room and estimate the route. If the distance is long or the traffic has to turn around, you can consider booking a hotel, and fast food restaurants near the examination room should also search in advance to solve the lunch problem. In short, you should twist your body to the end and make the best preparations!

Finally, to be clear, the answer strategy:

l

multiple-choice

(1) direct selection method:

That is, choose the right project directly and be familiar with the test center. This method can save time.

(2) indirect selection method:

That is, exclusion. If you can't see the correct answer right away, check the incorrect options one by one and finally choose the answer. Especially suitable for single questions.

(3) the feeling method:

Exclusion can't determine more than two answers, or even every answer can't be ruled out, so you can guess by feeling. Use carefully.

(4) Comparative method:

Words are not specialized or appear to be specialized. Through the analysis and comparison of answers and questions, find out some doorways, eliminate unreasonable options and guess the selected answers.

(5) cannon fodder answer method:

Let's talk about the formula first. Three long and one short are short, and three short and one long are long. Two things are long and two things are short, choose B, and the uneven C remains unchanged. This is a helpless move, and empty questions are not allowed.

l

multiple-choice question

There are five options for multiple-choice questions, and there are at least two or more options that best meet the meaning of the question, but no more than four. 1 item is selected incorrectly, and the question will get 0 point; If there is no mistake, but it is omitted, each option will get 0.5 points; If there is no wrong choice, all the choices are correct, and this question will get 2 points.

The score of public examination depends on the correct rate of multiple-choice questions, and the score of multiple-choice questions is twice that of single-choice questions. Note: Multiple choice questions must have at least two correct answers. If you are not sure about the third answer, don't choose it. Each multiple-choice question should not exceed 100 second. Choosing two is absolutely safe, and choosing three is gambling.

l

Case problem

(a) Find out the information features hidden in the case:

1 time: it will involve the construction period, schedule division, two-node network diagram, construction period claim and warranty responsibility period division;

2 Location: It will involve hazards and personal accidents caused by underground operation, aerial operation and cross operation, as well as related construction schemes;

Climate and environment: summer will involve high temperature (mass concrete), rainy, debris flow and lightning; Various problems caused by snow, frost and low temperature in winter;

4 people: managers at all levels, special operators, general contractors, owners, supervisors and government managers; Is the division of labor correct?

5. Contradictions: various problems in construction; This has caused so many "is it appropriate? Is that correct? Why? " .

(B) to master several common questions asked by cases:

1 Is it correct? (Two types: above or one) Why? What should I do to be right?

2. Documents, reports, records, etc. Comprehensive? Otherwise, please finish!

3 Are the measures formulated appropriate?

4 How to deal with the situations, events and accidents? Why?

5 ask questions directly? For example, the principle of price adjustment, control measures, time limit for a project calculation, pointing out the key route, etc.

(3) How should we answer:

1. After finding the question, only answer the key words, not other words.

2. Answer the questions by points.

3. Answer any questions. What is the quality problem? What rules have been violated? Why?

Answer three steps:

1 Answer correctly first.

2 two-step answer, first write (the error does not meet the specification), and then copy the background. If you don't know where the mistakes are, all the steps related to quality construction in the background are considered to be wrong. Copy the title, copy the background and list the mistakes in the background one by one. If it is wrong, it will not be deducted.

Answer the correct way in three steps (first write the correct way according to the specification). If you don't know the correct method, just answer all the steps in the background in reverse.

4. If the topic is clear about the basis and evidence, it must be written according to laws, regulations, design documents and standards.

5. If there is a problem, copy the background first. I don't remember, I wrote it from five aspects: man-machine material method.

6. If the topic is asked according to the characteristics, write out the characteristics and copy down the background.

If you answer the subjective questions neatly, you will probably get 1-3 points more. Experienced candidates must be deeply touched by this.

Finally, recite important shorthand formulas in various subjects:

l

operate

Shorthand formula 1: the working steps of demonstrating the overall progress goal of the construction project

1 investigation and data collection;

2. Analyze the project structure

3. Analyze the structure of the timetable system;

4. Determine the working code of the project;

5. Prepare progress plans at all levels (levels);

6. Coordinate the relationship between the schedules at all levels, and prepare the overall schedule;

7. If the overall progress plan is not in line with the project progress goal, try to adjust it;

8. Report to the project decision maker if the progress target cannot be achieved after many adjustments.

Double analysis and double calculation of formula. Structural analysis, first total and then divided; Schedule, divide first and then summarize.

Shorthand Formula 2: Workflow of Target Dynamic Control

1 Target decomposition to determine the planned value of target control.

2. Collect the actual value of the project objectives

3. Compare the planned value and actual value of the target on a regular basis.

If there is any deviation in the comparison, take corrective measures to correct it.

