Paper mill emergency plan for thunderstorms
In life, work and study, it is inevitable that some events will not occur in their own expectations, in order to control the development of the accident situation, often according to the specific circumstances of the pre-programmed emergency plan. Then prepare an emergency plan need to pay attention to what problems? The following is my organization of the paper mill emergency plan for thunderstorms, I hope to be able to help you.
1 1, preparations and safety precautions 1, in time to close the high and low voltage distribution room, transformer room, control room doors and windows. 2, check whether the emergency power supply is normal and sufficient. 3, check whether the lightning arrester is normal operation. 4, check whether the flood control equipment can be used normally, the pump wiring has no broken skin, whether the grounding wire is reliable and other safety hazards, spare flood control equipment can be put into operation in a timely manner. 5, prohibited in the outdoor high-voltage equipment and indoor introduction line maintenance and testing. 6, lightning weather is strictly prohibited reverse operation. 7, such as the occurrence of a serious threat to personal safety, may not wait for instructions to disconnect the power supply, but should be immediately reported to the scheduling and leadership, and make a record. 8, in the event of more than six winds and thunderstorms and other inclement weather, outdoor work should be stopped. 9, the upper and lower lines due to lightning blackout according to the emergency blackout contingency plan. 10, thunder and lightning to minimize the individual inspection of high-voltage and low-voltage electrical equipment, the need to inspect high-voltage equipment, are not allowed to carry out other maintenance work, are not allowed to move away from or over the fence. 11, thunder and lightning, not allowed to take shelter under the steel building, tall trees, not allowed to approach the lightning arrester and lightning rod. 12, thunder and lightning, not allowed in the open outdoor dialing and answering communication devices. 13, high-voltage equipment grounding, indoor personnel should be 4m away from the fault point, outdoor personnel should be 8m away from the fault point. Into the above range of personnel should wear insulated boots, contact equipment shell and frame, should wear insulated gloves. 14, encountered a thunderstorm, computer users should immediately cut off the computer power supply, and unplug the power plug and access to network equipment network cable plug. And unplug the connection line of the external equipment. 15, pay close attention to the computer and network system operation after the thunderstorm, such as power tripping and other power supply failure, affecting the normal operation of network equipment, information systems, should be contacted as soon as possible to the relevant departments of the power, network equipment repair, and make every effort to ensure that the network, communication safety and smooth. Second, the abnormal thunderstorm weather emergency response plan 1, abnormal thunderstorm concept: refers to the local or most of the area suddenly fell fog, heavy rain, a serious crisis of production and safe operation, there is a major personal injury, equipment damage accidents may occur. 2, the plant hazard level analysis: abnormal fog, heavy rain, thunder of the weather, resulting in part of the line tripped, high and low voltage into the water, cooling shed, finished product warehouse into the water combustion and explosion accidents. 2.1 Cooling shed: heavy rain due to sudden increase in water level, poor drainage, water flow people cooling shed caused by fire and explosion. 2.2 Finished goods warehouse: strictly prevent the rainstorm period, water into the finished goods warehouse, resulting in equipment damage and fire and explosion. 2.3 Cable trench: During heavy rainfall, water may enter, resulting in short-circuiting of cables and tripping of equipment. 2.4 Outdoor terminal box, control box: easy to cause misuse, refusal to move or short circuit. 2.5 gas cabinet: heavy rain may cause protection error, furnace gas leakage. 2.6 Communication system interruption. 3, the basic principles of emergency response 3.1 In order to timely, effective and rapid treatment of flooding due to heavy rainfall, waterlogging and other accidents, major equipment accidents, reduce the damage caused by major economic losses and impacts, the establishment of the rapid rescue and emergency response mechanism in case of accidents, to protect the lives of employees and property safety, and to maintain the normal order of production and work, the preparation of this plan. 3.2 This plan is in accordance with the "people-oriented, safety first, prevention-oriented" policy, 3.3 Organization and responsibilities 3.3.1 Emergency Leadership Group Leader: Peng Jiangwei Members: Wang Jinshan, He Zhong, Li Jinren, Lixin, Chen Hongqiang, Zhou Jiangming, Li Chao, Chen Hongqiang, Zhou