High winds and heavy rain storm emergency plan

High winds and heavy rain storm emergency plan 1

Flood season rainy season is coming, in order to ensure that the community and the underground garage safe drainage, to ensure that the owners of the vehicle parking safety, to ensure that the owners of the normal order of life, according to the spirit of the work of all levels of flood prevention and control and the work of the requirements of the flood control and prevention of flood control for many years, combined with the actual situation of the XXXX community, especially the formulation of flood control work emergency plan. We hope that our XXXX management office supervisors can play their respective roles, give full play to the leadership of supervisors, lead the staff of all departments, and make every effort to do a good job in the flood control period of the work.

First, the establishment of flood control work emergency leadership group

Group leader: XXX

Group members: XXX, XXX

Emergency team: management of the management of all departments in charge of the office, office staff, engineering and maintenance personnel, all the security personnel

Second, the flood control work Duties

1, conscientiously implement the implementation of the city, the district property on flood control and drainage instructions, the overall command of the XXXX neighborhood flood control work. In accordance with the emergency leading group personnel arrangements, fast, timely and effective disposal of XXXX cell flood control work in all types of sudden disasters. Take effective measures, based on the district, adhere to the self-protection, self-help, to ensure the safety of the district flood season.

2, prepare enough flood control materials, according to the emergence of dangerous situations, the proposed drainage, rescue programs. Responsible for checking and supervising the implementation of flood control measures; responsible for checking and supervising the preparation of flood control items; to ensure that the owners of the normal order of life and property safety, to put an end to the community depression areas of poor drainage and water storage in the basement and other issues.

Third, flood control requirements and measures

1, the establishment of the flood control leadership team and rescue team. Specifically responsible for flood control work in the area to ensure the safety of flood and property owners from loss; timely collection of rain, flood and other information; do a good job of flood control publicity to enhance the awareness of all owners of flood control; to ensure that no accidents occur. During the flood control period to ensure smooth communication, flood control members and duty personnel to do 24-hour phone. Duty personnel should stick to their posts, and are strictly prohibited from leaving their posts and taking off work. In case of heavy rain, the manager and all levels of supervisors, security team leader must be on duty, office staff to do cell phone is not off.

2, the establishment of security responsibility system. Management office leaders will be specific work distribution in place, so that each area has a direct responsibility. Can not be on time to the post personnel and not seriously responsible for losses caused by the implementation of accountability, resulting in significant losses to be held accountable.

3, contact work. Security department should have car owners to carry out regular security tips, and do a good job in the basement vehicle parking order. Customer service personnel should understand that all underground garage owners communication contact, if necessary, notify the owners, cooperate with the work of security evacuation. In the event of heavy rainfall, should pay close attention to the rain situation and the area of the relevant road smoothness, do a good job with all owners to contact the preparatory work.

4, material preparation and specific duties of each department. According to the actual situation of XXXX neighborhood, the key parts to strengthen the patrol; the division of labor of each department is clear; to do before the rain, rain, rain, there are people responsible for monitoring; and make the appropriate measures to eliminate risks; the following is a clear division of labor and responsibilities of each department:

Finance: make every effort to protect the Department of Finance, life and property safety. If there are special circumstances need to immediately report to the higher authorities. Self-protection at the same time, to assist other departments to do a good job of disaster relief.

Public **** Division: When the flood came, the customer service center to do a good job and all the owners of the warm tips between the work of the disaster is relatively serious several floors, to focus on recording the flood information, if necessary, notify the owners by phone to inform the details. If the owners call for help, they should record the detailed address of the owner (floor number, unit number, room number, contact information), and immediately report to the higher authorities to apply for reinforcements.

Greening and Cleaning Department: Fully do the flood season green vegetation protection work and district cleaning work. In bad weather, take relevant measures to protect the growth of plants and trees. After the rain, do a good job of community hygiene cleaning work, so that every corner of the community always keep health and clean. Let live in the owners feel the environment fresh and natural, through our efforts to make the neighborhood owners live in a better environment. If there are owners of the house or warehouse water phenomenon, should cooperate with the Ministry of Engineering immediately went to help owners to do a good job cleaning and drainage work.

Engineering Department: Engineering staff should regularly check the water and electricity equipment in the district, flood season should be appropriate to increase the frequency of inspection to ensure the normal use of equipment and safety. Check the smoothness of each drainage pipe and emergency use. Rescue materials in case of danger include:

(1) Emergency lamps and lanterns should be sufficient power for night use.