5 If necessary (the original goal is unreasonable or the original goal cannot be achieved), adjust the goal.

The formula jumps a few strokes.

l

laws and regulations

Shorthand formula 1: probation period of labor contract

If the term of the labor contract is more than 3 months but less than 1 year, the probation period shall not exceed 1 month; If the term of the labor contract is more than 1 year but less than 3 years, the probation period shall not exceed 2 months; The probation period of a labor contract with a fixed term of more than 3 years or without a fixed term shall not exceed 6 months. The same employee of the same employer can only agree on 1 probation period. A probation period may not be stipulated in a labor contract whose term is to complete certain tasks or whose term is less than 3 months. The probation period is included in the labor contract.

Formula 3 13@ 126 (contract period @ probation period)

Shorthand Formula 2: Adoption of Arbitration Opinions

Adoption of arbitration opinions: cases tried by a single arbitral tribunal shall be decided by a single arbitrator, and cases tried by a collegiate arbitral tribunal shall be decided collectively by three arbitrators. The award can also be made according to the opinions of the majority of arbitrators, and the different opinions of a few arbitrators can be recorded in the record or attached to the award, but the minority opinions do not constitute an integral part of the award. When the arbitration tribunal cannot form a majority opinion, it shall make it according to the opinion of the presiding arbitrator. The arbitration award shall be signed by the arbitrator and stamped with the seal of the Arbitration Commission. The arbitrator who disagrees with the award may or may not sign. The award shall take legal effect as of the date of making it.

The chief arbitrator of formula arbitration should not be half-hearted.

l

municipal authorities

Simplified formula 1: characteristics of inorganic binder stabilized soil

1 ranking of frost resistance and shrinkage resistance:

Lime-flyash soil base > cement-soil base > lime-soil base

2 Pre-strength ranking:

Cement soil foundation > lime soil foundation > lime soil foundation

3 water stability ranking:

Cement soil foundation > lime soil foundation

The formula of large lime in cement mainly depends on lime, which has large double resistance and low early strength.

Shorthand formula 2: Key points of pile sinking construction

In the process of pile sinking, the construction should be suspended and measures should be taken to deal with the following situations:

The permeability of 1 has changed greatly.

2 sudden inclination, displacement or serious rebound of the pile.

3 the pile head or pile body is damaged.

The ground bulged.

Five piles float on the body.

A peasant woman turned into a prostitute.

l

build

Shorthand formula 1: quality management of foundation engineering construction

Pile foundation engineering

1. Control of buried depth of cast-in-place pile;

(1) Friction pile, mainly based on elevation, with penetration as reference;

(2) The end bearing piles are mainly based on penetration, and the elevation is taken as reference.

The magic formula is one foot high.

Shorthand Formula 2: Construction Quality Management of Steel Structure Engineering

In any of the following circumstances, the steel shall be reinspected:

1) imported steel;

2) Mixed batch of steel bars;

3) Thick plate with thickness ≥40mm and designed according to Z-direction performance requirements;

4) The safety level of the building structure is Grade I, and the steel used as the main stress component in the long-span steel structure;

5) Design steel with reinspection requirements;

6) Steel with suspicious quality.

The imported mixed batch formula is Z-shaped, and the first-class span is in doubt.

l

electromechanical

Shorthand formula 1: unpacking inspection of equipment

(1) Case number, number of cases and packing conditions;

(2) The name, specification, model and important parts of the equipment shall be inspected and accepted according to the quality standards;

(3) Random technical documents (such as instructions, certificates, packing lists, etc.). ) and special tools;

(4) Whether there are defects, surface damage and corrosion;

(5) Other matters that need to be recorded.

Recipe submitted (package) to the agency (set) is heartbreaking (matching), lacking others.

Abbreviated Formula 2: General Procedure for Installation of Boiler Heating Surface

Check the equipment and its components → pass the test and cleaning → align and mark the header → butt weld the pipeline in place.

Find your opponent with a penalty.

l

highway

Shorthand formula 1: vertical drainage body

Construction process of bagged sand drain: leveling plain ground → laying lower sand cushion → tool positioning → driving casing → sand bag → pulling out casing → shifting tools → burying sand bag head → laying upper sand cushion.

The formula was originally sunk by the lower level, and it was overdone.

Construction process of plastic drainage board: leveling plain ground → laying lower sand cushion → placing machines and tools → putting plastic drainage board into shoes → inserting sleeves → pulling out sleeves → cutting plastic drainage board → moving machines and tools → laying upper sand cushion.

The formula is that the lower layer wears casing and arranges jeeps.

Shorthand formula 2: the "18-character" policy of underground excavation by bolting and shotcreting

1. Short excavation;

2. Diligent measurement;

3. Close quickly;

4. tube