Jiangming, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao, Li Chao and Li Chao. Chen Hongqiang Zhou Jiangming Li Chao Li Yu Song Xiuhe Zhang Gan Wang Yanqin Li Zhongyu Han Zhongsheng Wang Wei Teng Yongyue Huang Xiaoyan Yang Jianping Chai Fu Yang Deyong Zhang Yaoxin Li Lei Wang Feng Huang Kui Li Mang Zheng Ruilian Zhu Aihua Wang Yucheng Xue Pengtao Chang Xinrong Han Xiangjun Ren Jinhe Zoujirong Wang Jianxin Ma Wenlong Yin Pengpeng Jiao Bin 3.3.2 The company's main responsibilities of the emergency response to inclement weather leading group: (1) implement the higher level of the relevant regulations on emergency rescue and treatment of accidents. (2) Accept the leadership of the provincial company's emergency response leading group, and request the local government to provide emergency assistance for the company's emergency response work; (3) Unify the leadership of the company's emergency rescue and emergency response work; (4) Study the major emergency response decisions and deployments; (5) Declare the company to enter and lift the warning state; (6) Declare the company to enter and lift the warning state; (7) Declare the company to enter and lift the warning state. The company enters and lifts the state of early warning; (6) Declares that the company enters and lifts the state of emergency; (7) Decides to implement and terminate the emergency plan; (8) Releases relevant information. 3.4 Emergency Response Office 3.4.1 The Emergency Response Leadership Group has set up an office attached to the Department of Safety Management, responsible for the daily work. 3.4.2 The main responsibilities of the office: (1) implementation of the emergency leading group of the Ministry of the tasks; (2) supervision of the implementation of the emergency leading group of the emergency directives; (3) organization of the development of emergency plans, and supervise the implementation of the situation; (4) grasp of the emergency handling situation, and report major problems in the process of emergency response in a timely manner to the leading group. Report major problems in the emergency response process. 3.5 Emergency Response Specialized Working Groups 3.5.1 The Emergency Response Office consists of the Alert Evacuation Guidance Team, Technical Advisory Team, On-site Rescue Team, Logistic Support Team, and Disaster Investigation and Post-Disaster Treatment Team. Responsible for the implementation of the instructions of the emergency leadership group, coordination and command of the professional 3.5.2 under the responsibility of the group: 3.5.2.1 alert evacuation guidance team: responsible for site security, traffic command, set up a cordon to prevent the site of unrelated personnel into the cordon area, guidance for the evacuation of the masses, the protection of materials, and so on. 3.5.2.2 Technical Advisory Group: responsible for research to determine the scene of the rescue, rescue programs, proposed emergency safety and technical measures, to provide technical support for on-site command work. 3.5.2.3 On-site rescue group: responsible for carrying out on-site rescue, rescue work, timely control of the source of danger, and actively take safety measures to prevent the expansion of the accident. 3.5.2.4 Logistical support team: responsible for transportation, to ensure the transportation of rescue personnel, materials and equipment required for the vehicle, to ensure the smooth flow of rescue roads; responsible for the provision of rescue equipment and materials; to provide the relevant emergency protective gear; responsible for life support, to provide a place to rest, food and other necessities of life, etc. 3.5.2.3 Site rescue team: Responsible for the scene rescue, rescue work, timely control of the source of danger, and actively take safety measures to prevent the expansion of the accident. 3.5.2.5 Disaster Investigation and Aftercare Team: Participate in the disaster investigation and aftercare team composed of the unit and its higher authorities and local government departments, and be responsible for providing the relevant raw materials, and do a good job in aftercare related matters. 4 Prevention and Early Warning 4.1 Hazardous Sources Monitoring 4.1.1 Establish and improve the enterprise to prevent abnormal thunderstorms disaster safety management rules and regulations, formulate emergency response plans, improve the system of responsibility for safety at all levels, and strengthen the accountability system. 4.1.2 Develop practical safety education and training programs, educate workers to continuously improve safety awareness, carry out safety education and safety production skills training, and effectively improve the ability of workers to self-protection and the ability to avoid the risk of accidents. 4.1.3 Regularly organize annual emergency drills for abnormal thunderstorms and disasters, so that workers are familiar with the emergency work process, master the essentials of emergency work, and through the drills to find out the problems of emergency preparedness, and timely rectification. 