First of all, in the construction and installation of the pedestal. It should be placed in a reasonable position and have a reasonable layout, which will be more standardized and reasonable.
Second, the preparation before equipment installation. Before installation, check the quality, such as looseness or leakage.
Thirdly, in the installation of equipment, it is necessary to check the appearance quality of each part of the host and auxiliary equipment at any time. There should be a special person in charge of the command at the installation site, and the operators should operate in an orderly manner as required. The most important thing is the division of labor and cooperation during installation to ensure the integrity, rationality and safety of equipment installation.
In short, only by doing the above can we effectively avoid the problems in the installation of domestic sewage treatment equipment.