Property management, refers to the owners through the selection and hiring of property service enterprises, by the owners and property service enterprises in accordance with the property service contract agreement, the following is what I have compiled for you 2022 cell property management work program, just for reference hope to be able to help you.
2022 community property management work program1
First, Evergrande Metropolis Project Overview
"Evergrande Metropolis" in the northeast of Nanchang City, near the city's High-tech Development Zone, and at the same time, from the city's east of the sub-central business district is only 15 minutes. The project covers a total area of 289 acres. The project covers a total area of 289 acres, with a total construction area of 421,152 square meters, ****13 high-rise residential buildings, 3 hotel-style apartments, 1 high-rise office building, ****Developed in three phases. There are five 27-storey high-rise buildings in the first phase, with an area range from 80 square meters to 160 square meters, and the main types are two-bedrooms of more than 80 square meters and three-bedrooms of about 90 square meters.
The planning of the district is based on the central principle of "people-oriented, natural, forward-looking, integration, science and technology, practical, safe", and the overall social benefits, economic benefits and environmental benefits are unified as the benchmark, with the intention of portraying a high-quality ecological environment, and shaping a naturally beautiful, comfortable, convenient, hygienic and safe, man and nature **** living place of pleasant habitat. A pleasant place to live. Making full use of the comprehensive location advantages and natural conditions of the district, creating a unique overall landscape and spatial order, shaping high-quality inner and outer environments in order to enhance the quality of life of the residents, and providing practical and successful planning examples for the operation of the city.
Evergrande Metropolis has a five-star clubhouse of more than 5,200 square meters, with complete supporting facilities.
Evergrande Metropolis is serviced by Infinity Property Company Limited, which is a national first-grade qualified company, to provide you with British-style butler services of international standard.
1. Project Advantages: 13 boutique advantages, casting the ancient city's luxurious ecological habitat
(2) Sitting at the Chanba Throat Gateway, enjoying the world's ecological habitat
(3) 2,764,410,000 square meters of continental classicism, the construction of the ancient city's rare human habitat
(4) French garden design concepts, inherited from the continent's mellow and authentic flavors
(5) Continental neoclassicism concept, interpretation of the new standard of ancient city habitat
(6) 35,500 square meters of continental royal garden, 3,000 square meters of broad view of the central lake
(7) 7,144 square meters of hall-level lakeside clubhouse, international standards of star-level facilities
(8) Household area from 60 square meters of one-room to 180 square meters of leaping floors, a wealth of product types; five bright design, sunshine through the
(8) The floor area from 60 square meters of one-room to 180 square meters of leaping floors, product types; five bright design, sunshine through the
(9)9A decoration of famous brands
(10)International brand hand in hand with Mingdu, creating cost-effective human settlements
(11)Evergrande Real Estate boutique navigating China's top ten
(12)6 longitudinal and 12 transversal road network, at hand with the urban life circle
Located in the northwestern corner of Jiu Shih Road and Mining Road, covering an area of 117.8979 mu, with a total built-up area of 276.8979 m2, and a total gross floor area of 2,760.6 million square meters. The green coverage rate reaches more than 45%. The total planning of the district is about 2597 households, with 1716 households in the first phase of planning.
2, the region's supporting environment
From the viewpoint of urban amenities, relative to other urban areas in the city, the east side of the city, rehabilitation road, light industry, a small shopping center has become a platform for foreign trade in the city, coupled with the rise of the Changle Road shopping district, but also makes the region's supporting facilities are becoming more and more complete, in order to fully meet the daily life of the region's residents, but also to attract more and more citizens of the city of the city to come to this area! Shopping and consumption. Education - many famous schools such as Meidu Jiaotong University, Meidu Fourth Medical University and other key high schools distributed around the project area.
Business - Daming Palace building materials market, Lotus, China Resources Vanguard, Starfish Supermarket and so on? Convenience of life in the eastern suburbs of Changle business circle, including rehabilitation road clothing market, colorful shopping malls, East China Clothing City and other shopping convenience.
Medical - Xijing Hospital, Tangdu Hospital, Baqiao District Hospital of Traditional Chinese Medicine, Qindu Stomatological Hospital and so on.
Banks - Industrial and Commercial Bank of China, Agricultural Bank of China, China Merchants Bank, Commercial Bank and so on.
Hotels - Jianguo Hotel, Shangri-La Golden Flower Hotel, Kempinski super 5-star hotel.