4.1.4 Organize and carry out special inspections to prevent abnormal weather disasters, focusing on checking the preparation of each department to prevent abnormal weather disasters, the implementation of the emergency plan and responsibility system to prevent abnormal weather disasters, to prevent abnormal weather disasters and key monitoring parts, to prevent abnormal weather disasters, such as material reserves. 4.1.5 Strengthen the inspection of production site safety facilities, and further improve the site safety facilities and signs. Improve the labor operating environment, so that the production site has a strong ability to resist abnormal weather disasters. 4.1.6 Prepare special operation mode and anti-accident plan for preventing abnormal weather disaster, and organize study and drill. 4.1.7 Before the arrival of abnormal weather disaster season is responsible for the whole plant flood control and drainage equipment, submersible pumps, emergency lighting facilities and other emergency mechanical equipment, electrical equipment for a comprehensive maintenance. 4.1.8 In the lightning catastrophic weather climate must be checked before the occurrence of electrical, control equipment grounding and lightning safety measures. 4.2 Early Warning Actions 4.2.1 The company shall, according to its local stage and seasonal characteristics, combined with the environment, abnormal fog, rain and snow weather disaster forecast information, in accordance with the principle of early anticipation, early notification and early arrangement, carry out the analysis and assessment of the risks associated with abnormal weather disasters. After getting the following extreme weather alerts, start the warning. 4.2.1.1 Orange rainstorm warning signal: 3-hour rainfall will reach more than 50 millimeters, or has reached more than 50 millimeters and rainfall is likely to continue. 4.2.1.2 Fog orange warning signal: visibility of less than 200 meters within 6 hours may occur. Dense fog, or visibility of less than 200 meters, greater than or equal to 50 meters of dense fog has occurred and may continue. 4.2.1.3 Thunderstorm yellow warning signal: 6 hours may be affected by thunderstorms and gales, the average wind can reach more than 8, or gusts of more than 9 and accompanied by strong lightning; or has been affected by thunderstorms and gales, the average wind up to 8-9, or gusts of 9-10 and accompanied by strong lightning and thunder, and may continue. 4.2.2 The warning order is issued by the safety inspection department, through the first person responsible for safety production to the department to which it belongs. 4.2.3 After entering the state of early warning, the relevant units in the warning area should take the following measures: 4.2.3.1 Check and confirm all kinds of protective equipment for emergency response, medical equipment, transportation gear, communication equipment, firefighting equipment, production and lighting of standby power equipment, testing equipment and equipment, all kinds of emergency response materials, equipment, and so on, in accordance with the requirements of the respective emergency plan. Must be fully equipped. 4.2.3.2 Check and confirm the alarm method of various communication tools, contact and signaling regulations, and confirm that various rescue teams are familiar with the corresponding methods and steps to be taken after the occurrence of the incident. 4.2.3.3 Check to confirm that the evacuation channel, the gathering place is safe and reliable, transfer, evacuation or evacuation of people who may be affected by the hazardous area, and to be properly placed. Seal, isolate or limit the use of the place, suspend operations or activities that may lead to the expansion of the hazard. 4.2.3.4 Emergency leadership group to work, call the emergency work team, emergency rescue teams to enter the scene. 4.2.3.5 Make contact and coordination with grid dispatch. 5 Information Reporting Procedures 5.1 Immediate Reporting 5.1.1 Immediately after the occurrence of an abnormal weather disaster event, the emergency response team should report to the main person in charge of the unit. The report includes: the time of the disaster, the type of disaster, a brief history, the number of casualties, equipment and property damage, as well as on-site rescue of the required professionals and rescue equipment. 5.1.2 Instant telephone reporting procedures are as follows: (1) The person in charge of the scene to the emergency team leader report. (2) The safety department of the company reports to the safety production department of the group company. 