Annual work summary, 22 Equipment Maintenance Worker, wrote 5 essays.

22 has passed in a busy and orderly work. Looking back on this year's work, you must have a lot of sighs. Then do a good job in annual work summary. The following is annual work summary, the equipment maintenance worker I arranged for you. I hope it will help you. Welcome to read!

annual work summary, an equipment maintenance worker

I have been engaged in electrical work in X Company since I joined the work in January of 2x. Among them, from January, 2x to June, 2x, the power supply and maintenance of electrical equipment and facilities in X Project X Machinery; From June 2x to June 2x, the maintenance of power supply and electrical equipment and facilities in X Project; I have been working as an electrician in X since June, 2x. In 2x years, he obtained the professional qualification certificate of senior electrician.

over the years, with the help and guidance of teachers, colleagues and leaders, and through continuous study and work practice, I have greatly improved my professional knowledge and maintenance technical level. I have done my job well and achieved some achievements. The work in the past few years is summarized as follows:

1. Actively work and earnestly complete the tasks assigned by the leaders.

Company X is a professional team mainly engaged in geotechnical engineering construction, and its construction features are large electrical equipment capacity, many electrical equipment, short construction period and open-air operation. Electricians are responsible for the selection, layout, layout, installation, inspection and inspection, maintenance, demolition and electrical maintenance after construction.

through years of electrical construction work, I can successfully complete the selection, arrangement, layout, installation, inspection, maintenance and removal of electrical equipment in large-scale construction projects in strict accordance with the requirements of the organizational design of construction electricity consumption and the Technical Specification for Temporary Electricity Consumption on Construction Sites, and participate in the compilation of the organizational design of temporary electricity consumption on construction sites of several projects, so that all construction projects can meet the national technical standards for temporary electricity consumption safety.

such as: x-path, x-path, etc. During the construction, we worked actively, strengthened the education on site construction electricity management and safe electricity use, conscientiously implemented the post operation rules and abided by various electricity safety management systems. No electrical injuries and electrical equipment accidents occurred in the construction projects we participated in, which created good social and economic benefits.

2. Pay attention to continuous learning, and strive to improve my professional knowledge and business level

After I joined the work, I continued to participate in the school, society and learn the knowledge of electrical engineering, construction and safety technology through self-study, so as to continuously improve my professional knowledge and business level.

The main technical study and training are:

1. September 2x-July 2x; _

2. November in 2x-December in 2x; _

Through continuous study, I have mastered professional knowledge such as Fundamentals of Electrician, Electrotechnics, Power Supply in Factory, Technical Specification for Temporary Electricity Use in Construction Site, Safety Technology in Construction, Safety Management in Construction, etc., so that my safety knowledge and awareness have been greatly improved, and I have continuously applied my learned knowledge and technology to production and construction.

Due to the different types of pile foundations, the mechanical equipment used in geotechnical construction is also various, such as common mud wall-protecting bored pile drilling rig, long spiral bored pile drilling rig and precast pile hydraulic press. Mixer, dosing machine and delivery pump for concrete mixing and conveying; It is the electrician's duty to do a good job in the maintenance and electrical overhaul of butt welding machines and electric welding machines used for steel bar welding. The construction of pile foundation is a coherent process. If there is any problem with the electrical equipment of the drilling rig in the grouting process, it must be repaired as soon as possible to ensure that the borehole is grouted before the initial setting of concrete. Through years of study and practice, we can find out the fault source in a short time and repair it well. Over the years, we have repaired a large number of construction electrical equipment and ensured the normal construction of geotechnical engineering projects.

Third, pay attention to technological innovation and transformation, and achieve safety and energy-saving effects

In recent years, the company has continuously encouraged technicians to carry out technological innovation in production and technology. According to the stipulation that AC welding machinery should be equipped with secondary side electric shock protector in the Technical Specification for Temporary Electricity Use in Construction Site, I made a suggestion to the company at the end of 2x, and the company quickly replied and popularized the special switch box for welding of electric welding machine supervised and manufactured by the safety supervision station, which not only implemented the Technical Specification for Temporary Electricity Use in Construction Site, but also achieved great results in safe electricity use and energy saving.

during the construction, the electrician operation team constantly carries out technical innovation and transformation on the electrical system of the equipment. For example, in the X-way project in August of 2x, the electrical system of the X-way distribution box purchased by our company in 2x was obsolete, and the static and dynamic contacts of contactors were often damaged. After research, our electrician operation team found out the problems, and completely updated the distribution box of the long spiral drilling rig during the construction interval, so that the equipment started to run normally, the electrical troubleshooting rate was reduced, the construction efficiency was greatly improved, and the project was successfully completed within the planned construction period. After the construction of each project, the company will organize electrician technicians to maintain electrical equipment and facilities. Over the years, I have participated in the maintenance of many electrical equipment and facilities, straightened out the power lines of equipment and replaced unqualified electrical facilities. It has made positive contributions to the company's safe production.