Second, the management service concept and management ideas
According to the design description, Evergrande Metropolis noble residential community in the household design in line with the design concept of large households, people-oriented, the intentional pursuit of a return to nature, away from the hustle and bustle of the downtown environment. Our research results also show that Evergrande Metropolis residential area is the residence of "urban cultural people", "cultural people" are sentimental, reasonable and law-abiding. To carry out property management work, we must attach great importance to their cultural needs, service needs and the desire to participate in community building.
We propose to build "Evergrande Metropolis Cultural District" ideal model of human habitation, emphasizing the rise of physical management to cultural management, to achieve the management goal of "cultural community", which is a high degree of integration of traditional home concepts and modern lifestyles. Cultural management involves two levels, one is through a variety of forms of communication to promote normal communication between the property manager and community members and community members, so that the traditional community concept of "good neighborliness" can be rationally returned, and to stimulate the community members *** with the participation in the construction of the community's humanistic environment enthusiasm. Secondly, through a variety of forms of publicity to cultivate the concept of collectivism of community members, and then in-depth to their use of property, especially in the use of *** use of property, to discipline and guide, in order to reduce the difficulty of management, enhance the effectiveness of management. We envision:
1, advocating "every day to make you satisfied". Service concept:
We uphold the "implementation of scientific management, continuous improvement of services, continuous innovation, enhance customer satisfaction" quality policy, the implementation of standardization of the community, professional management services. Each service operation, each operation action has a strict operating standard, have gone through a lot of training, enough to achieve time-saving, efficient service guidelines. We implement the "management report system", quarterly report to the owners of the property management service fee income and expenditure, as well as the maintenance of the body of law and order, cleaning, greening, community culture, and other special work operation, truly respect the owners' rights and interests.
2, camping "cause to true, life to love" cultural service concept
Community culture is the property manager and community members *** with the creation of community characteristics of the perfect combination of spiritual wealth and material form, the ultimate goal of community culture construction is to establish a residential area, "life to love", "life to love", "life to love", "life to love", "life to love", "life to love", "life to love", "life to love", "life to love", "life to love", "life to love". The ultimate goal of community culture construction is to establish a "life to love" cultural atmosphere in the residential area to replace the "desert of human feelings" that is spreading in the community. We will build a new community culture through the development of healthy and rich community cultural activities.
We will focus on "environmental protection, popular science tutoring, community public welfare, property management mission, healthy home" and other five themes to organize and plan community activities, and strive to Evergrande Metropolis noble residential community created for the construction of spiritual civilization window.
3, shaping the "simple and simple, the pursuit of fashion" aesthetic concept
In the new century, owners are more concerned about the human environment in the living area. Property managers and owners to participate in the construction of environmental culture, will greatly satisfy the owners to enjoy the body and mind, close to the natural needs of living. In the creation of environmental culture, we will introduce a set of image recognition system combining modern and traditional, in line with the characteristics of the architectural design, to enhance the grade; to provide high-quality horticultural maintenance, to maintain the good growth of greenery; to organize owners in various forms to carry out environmental protection and beautification of their homes, and constantly improve the residential area of the garden vignettes and natural landscapes, to create a strong humanistic atmosphere, and to establish a harmonious * * * harmonious "urban environment" between people and the environment. **The "Urban Homeland Culture Zone" is a place where people and the environment can harmonize and integrate.
The development of science and technology has brought about rapid changes in architectural design concepts, and the demand of owners for services is also rising. As a property manager of Evergrande in the twenty-first century, it is necessary to establish a modern management system and advanced management operation mechanism. We have realized internal employee shareholding in the management system and established a modern enterprise system in line with the laws of market economy. In the management mechanism, the establishment of a combination of distribution mechanism according to labor distribution and distribution according to the capital, the establishment of a variety of systems organically combined incentive mechanism, the establishment of competition, two-way choice of employment mechanism.
Third, explore, create "Evergrande famous cultural district" property management new model
"Evergrande famous", is designed for the insightful people and entrepreneurial pioneers in Nanchang City to create a high-quality residential. From district planning, household design, engineering construction, property sales to property management links, Evergrande Metropolis noble residential district in the future
2022 district property management work program2
In order to effectively carry out the work of the resident site property management services, to achieve the management work procedures and standardization of service work, the implementation of the brand strategy. According to the relevant laws, regulations and property management related documents, we have developed a temporary program for the implementation of the property management services of the pre-residency project.
First, the overall goal of the implementation of standardized management, to ensure service quality.