5.2 Express report of abnormal thunderstorm weather disaster events After the occurrence of abnormal weather disaster events, the affected unit should report the written express report of the weather disaster events to the group company in 30 minutes by phone, microblogging, etc. After completing the immediate report, the express report should include the following contents: (1) The time and location of the occurrence of abnormal weather disaster events. (2) A brief description of the unusual weather event, the number of casualties, the preliminary estimate of direct economic losses; the preliminary statistics of equipment damage; and whether it has an impact on society. (3) The preliminary judgment of the cause of the accident caused by the abnormal weather disaster. (4) meteorological disaster events after the occurrence of emergency response, measures taken and accident control. 6. Emergency response 6.1 Response grading According to the level of the accident, the plant's response to accidents due to unusual weather hazards is graded as follows: three-level response: due to unusual weather hazards resulting in general personal accidents, general equipment accidents, for the enterprise level of emergency response, the plant to organize the accident emergency response. 6.2 Response Procedures The Safety Department of the company immediately notifies the relevant departments and the emergency response team to take precautionary measures and issue an early warning upon receipt of the forecast of abnormal weather disaster from the meteorological department. After receiving the immediate report of the accident, according to the instructions of the head of the emergency response team, immediately start this plan and notify the relevant personnel to quickly go to the scene to implement rescue. Abnormal weather disaster emergency work in the company's abnormal weather disaster under the leadership of the leading group of emergency response, by the scene commander in chief to fully organize and direct the emergency response to the accident, according to the rescue needs to notify the professional team in a timely manner to rescue. 6.3 Disposal measures When an abnormal thunderstorm weather disaster occurs, the head of the emergency response team should immediately start the plan, organizing the professional team to implement rescue and relief. 6.3.1 Cooling shed, finished product warehouse safety: (1) before the rain will be finished warehouse in the calcium carbide empty, began to rain calcium carbide crushing equipment all shutdown power outage, check the finished product warehouse fourth floor ventilation fan for the normal open state, the finished product warehouse fourth floor window for the tightly closed state. (2) Before the rain in the cooling shed, the finished product warehouse entrance pile Lei sandbags (height 50cm and above), to prevent the rain does not enter the cooling shed, finished product warehouse. (3) Before it rains, pull down the rain curtain at the entrance of the crushing line, and pile up sandbags (height 50cm and above) underneath. (4) When it rains, the cooling shed, the finished product warehouse duty personnel uninterruptedly patrol the scene, in the cooling shed, the finished product warehouse at the entrance of the terrain of the low point must be arranged to guard; leakage points in a timely manner using the barrel to pick up, blocking, covering, etc., and report, make a good record of the; check the drainage facilities, to maintain smooth, abnormalities in a timely manner to report. (5) If there is rainwater into the cooling shed, finished product warehouse, found that the personnel immediately start the "calcium carbide library fire accident special emergency plan. First of all, immediately report to the workshop leadership, cut off the water source material, you can use the nearest dry powder fire extinguishing equipment on the calcium carbide library to fight the initial fire; followed by a large number of dry sand, soil on the fire at the calcium carbide for burial, to control the expansion of the fire; when the source of the acetylene gas generation can not be eliminated, should not be put out the fire, only to control the fire on the surrounding facilities, equipment, and the hazards. The fire needs to be evacuated around the calcium carbide warehouse, especially the evacuation of calcium carbide warehouse downwind operating personnel; 6.3.2 high and low voltage room, UPS cabinet room and other major parts of the safety: during heavy rain, the plant water can not be discharged for a short period of time, the emergency response team immediately on the high and low voltage room, the main plant and the pump room, the air compressor room, etc., around the good rainwater back-up measures (heap Lei sandbags, dredge drainage), electrical facilities roof leaks ), the roof of the electrical facilities leakage, to take the plastic cover, serious situation, need to timely power outages. When the cable ditch into the water, shall not be arbitrary treatment, prohibit people from entering the cable ditch. Need to be disposed of according to the following requirements: (1) check the seepage (into the) water points, the use of sandbags or soil to seal, to prevent a large amount of water into the cable trench; (2) a small amount of seepage of water (water level of 15cm or less), by a professional electrician wearing insulated boots, insulated gloves to check the cover