fourth, actively teach the technology you have learned, and pass on the knowledge and skills you have learned and accumulated in production practice to new employees without reservation.

in my usual work, I often have technical discussions and exchanges with other employees, share what I have learned with everyone, and learn what I don't know from others, so as to make progress together. Under my guidance, two electricians in X Company passed the examination and obtained the post qualification of senior engineer, and were able to independently complete the electrical maintenance task assigned by their superiors. Three electricians passed the examination and obtained the post qualification of intermediate engineer, and were able to basically complete the electrical maintenance task, effectively alleviating the tension of the shortage of electricians in construction projects.

5. Strengthen the education on safe use of electricity and energy saving for employees, and constantly improve their awareness of safe use of electricity and concept of energy saving

In recent years, while doing my job well, I have continuously strengthened the education on safe use of electricity and energy saving and consumption reduction for employees, made full use of my spare time to go into construction teams and dormitories to explain the knowledge of safe use of electricity and energy saving and consumption reduction, and organized the publicity of "Questions and Answers on Safe Use of Electricity in Construction" and "Energy Saving Week". So that the knowledge of safe electricity use of the employees in the unit can be improved, and the energy can be saved consciously.

6. Correct attitude and work hard actively

For many years, I have remembered the firm belief of "safety first, hard work" in my heart. I am a senior technical worker of electrical maintenance in party member, and I have to be slack and sloppy in my work. Only by earnestly observing and implementing the rules and regulations on safety production, assiduously studying and enterprising, and doing down-to-earth work can we put an end to electricity accidents.

All these honors are the encouragement and spur to my work. I will continue to strengthen my own study and learn from each other's strengths. Only in this way can I keep up with the pace of the times and make steady progress, and can I better serve my unit and society.

annual work summary, an equipment maintenance worker

I started my internship in the maintenance section of shell factory, and it has been more than two years since I graduated from Metallurgical College in July of X. During this period, I am diligent and work hard. It has gradually grown from an ignorant student youth to a little "master" who knows a little about mechanical maintenance, maintenance and safety.

during my work and study in the company, I abide by various rules and regulations of the company every day. Never arrive late, leave early, seriously receive the teachings of the masters, and actively learn all kinds of maintenance techniques. Now through more than two years of study, I have been able to independently judge the maintenance of equipment when I encounter small problems. For example, the replacement of the tool rest on the six-axis in Shenyang and the replacement of the parts of the gearbox, including the more difficult secondary maintenance and replacement of the spindle bearing, can be operated independently. When I encounter a big equipment problem, I can also coordinate with the masters to solve it. For example, the gear replacement on the cutting and upsetting machine, the replacement of cold-extruded crankshaft bushing, and the key matching work of Shenyang six-axis distribution shaft. It has been well received by leaders and masters.

In October of X, I transferred to Shell No.2 Factory to continue my maintenance work, and started a new work course on a new working platform. Here, I not only did my maintenance work well, but also got in touch with the knowledge about mechanics. For example, all kinds of equipment reports, safety knowledge, equipment spare parts inventory and planning. In addition, the most important thing is to start the transformation and digestion of the equipment. Now there is still one Delphi six-axis in the process of digestion, and I believe it will be digested by the end of the year. In addition, because the equipment consumption of the cutting and upsetting machine is too large, I am also actively participating in the debugging of the new Dan Chong purchased by the company. At that time, the company will completely get rid of the bad production environment of high consumption and high cost of the cutting and upsetting machine. And the company is about to produce the screw of Outlett now, and the output will be multiplied several times, so the screw equipment will be very tight. So now I am actively participating in the debugging and transformation of screw equipment to lay a solid foundation for the future.

In addition, I would like to put forward some simple opinions on some equipment management in the shell factory:

1. As we all know, "If a worker wants to do a good job, he must sharpen his tools first, and if he wants to improve the output and product quality, he must adjust the equipment to the state. However, some of these equipments have some problems. For example, the feeding and pressing structure of Delphi integral screw machine can be directly controlled by the operation panel, and the operator sometimes does not need the feeding mechanism to feed when adjusting the equipment. At this time, the operator only needs to press a button, which is simple and convenient to operate and saves time and raw materials. However, the feeding mechanism of Antuo integral screw machine is a mechanical method. If the operator does not need to feed, he has to go to the end of the equipment to loosen the screws, and then tighten the screws after adjustment. However, it is often necessary to adjust the product model several times, which has wasted a lot of time. If the screws are not loosened and adjusted directly, it is easy to crush the mold. It's really not worth the candle. The device actually has this function, but it doesn't work after a long time, so as long as you add controls similar to Delphi devices, you can save a lot of adjustment time and mold costs for Antuo devices.

