1, special equipment use registration certificate process is as follows:
(1) application, the applicant to provide paper materials to the Municipal Supervision Bureau office window to apply;
(2) acceptance;
(3) review;
(4) delivered by mail or to the office window to receive the "special equipment use registration certificate". Special Equipment Use Registration Certificate".
2, the legal basis: "Chinese People's *** and State Special Equipment Safety Law" Article 33
Special equipment should be put into use before or within thirty days after the use of special equipment, to the department responsible for the supervision and management of special equipment safety for the use of registration, use of the registration certificate. Registration mark should be placed on the special equipment in a prominent position.
Article 35
Special equipment should be used to establish special equipment safety technology files. Safety technology file shall include the following:
(a) special equipment design documents, product quality certification, installation and use of maintenance instructions, supervision and inspection certificates and other relevant technical information and documents;
(b) regular inspection of special equipment and regular self-inspection records;
(c) the daily use of special equipment condition records;
(d) special equipment and its ancillary instrumentation maintenance records;
(e) special equipment operation failure and accident records.
Two, special equipment for what conditions are required
Special equipment for the conditions required:
1, with the legal qualifications, there is a valid business license certificate or personal identification applies to the equipment owned by private citizens;
2, the use of special equipment is a legal production of special equipment containing the design, manufacture, installation, transformation, repair. In line with the relevant laws and regulations of special equipment, safety specifications and standards;
3, elevators, cranes, passenger ropeways, large-scale amusement rides, boilers, pressure vessels, the manufacturing process and boilers, pressure vessels, pressure piping, installation, renovation, major maintenance process, must be supervised by the inspection and inspection; the need for the first time the inspection or more than the periodic inspection cycle, but also need to be tested by the inspection Qualified.