of the cable trench, the measurement of the water level must be used insulated material items, and closely observe the cable trench Water level, a large amount of water (water level of 15cm or more), the timely use of submersible pumps will be discharged from the cable trench, the use of submersible pumps before the drainage, the electrician must check the cable trench is not a leakage of electricity, to confirm that the placement of submersible pumps at the cable line, if you can not meet the conditions, you must be disconnected from the power to use the submersible pump pumps to pump water. (3) a large amount of water can not be controlled, the first power off in the drainage process, the power supply must be carefully checked before checking the power, meet the requirements of the power supply before the power supply. Outdoor equipment (terminal box, control box) into the water, can cause protection, automatic device error, refused to move, etc., can cause serious downtime, tripping. Electrical professionals should strengthen the inspection of outdoor equipment, do a good job of preventing electric shock safety measures, check the outdoor terminal box, control box cabinet door, check whether the rain leakage, and do a good job of rain measures. Outdoor terminal box, control box into the water, the post staff found, timely report to the workshop duty leader, contact the electrician to disconnect it, after disconnecting the electrician to check, drying treatment. Regardless of the time, the plant staff found that the plant cable line has a fire, pull the arc and other anomalies, must be reported to deal with level by level. 6.3.3 Calcium carbide furnace purification system, furnace gas conveying system safety: thunderstorms caused by calcium carbide furnace purification system and furnace gas conveying system emergency braking, interlock failure, must be an emergency stop to deal with; resulting in CO leakage, immediately start the "CO Leakage Emergency Response Plan". 6.3.4 Thunderstorms cause water and power outages in the plant, you need to immediately start the "emergency plan for water and power outages in the plant". 6.3.5 Raw material workshop carbon materials, lime site related personnel to ensure that the drainage facilities are intact, to prevent the open carbon materials by the rain, so that the loss of coke or a large area of collapse; and beware of has been soaked in water lime burns. 6.3.6 During the rainstorm, each workshop and department should immediately draw out personnel to enter the production site, organize emergency rescue, to ensure normal operation, outdoor should be prohibited all except for critical treatment of all work, timely inspection of outdoor equipment, checking the status of water seepage in the building facilities, and timely arrangements for processing. 6.3.7 Electrical professionals should inspect all electrical equipment and high and low voltage room, transformer room equipment operation after heavy rain. 6.3.8 During thunderstorms, it is forbidden to wear wet clothes, wet shoes, and wet gloves for electrical work, and the personnel at the exit position must ensure that the long leather gloves and labor insurance shoes are dry when they shabu-shabu, so as to prevent the occurrence of electrocution accidents. 6.3.9 Interruption of communication system: When employees find that the communication system (telephone and network) is interrupted in the factory, they should use cell phones and walkie-talkies to report the abnormal situation step by step and contact the upper and lower posts to prevent accidents from occurring due to the interruption of communication and untimely communication. The occurrence of monitoring video interruption, the central control room personnel immediately report, and contact the team leader to the scene to check the situation, the workshop to contact the Ministry of Intelligence to deal with, and arrange for a person to increase the number of post inspection. 7. Emergency supplies and equipment to protect: the reserve of emergency resources each workshop, departmental preparation composition. Reserve the following materials: woven bags, submersible pumps, water pipes, cables, rain shoes, raincoats, plastic sheeting, shovels, medicines, medical equipment, etc. and prepare emergency vehicles and emergency communications equipment. Paper Mill Thunderstorm Emergency Plan 2 Purpose: In the typhoon, thunderstorms before the arrival of natural disasters, do a good job in advance of the emergency preparations, rapid and effective control of the situation and properly dealt with, the typhoon and thunderstorms may cause damage to the minimum. The start of the plan: received from the Shenzhen Meteorological Observatory issued a typhoon and thunderstorm warning signal, the plan is officially launched. Management Office of the departments responsible for: order maintenance team: check the building sky surface with or without debris and timely notification of the cleaning class immediately clean, check the floors of the tenants