Second, a clear pre-presence project property management structure and related duties
1, a clear pre-presence project property management structure
The company's pre-presence project property management implementation of the person responsible for the implementation of the system of unified standards for the pre-presence project customer service under the Department of vertical management, and at the same time to improve the quality of service supervision and protection system, that is, the establishment of a pre-presence project Quality Assurance Department, by the inspector in accordance with the "interim program for the implementation of property management services in the pre-presence project" and "Employee Handbook" to implement effective supervision and management.
2, the establishment and improvement of the pre-site project related duties.
Third, the establishment and improvement of standardized workflow and service standards
(a) a clear customer service department work plan
Standard: the implementation of a weekly written report system by the pre-presence project property consultants.
1, every Friday afternoon at 17:00 hours before the submission of this week's project work report
The report information includes: the number of households, the number of unsigned households, the existence of problems and reasons for the analysis, the customer's views and needs analysis, work to improve the views of the development and construction of the unit's work dynamics, the state of the project site introduction.
2. Monthly written reports on the progress of on-site construction and project progress record sheets
Reporting information includes: the progress of the project, the existence of problems and reasons for the analysis, work to improve the views of the development and construction of units, the work of the development and construction of dynamic.
3, next week's work plan
4, rationalization recommendations, opinions
5, other
(b) clear pre-presence of the project manager's weekly meeting system work plan
1, weekly meeting to inform the departments of the pre-presence of the work situation, while putting forward the next week's work plan and focus
2, study and analyze the work report of each department Work report
3, research and analysis of new developments in property management
4, the implementation of training and communication
5, research and analysis of service quality reports
6, other
(C) the establishment and improvement of pre-presence project property service quality supervision and guarantee system
1, the establishment of the pre-presence project Quality Assurance Department, to identify the Quality Supervisor
2, clear working procedures
a, inspectors every day no less than two supervision and inspection of the departments in the field of site implementation, and according to the factual records, non-standard services on-site correction.
Inspection information mainly includes: hospitality, appearance, dining, labor discipline, site order maintenance, cleanliness and hygiene, etiquette and so on. Standards in accordance with the provisions of the "Employee Handbook"
Inspector weekly written reports and analysis of the improvement of opinions submitted by 17:00 p.m.
b. Monthly inspector written survey of the Sales Department on-site supervisors and the site of the direct contact, while analyzing and studying the relevant data
Specific survey information, attached to the _ Property Company's pre-presence of the project quality of service questionnaires
Specific survey information, attached to the _ Property Company pre-presence project service quality questionnaire
The person in charge of the pre-presence project in the first regular meeting of the month to submit a written report or the person in charge of the direct, and at the same time to the company's office report.
(d) Coordinate the development and construction units of the projects to establish a customer reporting system
1, the development of a standardized system of contact letters
2, the establishment and standardization of the regular meeting system
3, to assist in the establishment of a customer contact reporting system.
Fourth, the establishment of a long-term improvement mechanism
1, the establishment of the pre-presence project property management services research organization
2, the research organization's current main tasks
a, research and summarize
b, the development and improvement of pre-presence project managers, property consultants and related personnel duties, on-site management system, staff manuals etc.
c, the preparation of property management services in the training of common teaching materials
d, there are plans to prepare the project property management program
e, the effective implementation of the image planning system
f, there is a plan to implement the development of the property management staff internal training
g, to do a good job in the research of new technologies, new materials, new programs.
2022 District Property Management Work Program 3
In order to save time in the production of pre-property management program, in accordance with the original template to make the corresponding aspects is a more effective method.
First, the senior responsible person of the pre-property management program.
1, in the owners to take over the room to publicize the polite and harmonious district construction requirements and the Ministry of Construction, "Interior Decoration Management Measures", to inform the owners of the prohibition of throwing objects from a height and fire prevention common sense.
2, directly responsible for high-level property management work.
3, is responsible for security doors, fire doors, pipe wells, stairwell glass and other public **** facilities and equipment with the regular inspection and maintenance work.
4, responsible for public **** fire prevention and key management, to ensure the rapid use of special conditions, leading the renovation administrator to do a good job of the owners of the pre-decoration management.
5, leading the elevator administrator on the use of elevator management, responsible for elevators, fire facilities and other special equipment inspection and maintenance work. Management of the roof, in addition to normal equipment inspection, maintenance and repair needs, is strictly prohibited on people.
Responsible for high-level security order maintenance work and security order maintenance personnel management.