(2) a number of sandbags, sandbags placed in the terrain of the lower entrance place, can play a role in intercepting the flow, to avoid the upstream rainwater pooling to the lower regions, resulting in danger. Several easy to accumulate water floor in the district are A1, A3, A5, C1 and several other places, to pay close attention to the accumulation of water. Immediately after the end of the disaster, the sandbags should be moved away to a hidden area, and do a good job of protection, so as not to affect the next use.

(3) Prepare 5 shovels, 5 steel bars with hooks, if necessary, dredge the sewers, or directly open the sewer manhole cover, which can speed up the flow of rainwater into the sewers, to avoid rainwater rushing into the lower ground garage or warehouse. Immediately after the end of the disaster to place the well cover to the original place to avoid danger.

(4) Drainage equipment, drainage pumps and drainpipes should be placed in easy to reach and easy to put place, and regularly check the work of the equipment. In case of part of the pipeline drainage is not smooth, the application of drainage pumps will be discharged to other smooth areas of the water in this area. Clean and store after use.

Security Department: do a good job of flood safety and security, if there is a call for help or reinforcement, should be the first time to the scene, do a good job of rescue and defense, such as special circumstances should be immediately reported to the higher authorities, in the critical moment to help the owners to solve the problem.

Fourth, according to different circumstances to start the corresponding plan

(a) the first plan:

When the weather station issued a rainstorm warning, the leading group of flood control work all in place. Summarize flood control information in a timely manner, inform the wind, water and rain. Office staff according to their respective duties, strengthen the duty, further check the implementation of the flood control emergency measures, the formation of flood control rescue teams, the implementation of emergency supplies.

(B) the second plan:

When the rainstorm hit or the relevant departments issued an emergency alert, the flood control leading group immediately convened an emergency flood control meeting or emergency deployment. Property Office to flood control as the overriding work of the top priority to grasp.

(C) the third plan:

In case of torrential rains and sudden disasters, the rescue team quickly organize personnel to check and unblock the drainage pipes in a timely manner, so that the drainage is smooth; monitor the water inside the community and the basement, and report the situation in a timely manner, and timely organization of sufficient temporary drainage equipment for strong drainage when necessary. Ensure that the owners of the normal order of life and property safety.

The above groups of departments should be conscientious, safe flood, to ensure that the owners of life and property and public **** property safety, the more critical the moment the more organized and disciplined we should be; the critical moment of righteousness and courage to be the first, not afraid of danger. Always put the interests of owners in the first place. Let the leadership of the head office to rest assured that the owners are satisfied with our obligations.

The wind and rainstorm emergency plan 2

First, the overall requirements

Adhere to the "safety first, unremitting, prevention-oriented, all-out rescue" policy, seriously do a good job of flood prevention, flood resistance of the various preparations. Ensure the smooth drainage of the ditch and river, to ensure the safety of the masses of housing, minimize disaster losses, especially to ensure the safety of human life in the first place.

Second, the main measures

This year's flood control work should continue in accordance with the "flood control, flood resistance" standard to prepare, adhere to the flood control, in addition to flooding and ensure flood safety, and strive to mitigate the disaster losses, to ensure that the urban and rural masses of the production and life of normal. Conduct. Focus on the following work.

(a) to carry out a dangerous house census registration

Offices, administrative villages to the jurisdiction of the dangerous house for a net check, there is a large security risks, unsuitable for living in the house, to be resolutely closed to ensure that the people's lives and property safety.

(B) to keep the flood discharge ditch open

Nanguanguan ditch, Beiguan ditch and Gu Caihe is the main flood discharge channel in my town, the offices, administrative villages should be clear that the management of the person, the siltation of debris in a timely manner to clean up, to ensure that the river is unobstructed.

(C) to do a good job of rural field drainage

Field drainage project is a weak link in the town of flood control and drainage, but also caused by the local crop damage to the important reason for the reduction of production. The administrative villages to the village group as a unit, actively mobilize the masses, the organization of a strong field commando, through the ground ditch, bamboo ditch, pillow ditch, clear the ridge, road dam, so that the small communication ditch, large communication river, focusing on solving the ground does not pass the ditch, ditch does not pass the river, the problem of field drainage without a way out.