door, window closed or hanging things; basement drainage ditch without blockage, close the floor east, west of the fire staircase windows. Cleaning class: sweep the sky debris to ensure that there is no omission; with the Ministry of Engineering to check the downpipe, basement drains are smooth. Engineering Department: check whether the grounding of the basement equipment is normal, whether there are any loose parts in the cooling tower on the ceiling, whether there is any breakage in the lightning grounding network, whether the drainage pipe is smooth, and ensure that the basement sump pump maintains normal operation. Customer Service Center: print the notice of typhoon and thunderstorm and post it on the notice board, and the assistant reminds the tenants in the area of responsibility to close the doors and windows after work and turn off the main power supply in the office. Work procedures: management office in the higher or weather station issued typhoon, thunderstorm notification, immediately reported to the relevant leadership and reach the positions of the department. Management Office of all employees can identify the typhoon and rainstorm signals and the meaning of the departments in the notification, should immediately organize the Department of staff in accordance with the above departmental responsibilities to do a good job in the prevention of wind and thunderstorms, and fill out the inspection form. 1.0 Purpose To standardize the company's organs and management offices to prevent typhoon rainstorms in the preliminary preparatory work, handling procedures and methods. 2.0 Scope Applicable to the company's organs and various neighborhoods typhoon rainstorms, strong tropical storms and other catastrophic weather emergency response. 3.0 Responsibilities 3.1 General Manager: responsible for the overall coordination of the company's work to prevent typhoons and rainstorms. 3.2 Quality Management Department: responsible for collecting typhoon and rainstorm related information and timely notification; responsible for checking the implementation of typhoon and rainstorm preparedness in each neighborhood. 3.3 Engineering Management Department: responsible for organizing the inspection and preventive work of electromechanical equipment to ensure the normal operation of electromechanical equipment and reduce force majeure losses. 3.4 Office: responsible for scheduling vehicles and human resources, timely support for the rescue work in key neighborhoods, checking the neighborhood duty and stick to their posts, and providing on-site rescue personnel logistics services. 3.5 Care Department: is responsible for organizing the reserve caretaker support authorized rescue work, to assist the director of the management office of the key district to command the rescue. 3.6 Maintenance Center: responsible for checking the mechanical and electrical equipment within the scope of responsibility, to help guide the management office repair. 3.7 Management Office Director: responsible for the cell typhoon storm prevention site of the overall command work, check the reserves of emergency supplies and equipment, arrange 24-hour duty to accept households to report repairs, timely statistics and report the damage. 3.8 All employees: During the typhoon and rainstorm, all employees must remain at their workplaces or wait for orders at their residences, keep communications open, do not take leave to go out, and wait for orders at any time. The blue typhoon signal and red rainstorm signal, supervisors and above must be on duty at work; orange typhoon signal and red rainstorm signal, the company's functional department managers must be to the point of the community to guide the defense work. 4.0 content 4.1 Typhoon rainstorms during the company authorities on duty. 4.1.1 The general manager is the person in charge of the duty of the company's organs and is responsible for the general coordination. 4.1.2 The manager of the Quality Management Department is responsible for checking the implementation of the preparatory work of the neighborhood to prevent typhoons and rainstorms; following up the typhoon information and informing the superior leaders in time. 4.1.3 The manager of Engineering Management Department is responsible for checking the implementation of precautionary measures and emergency measures for electromechanical equipment in the district. 4.1.4 The office director is responsible for checking the implementation of all employees to standby at the place of residence, checking the district duty and standby position, checking whether the staff communication is smooth, scheduling vehicles and human resources, timely organization of support for the key districts of the rescue work, to provide on-site rescue personnel logistics services. 4.1.5 The manager of the care department is responsible for organizing the reserve caretaker according to the instructions to support the rescue work, to assist the director of the management of key districts to direct the rescue. 4.2 Management Office of the typhoon and rainstorm preparedness. 