6, do a good job of high-level outside the environment (health) and all kinds of decorative materials for sale management, advertising posted, hanging in order, the sale of goods placed neatly, uniform.
7, responsible for receiving all kinds of complaints from owners, and coordinate with the development company and other relevant units to solve the problem.
8, do a good job of contingency plans, the occurrence of emergencies to start the plan in a timely manner to prevent major accidents, to help deal with all kinds of emergencies.
Second, the specific work procedures and standards of the pre-property management program:
1, every day regularly check the operation of the elevator, and make a record. Record every hour during the renovation period (after normal use, record every 2 hours), find problems, promptly inform the administrator.
2, public **** key to be borrowed and returned, lending to sign, do a good job of owners and external personnel key borrowing records.
3, found illegal use of the elevator, dumping garbage, damage to public **** facilities, through the intercom system to record and stop in a timely manner, and persuasion.
4, in the event of an emergency, inform the leadership in a timely manner, and take measures within their capabilities. (Such as elevator water failure, owners of the home running water, etc.)
5, such as the owners of the handling of goods, inform the owners of the precautions to be taken to supervise the owners of the building unit door, the elevator until the end of the handling of the situation, such as damage to inform the administrator in a timely manner.
6, every day on the building fire security doors, building fire boxes, safety exit lights, fire alarms to check and make records. The time is after work, before work once.
7, do not argue with the owners, to deal with the problem to focus on the tone and attitude, can not deal with timely notification of the administrator.
2022 District Property Management Work Program 4
First, _ Project Property Analysis:
1, the property is open to the geographical range, closed to strong;
2, the acquisition of property personnel at a high level, belonging to the real estate market cutting-edge customer groups, which live in the privacy, security requirements are higher
3, the acquisition of property use is complex, there are residential requirements, office requirements, club requirements, etc.;
4, the property management is mixed management, that is, the management of the river and municipal roads, but also the management of private facilities and services to customers.
Second, according to the above analysis, the _ project property recommended as follows:
1, recommended in the cleaning management of the implementation of two separate, that is, the river and municipal roads cleaning work and cleaning work for the owners to bring separate. Because, the river and municipal roads cleaning work belongs to the project area with public **** and social nature of the work, its specific environmental health standards and quality of personnel and directly for the owners to bring the cleaning service requirements are different, separate management is conducive to reducing the cost of property management, if necessary, through the property company will be part of the work of external subcontracting.
2, highlighting the two systems of property management, that is, the emergency response system for emergencies and the housekeeping service system for owners.
Third, the property management to bring the daily service information:
1, the cleanup of the river and the protection of water quality (such as through the planting of aquatic greenery to improve water quality, according to seasonal stocking of fish to strengthen the effect of the river landscape;
2, the municipal road cleaning;
3, the owners of the courtyard environment cleaning (mainly concentrated in the seasonal changes, such as windy).
4, 24-hour water and electricity maintenance;
5, the owners of the living garbage removal on a regular basis;
6, water, electricity, gas and other equipment routine maintenance and maintenance;
7, the project within the scope of the planting and maintenance of green;
8, the owners of the energy costs on behalf of the collection and payment of the payment of the cost of energy;
Fourth, the property special service - butler service system:
1, the service of the butler, refers to the butler is responsible for, led by the owner, including security, cleaning, chef, driver, etc. to bring the owner to bring the best possible service, for the Jade River project put forward by the butler service should be interpreted as through the efforts of the property housekeeper to bring the owner to bring the best possible service at any time to solve the needs of the owner on life, travel and so on. living, traveling and other needs.
2, butler service recommended by two to three people 24 hours a day full-time responsible for three to four owners at any time may put forward the service requirements, the owners have the need only for the housekeeper in charge of the proposed by the housekeeper is responsible for as far as possible to solve the problems raised by the owners; any service for the owners need to be accompanied by the property steward. In this way, the owners of the requirements of a person responsible for, to avoid dealing with the problem of mutual excuses to improve the efficiency of problem solving, and at the same time on the owners of the various services are also accompanied by the same property steward led by the property owners to increase the sense of identity of the owners of the property staff and to avoid unfamiliar staff to bring the owners of the insecurity factor.
3, butler service information:
A, the owner ordered the newspaper delivery (newspapers need to be ironed, free of charge)
B, leading the staff to complete the owner's request for housekeeping services (paid)
Indoor cleaning
Moving, moving things
floor, carpet cleaning and maintenance
on behalf of the collection of washing, mending, ironing clothes
on behalf of the collection of the property owners to wash, mending, ironing clothes
the property owners to improve the efficiency of problem solving.