two: our company's current maintenance system is a centralized maintenance system, and the maintenance department is responsible for the equipment maintenance of the whole factory. The operators will not help the maintenance workers, and the maintenance workers will not help the operators to look after the beds. This system is the most prone to buck passing, and it can't deal with the problems in time, which affects the maintenance efficiency. Therefore, the first thing we have to do is to break the "operator only cares about operation, regardless of maintenance;" The habit of maintenance workers only care about maintenance, regardless of operation; Instead, we should guide everyone to do it: operators should not only take the initiative to clean the equipment, but also take the initiative to take part in equipment troubleshooting, combine the point inspection, maintenance and lubrication of the equipment, and actively check and maintain the equipment to improve the equipment condition while cleaning. Because a large number of equipment failures are due to the failure of maintenance and lubrication work. For example, there are many six-axis equipment in Shenyang, and the spare parts of the equipment are expensive (it costs thousands of dollars to change the spindle bearing once). However, the operation of Shenyang Six Axes is basically the transmission between cams and gears, and the spare parts wear a lot, so the lubrication work is particularly important. Therefore, it is suggested that the oil circuit should be cleaned every weekend. If it is done properly, the cost of spare parts for our equipment will be greatly reduced.

third, it is suggested that computer management of equipment account can be established, just like turning on the computer at any time can always see which equipment produces the product model, quantity, shortage and so on in the current month. The computer management of the equipment account is to randomly check the factory number, equipment name, equipment model, equipment specification, manufacturer, putting-in-service time, user, etc. of all the equipment in the company, and at the same time, randomly check the use status of each equipment. When troubleshooting machine tools, maintenance personnel are required to fill in the "Equipment Maintenance and Troubleshooting Registration Form" to register the reasons, troubleshooting methods, spare parts used, etc. of all kinds of troubleshooting, and the troubleshooting time, responsible person and operator's approval should be carefully filled in and signed, just like the management of the company now. Rather than a simple equipment maintenance record. This is not only an assessment of maintenance personnel, but also an important basis for fault statistics at the end of the year to find out the law. This will help us to sum up the maintenance experience of machine tools in time, classify faults and count data, and bring great help to sum up the experience for spare parts ordering and maintenance in the future.

annual work summary, an equipment repairman, spent three years in busy and orderly work. Looking back on this year's work, I think there are two main aspects:

1. Formulating my own work standards:

1. Doing every job according to the safety standard process to prevent safety accidents;

2. Visit the store at least once a month, communicate with the store management in time about the problems found in the inspection, directly solve the problems that can be solved on the spot, give feedback to the department leaders in time about the problems raised by the store, do the work that needs to be done well in the shortest time, find them in advance and solve them quickly, so as to nip in the bud;

3. Adjust the major circuit renovation work of the store, make plans in advance, prepare materials, and resolutely do not delay the renovation of the store to ensure high-quality and efficient completion of the work;

4. communicate with the store on the phone for sudden problems with electricity facilities, preliminarily estimate where there is a problem, and lead relevant personnel to prepare relevant objects and tools, so as to quickly eliminate the fault after arriving at the site;

5. Adhere to the principle of saving: try your best to repair the damaged goods in the store, and do not replace them with new ones. Choose the ones that really need to be replaced with high quality and low price, and collect and sort out all kinds of materials that can be reused (such as plugs, etc.) for reuse;

Second, the main work in the past year:

In January and April, the main work was the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket. In one month, with few staff, tight time and high requirements, I took the initiative to take the lead, carefully studied with my colleagues in the equipment department, strictly laid out and standardized the construction, ensuring that the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket were completed on time and with good quality;

in February, the main work was the renovation and opening of major appliances in Xin' an Shopping Plaza. Due to the tight time, there are many places where home appliances need electricity, and it also involves the brand and the layout and construction of the booth. According to the company's requirements, as well as the work flow, we worked overtime and rigorously, so that all the electricity facilities were successfully installed and successfully tried once, which made preparations for the equipment work for the smooth opening of home appliances in Xin' an Shopping Plaza on May 1.

March, June and September are mainly the renovation and adjustment of the East Building of the Head Office and the preparations for the opening of Zhuoting Supermarket. The renovation of the east building of the head office is this year's project, which involves many facilities and heavy workload. Replacement of escalators, adjustment of circuits, decoration of ceilings, and various special