4.2.1 Customer service supervisor to organize the implementation of preventive preparations a, follow up the weather station broadcast information about the progress of the typhoon and rainstorms, at any time will be the latest typhoon and rainstorm signals to report to the superiors and announcements of the tenants, and timely adjustments to the preparatory work b, distribution of community precautionary notices of typhoons and rainstorms to remind residents of the following matters: 1) as far as possible, to stay in the home, close doors and windows, and tie up objects that are easily blown down by the wind. 2) Do not stay near glass doors and windows for a long time to prevent injuries when the glass breaks. 3) Remove items placed on window sills and balconies, such as flower pots, to prevent injuries when they fall. 4) Avoid staying in open places and walk away from tall trees to prevent injuries. 5) Check the floor drains and drainage pipes of balconies and private gardens to prevent blockage. c. Contact the greening company to reinforce the green plants; move the potted flowers to low or hidden corners. d. Supervise the cleaners to remove debris on the rooftop of the house and deposits in the floor drains; 4.2.2 Preventive preparations organized and implemented by the maintenance shift manager. a, check and ensure that all sewage pumps can work properly; check the drainage network, ditches, sewage wells, roof floor drains and other drainage facilities to ensure smooth drainage. b, check the neighborhood backup generator, reserve enough diesel fuel to ensure that the generator can operate normally. c. Check the elevator shafts, elevator machine rooms, equipment rooms and other doors and windows to prevent rainwater immersion measures. 4.2.3 Precautionary preparations organized and implemented by the caretaker captain. a, responsible for checking vacant houses and close the doors and windows, check and close the doors and windows of the public **** building. b, check the record did not close the doors and windows of the tenants room number, timely contact with the tenants to close the doors and windows. c, stop outdoor construction work in the neighborhood, urge the construction unit to do a good job of scaffolding, scaffolding and other construction facilities, safety reinforcement, set up a warning sign in the temporary ditch, pit, to prevent accidents. d, check the neighborhood inside and outside the billboards, can not resist the typhoon storm billboards, neon lights to be removed in advance. e, strengthen the community inspection, to avoid underground garages, elevator shafts and other parts of the water. f, check to make sure that the emergency tools and equipment performance is good. g, check to make sure that the first aid kit basic drugs are available. h. Reserve enough flood sandbags for backup. In the case of not affecting the service, in the former easy to flood the place, in advance with sandbags to build a good water retaining wall. 4.3 Duty of the management office during typhoons and rainstorms. 4.3.1 The director of the management office is the person in charge of duty in this district, and should be diligent in inspection, good at identifying problems, timely supervision of on-site work, and decisive handling of emergencies. 4.3.2 The customer service center must be on duty 24 hours a day, timely acceptance of tenants to report repairs, on-site view of the damage. 4.3.3 The caretaker team must increase the frequency of patrols, the caretaker should be wearing a raincoat, rain shoes, holding a flashlight patrol. 4.3.4 Other employees must remain at their residence on standby or at their work station, not taking leave to go out, and be ready to listen to command orders. 4.3.5 Staff must keep communications open, pay attention to their own safety, such as alone to carry out urgent tasks, must take appropriate security measures and notify other employees. 4.3.6 In case of injury or death during a typhoon or rainstorm, call the "120" emergency number immediately. 4.3.7 If the management office does not have enough human resources to cope with the storm, it should report to the office for support. 4.4 Management of typhoons and rainstorms after the later work. 4.4.1 Timely inspection of statistical reporting of water seepage and typhoon rain damage and loss of housing, fill out the "case (incident) registration form". 4.4.2 Timely contact with the insurance company to deal with insurance compensation caused by typhoons and rainstorms. 4.4.3 Organize cleaning staff to quickly clean up the channels blocked by garbage and keep the environment clean and sanitary. 4.4.4 Organize greening companies to prune, replenish seedlings and reinforce green plants. 4.4.5 Organize maintenance personnel to check and restore equipment and repair public **** facilities. 4.4.6 Organize to follow up the repair of water leakage in the house, carry out home visits and repair return visits. 5.0 Annexes 5.1 Typhoon Warning Signal 5.2 Rainstorm Warning Signal