Indoor cleaning
Moving and moving
Floor and carpet cleaning and maintenance
Collection of laundry, mending and ironing
Indoor flower arrangement and decoration
Purchase of daily necessities
Vehicle cleaning service
Household care management
Pet care management
C. Vehicle pick-up and delivery service for owners (paid and need to be booked in advance)
V. Safety and security management of the project:
1.
1, the daily work of the security department information:
24-hour fixed security post duty
24-hour mobile post security and fire patrol
vehicle parking safety management
special time periods of the road traffic, the flow of people, the management of the diversion of traffic
2, the security department's facilities and equipment:
the central control room
Access control intercom system connected to the central control room
Video surveillance system
Electronic patrol system
Smoke alarm system set up in the key parts of the owner's compound (kitchen)
Parking management system (if there is a large-scale public **** parking space needs to be managed)
Security equipment (walkie-talkies, fire extinguishers, truncheons, etc.)
3, security department facilities and equipment:
3, the security department to bring the commissioned special services:
Ceremonial security
short-distance guard (mainly for owners to carry valuables out of the personnel security guard)
(the above two services to bring the need for property stewards accompanied by a paid project)
Six, the establishment of emergency response system
The security of the owner's property is the key to the project's property management, in addition to bringing the general defense, should also establish a linkage system to ensure that in the event of emergencies in a timely manner to control the development of the owners of the loss will be reduced. Emergency response system process is as follows:
1, in case of emergencies, the owners through the access control intercom system to the central control room alarm (or directly to the property housekeeper);
2, the central control room after receiving the alarm were notified to the property housekeepers, area patrol security guards, security guards on standby rushed to the scene, to control the situation does not continue to develop;
3, the property housekeepers to the duty property manager to report the scene situation;
3, the property housekeepers to the duty property manager
4. The property manager decides whether or not to call the police based on the property manager's report on the scene. (110, 119, 120, 999, etc.)
2022 neighborhood property management work program 5
A property management public **** service quality standards
1, housing **** with parts, **** with the maintenance of facilities and equipment
(1) housing
(2) ) Coordination with the water, electricity and other professional departments to do a good job of water, electricity and other facilities and equipment for the normal operation of the protection of the work, and to ensure that the area sewerage, septic tank normal smooth operation.
(3) Sanitation facilities are intact.
(4) Roads are clear and smooth.
(5) Firefighting facilities are intact and ready for use.
2, security guard
(1) the main entrance and exit with a duty room, and the implementation of 24-hour duty;
(2) security guards 24-hour inspection;
(3) 24-hour monitoring of the community;
(4) traffic, vehicle management in order;
A, motor vehicle entry and exit registration, according to the rules of the road to ensure that the Roads are smooth.
B, motor vehicles parked in order.
(5) endangering the safety of users, with a clear sign and the development of preventive measures;
(6) emergency response plans, measures, in case of police can be timely alarm, and efforts to prevent the situation from deteriorating in the near one, to help protect the scene.
(7) no major fire, criminal and traffic accidents in the district.
3, greening and environmental health
(1) greening in line with planning requirements, reasonable layout, green coverage of not less than 30%;
(2) flowers, plants and trees are in good condition, no dead, no damage, no large-scale insect pests phenomenon;
(3) pruning in a timely manner, neat and beautiful;
(4) greening taste is high, there is high Ornamental value;
(5) all-round continuous cleanliness in the district;
(6) house facade is clean, public **** building and road is clean, no pile of debris present;
(7) water, electricity and other facilities and equipment is clean, water tanks are regularly cleaned, the water supply to fit the hygiene standard, no secondary pollution and hidden trouble;
(8) sanitation facilities are clean;
(9) no posting, hanging, scratching phenomenon;
(10) noise and other environmental standards.
4, fee management
(1) service personnel to do their duty, job responsibilities announced on the wall; property management fees are clearly marked;
(2) users take the initiative to participate in, support property management work, consciously maintain the environment, order, *** create polite neighborhood;
(3) the establishment of a fee management system, the responsibilities of the implementation of the person, every six months to the Owners Committee or property owners, users announced the status of the service fee income and expenditure;
(4) mode court to comply with the national fee policy, no unauthorized increase in fees and charges, raise the fee standard, and other arbitrary behavior;
(5) seriously receive and other complaints from the public and the establishment of the public complaints record, the effective rate of completion of the complaint more than 98%, 100% return visit rate;
(6) Owner feedback satisfaction rate of 90% or more.