(D) improve urban drainage desilting

The offices should be the jurisdiction of the low-lying, water-prone areas to do a good job in the census of the drainage network, and urgently complete the desilting of the network to remove the obstacles to blocking the water to ensure that the drainage is unimpeded. Small streets and alleys sewer cleaning, by the offices responsible for organizing the implementation of local people. The main urban drainage pipe water problems, the town party committee government is responsible for writing a special report to the county government, urging the city construction department to implement as soon as possible desilting.

(E) organization of flood control emergency team

According to the requirements of the county flood control target responsibility, by the town government to organize 50 flood control emergency detachment, the offices, administrative villages should also be organized not less than 20 people of the flood control team, the town's emergency flood control force to reach more than 700 people. Flood control teams at all levels should be clearly responsible for, registered, implemented, must do the idea, leadership, organization, materials, technology in place, to ensure that in case of danger, pull out, grab, hold.

(F) do a good job of preparing flood control materials

Town finances will be 200,000 yuan of flood control funds into the budget, while in accordance with the "preparedness, not set, with the payment" approach, the quality and quantity of good woven bags, wire and other flood control materials reserves, woven bag reserves to reach 20,000, wire to reach 2,000 pounds. The reserve of woven bags should reach 20,000, and the wire should reach 2,000 pounds or more. Standing material is responsible for, strictly prohibited misappropriation, to ensure that the preparation of sufficient, transportation, use.

Three, strengthen the leadership

Seriously implement the executive head of the system as the core of the responsibility of the flood control system. The town government set up a flood control work command, by the mayor of Wang Yanli as the commander, party secretary Liu Congxiu as a political commissar, all the leadership team as members, and effectively strengthen the leadership of the flood control work. Offices, administrative villages should also be set up accordingly leadership organization, clear office branch secretary, administrative village branch secretary is the first responsible for the work of the unit flood control.

Fourth, strict discipline

Flood control is a matter of concern, the offices, administrative villages to establish and implement the concept of scientific practice, the construction of a harmonious society. Height, fully recognize the importance of flood control and rescue, and effectively strengthen the sense of responsibility and sense of mission, and effectively put the flood control work into practice. Town, office, the village should adhere to the 24-hour duty system, pay close attention to rain, water, disaster conditions, to ensure that the flood information up and down and the implementation of the flood control command orders, in the flood control period of negligence, ineffective work resulting in serious consequences, we must seriously pursue the relevant leaders and the parties involved in the responsibility; the circumstances are serious and constitute a crime, be held criminally liable according to law. In the flood control, rescue and relief work in making outstanding contributions to the units and individuals, to be recognized and rewarded.

Gale and rainstorm emergency plan 3

In order to ensure the safety of life and property of teachers and students in our school, to ensure the healthy development of education, according to the national, provincial, municipal and county documents on flood prevention and control of the spirit of the work of the flood control emergency plan.

First, the guiding ideology and basic ideas

With a highly responsible attitude towards the party and the people, in accordance with the flood control work, "block-based, combined with the article, the article to ensure that" the principle of the implementation of the responsibility of the flood control campus leaders responsible for the system of fast, timely, effective and dispose of the school flood control work in the event of an emergency. Dispose of school flood control work in the various types of sudden disasters and accidents.

The basic idea is: adhere to the flood control, disaster prevention: "safety first, prevention first", to ensure that our teachers and students safe flood.

Second, the content of the flood emergency plan

(a) the first plan

When affected by a typhoon or a strong tropical storm winds up to 8 or more, torrential rainfall of more than 50.1 millimeters of rain per day or meteorological and other relevant departments to release the torrential rainfall will be up to the starting standard, the person in charge of the must be put in place to strengthen the duty, the strict implementation of the reporting system, to achieve the top of the situation, the bottom of the report. Duty leaders and personnel encountered emergencies or disasters, timely issuance of temporary emergency disposal instructions, and quickly report to the Education Bureau. The duty administration to do a good job of flood control duty records, check the campus flood control duty to the post in place.

(ii) the second plan

When the weather station issued a rainstorm warning, all members of the school flood control work leadership team in place. And timely notification of flood control information to all departments, informing the wind, water and rain conditions. Departments should, according to their respective responsibilities, strengthen the duty, further check the implementation of various flood control emergency measures, the formation of various types of flood control rescue teams, the implementation of emergency supplies.

(C) the third plan

When the rainstorm struck or the county departments concerned issued an emergency alert, the school flood control work related personnel to enter the command post according to their respective duties. And immediately through the LAN or telephone emergency deployment. Departments should take flood control as the top priority of the overriding work to grasp, and the implementation of various flood control emergency measures.

(D) the fourth plan

When the rainstorm sudden disaster weather, the school should quickly organize personnel to timely check and dredge the underground drains, so that the drainage is smooth; to organize a special force, the school is prone to collapse, prone to landslides, prone to waterlogging to monitor the situation, and timely reporting of the disaster, timely organization of sufficient temporary drainage facilities for strong drainage, if necessary. Ensure that the lives and property of teachers and students safety.

When the storm hit, the timely collapse of the school building, teachers and students injured in the first time to report the county education bureau flood control office, and promptly find out whether there is a person trapped, such as the discovery of people trapped, to quickly organize rescue, and do a good job of the injured rescue work, transfer and resettlement of teachers and students, according to the situation of the disaster, contacting the relevant departments in a timely manner to the scene, and do a good job of rescue, transfer and resettlement of affected teachers and students work.

Three, flood control and Taiwan leading group and member duties

Flood control leading group

Leader: xx

Deputy Leader: xx

Members: xx

Office Director: xx

Responsibilities: xx

Leader: under the leadership of the county education bureau flood control office, the county education bureau, the county education bureau and the county education bureau. Education Bureau under the leadership of the Office of Flood Control, the implementation of the County Flood Control Command instructions, the overall command of the campus flood control work.

Deputy head: according to the campus of the dangerous situation, for the head of the group to put forward drainage, rescue programs. Timely analysis and summary of the flood water and disaster conditions, for the leader of the decision-making to provide a scientific basis. According to the instructions of the team leader, command the rescue team to carry out rescue. Organize enough flood control materials to be delivered to the rescue site. Contact the medical department, mobilize medical personnel, medical equipment, medical teams to participate in rescue and relief work. Contact the public security department to maintain school traffic order, organize the evacuation and transfer of teachers and students, responsible for school stability. Coordination and organization of schools to quickly resume teaching activities.

Members: in the school flood control leadership group. Under the unified command, responsible for checking and supervising the implementation of flood control measures, responsible for checking and supervising the campus flood safety; responsible for checking and supervising the availability of emergency supplies, to ensure the supply of essentials for teachers and students of the affected schools; responsible for the closure and demolition of dangerous houses, and to do a good job in the school of disaster prevention, disaster prevention and disaster relief and post-disaster resumption of teaching and learning activities of the guidance work. Ensure the safety of teachers and students, to eliminate casualties.

High wind and heavy rainstorm emergency plan 4

With the arrival of the rainy season, according to Liuyang City Safety Supervision Administration on the safety of non-coal mine enterprises to do a good job in the current period of the safety work of the notification of the flood prevention and flood control work is imminent. My mine in order to safe flooding, the development of flood prevention and flood control emergency plan, set up a flood control and flood control leading group, and equipped with sufficient supplies, equipment and other flood control supplies, to ensure that the mine is safe and smooth through the flood season. Its emergency plan is as follows:

First, emergency principles:

I mine adhere to the prevention-oriented, prevention and robbery combined, unified command, unified scheduling, the principle of obeying the overall situation, carry forward the spirit of unity against floods, in the mine flood control leading group under the unified guidance of the positive cooperation, unity, to ensure that the mine safe flood.

Second, the work plan:

Develop a flood prevention and flood control safety management system, and to do all the members of the flood awareness, and the system will be implemented to the various shifts, personnel. Timely flood safety education and flood control and flood control safety responsibility education. Frequently check the preparation of flood prevention and flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen the logistical support and service work, to ensure that personnel, materials, equipment and site work all safe.

Third, the establishment of the flood control front command, clear responsibilities:

Commander-in-chief: xxx

Deputy Commander-in-chief: xxx

Members: xxxxxxxxxx

Commander-in-chief: the whole mine within the scope of the overall responsibility of flood control, unified command of the work of flood control.

Deputy commander-in-chief: responsible for the implementation of the first program, mobilize flood personnel and the required materials. Timely preparation of rescue equipment, according to the order of the commander-in-chief quickly run to the designated location, and is responsible for relief personnel accommodation and other matters.

Members: the implementation of the instructions of the commander-in-chief, responsible for the supply and reserves of flood control materials, equipment deployment and transportation and rescue work of all related matters. Medical group: Nanyue Village Health Center staff, responsible for the treatment of personnel injured in the rescue process.

Fourth, the emergency program:

(1), the establishment of the mine director as the command of the front line of the flood control headquarters, division of labor, clear responsibility, to ensure that the responsibility to the person, strengthen the scheduling, to do all the action command, all actions listen to the command, the flood season, the arrangement of the site of the special person on duty, and set up the flood control and flood rescue team.