5, the relevant conditions
(1) hardware environment
A, the community fit the planning requirements, no illegal structures, no unauthorized changes in housing use phenomenon;
B, the community buildings, buildings and other types of signs are obvious;
C, water supply, drainage, power supply, fire protection, landscaping, sanitation, and other facilities and equipment;
D, Parking lot classification (cars, motorcycles, bicycles can be stored separately);
E. Centralized monitoring equipment;
F. Supporting facilities for living services;
G. Educational, cultural and sports activities and business service facilities.
Second, the property management company to bring the service project (phased in gradually)
1, convenience services (part of the fee)
2, business services (part of the fee)
3, community recreation, cultural activities services
Third, the property management company
1, the company must hold a property management company qualification certificate;
2, the company must hold a property management company qualification certificate;
2, the company must hold a property management company qualification certificate;
2, the company must hold a property management company qualification certificate;
2, the property management company qualification certificate;
2, the enterprise to establish a modern enterprise system, a sound internal assessment system, job responsibilities are clear;
3, personnel training, licensed;
(1) enterprise practitioners uniform uniform uniforms, wearing badges;
(2) file management standardized, complete information;
(3) attentive to the use of new technologies, the extensive use of computer management.
Structure and appearance:
1, it is strictly prohibited to change and damage the original structure, appearance and public **** facilities, it is strictly prohibited to change the use of housing and ancillary facilities of the function, otherwise, Party B shall be responsible for the restoration of the original state;
2, is not allowed to demolish, knocking the indoor columns, load-bearing beams, etc., to avoid insecurity of the hidden;
3, floor to hit the impact of drilling should avoid the Water pipes, cables, etc., the depth shall not exceed 10 millimeters, if the damage caused by the decoration striking pipes or affecting other tenants, should be compensated for the loss and be responsible for repair.
Balcony and windows and doors:
1, it is strictly prohibited to close the balcony by themselves, add anti-theft railings and any other form of additions;
2, tiling shall not be tarnished the exterior wall, and if the condition occurs to be immediately cleaned;
3, it is strictly prohibited to alter the entry door, door sets;
4, it is strictly prohibited to install the anti-theft net on the windows, and prohibited to install the additional Burglar-proof door;
5, by the window part of the recommended decoration materials using waterproof materials, in order to avoid the future due to water seepage caused by the quality of change.
Pipeline:
1, it is strictly prohibited to change the kitchen, bathroom drainage (sewage) pipeline;
2, if the drain is buried in the wall, there should be an access port for easy access to the pipeline clogging;
3, deal with the sewage outlets, floor drains and the surrounding waterproofing, to avoid water seepage;
4, the recommended pre-buried in the wall of the pipe test pressure before closing. Then closed.
Kitchen and bathroom:
1, it is strictly prohibited to change the original location of the kitchen and bathroom;
2, according to the relevant provisions of the gas company gas pipe shall not be made any changes and buried in the wall, to avoid the existence of insecurity;
3, it is strictly prohibited to knock and change the public **** part of the ventilation duct well;
4, the ceiling needs to be made into an active The ceiling needs to be made into a movable or reserved inspection port for future maintenance;
5, the kitchen and bathroom has a waterproof layer, it is strictly prohibited to chisel the ground or gravity collision of water supply and drainage pipes, so as not to cause leakage, damage to the waterproof layer should be redone to avoid water seepage;
6, the installation of bathtubs, toilets, deal with the joints to ensure that the water flows smoothly, to prevent water seepage.
Intelligent facilities and pipelines:
It is strictly prohibited to change the intelligent facilities pipeline, unauthorized changes in the installation location of the equipment belonging to the intelligent system.
Air conditioning:
1, before the renovation should be determined before the placement of the indoor unit in order to facilitate the pre-buried pipelines and sockets;
2, air conditioning unit must be placed in the designated location, to ensure that the overall appearance of the unity;
3, air conditioning drip tube should be connected to the pre-buried condensate pipe.
2022 District Property Management Work Program Related Articles :
★ 2022 Property Work Summary Streamlined Version
★ Property Management 2022 Individual Work Plan
★ Property Management Work Plan Ideas 10
★ 2022 Property Work Summary Report
★ 2022 property work summary format sample
★ first half of the property work summary and the second half of the work plan five
★ 2022 property management work summary
★ 2022 property company work plan latest
★ property company 2022 annual work plan beginning five
★ property company How to write a work plan in 2022