(2), do a good job of material supply plan, arrange for the preparation of flood prevention and flood control materials, before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.

(3), put into the rescue site of the loader, generator Yew strengthen maintenance and repair, to ensure that the flood season comes when the equipment can operate normally, special period can give full play to the emergency role of the equipment.

(4), the ground by the flood threatened materials and equipment, by the mine commander-in-chief of the unified arrangements, as far as possible to carry to the high safety zone.

(5), the commander-in-chief according to the water level changes, the organization of flood control team members as far as possible to dredge the flood channels, to minimize the loss of property in the mine.

(6), the custodian group by Xie Xiyuan is responsible for, in accordance with the requirements and instructions of the command, the issuance of anti-flood flood rescue work required tools, materials and supplies, to ensure that the flood rescue work can be carried out smoothly.

(7), the medical group by the Nanyue village health center medical staff. Medical personnel in the rescue period, to be on the spot for the rescue process of the injured personnel for timely treatment, for the more serious injuries, to be sent to the hospital in time for treatment.

(8), the car group by Xie Haibo is responsible for the rescue period to have enough cars to transport the injured and medical personnel.

(9), the communication group by Xiong Shanbao is responsible for the accident is responsible for convening the flood rescue personnel and contact the relevant units of the higher level, and timely report to the commander-in-chief of the higher level of the relevant spirit and instructions.

(10), if the accident is too big, the unit can not handle the situation, should immediately notify the mine rescue team to request rescue. Note: This emergency plan can only be activated and implemented after a flood accident.

High wind and heavy rainstorm emergency plan 5

First, my school around the basic situation of water

My school is located in the back of the train station, Tuzhuang railroad bridge hole is the school must be passed, the terrain is treacherous, a lot of vehicles, the hole year-round accumulation of water, the rainy season is flush with the waist-deep water, the teachers and some of the students pose a great threat. In addition, our school is located in the western part of Tuzhuang Village, there is a reservoir, unguarded, there are often children to bathe there, very easy to cause drowning accidents, for our students, is a big safety hazard. Our school building is aging and outdated, in disrepair, with cracks in the house, which also poses a safety hazard.

Second, the guiding ideology of flood control work and measures

The guiding ideology of flood control work is: to put the flood control work on an important position. Adhere to the "safety first, prevention-oriented" principle. Flood control measures are: ① implementation of the flood control system of responsibility, the implementation of the "unified command, division of labor, active guidance" principle; ② flood discharge channels are strictly prohibited during the flood season, blocking and piling up debris; ③ to keep the flood control road open.

Third, the flood control work leading group

Leader: Song Jun

Deputy Leader: Zhang Yang, Yang Hui

Members: Li Hongmin, Pan Guihua, Wang Xiuying, Feng Yujiao Command: the task of organizing the rescue and the safe transfer of teachers and students, and report to the superiors in a timely manner to report on the development of the flood situation, and the logistics headquarters. Coordination of rescue personnel and flood control material arrangements.

Commander: Song Jun

Under the two groups:

Technical staff group: the task is to grasp the wind, rain, water conditions. Pay close attention to the weather changes and flood conditions, the development of dangerous conditions, as a good staff, to provide rescue decision-making program.

Leader: Zhang Yang

Members: Feng Yujiao, Gu Jia

Risk group: the task is to rescue, and the risk of timely report to the commander-in-chief.

Leader: Zhang Yang

Members: Xu Baosheng, Yang Hui

Logistics Command: responsible for organizing, coordinating and guaranteeing the supply of flood control materials. By Pan Guihua is responsible for.

Fourth, emergency action plan in case of disaster and danger

In case of rainy days, the first party member Feng Yujiao teacher to the south side of the bridge to survey, to determine the teachers and students to pass through the no danger, in order to release students, such as can not be safely passed, then arrange for the teachers and students to choose other routes; the establishment of a contact network for the students, notify the parents of the pick-up and drop-off, or make other arrangements to ensure the safety of the teachers and students. The company's website has been updated with the latest information about the company's website.

Summer and holidays to students for safety education, warning them not to go to the reservoir and other places to play, swimming, such as going to be sure to have an adult to go with.

When there is a possibility of danger, the people concerned should strengthen the duty and patrol, and report to their superiors and village committees.

In case of danger, quickly organize rescue and report to the education bureau and school district.