Three preventions in rainy season and three preventions in winter emergency plan

Three Preventions in Rainy Season and Three Preventions in Winter Emergency Plan 1

With the arrival of the rainy season, according to the Liuyang Municipal Safety Supervision Administration’s notice on the current safety work of non-coal mining enterprises, flood prevention Flood prevention work is urgent. In order to survive the floods safely, our mine has formulated an emergency plan for flood prevention and flood prevention, established a flood prevention and flood prevention leading group, and equipped with sufficient materials, equipment and other flood and flood prevention supplies to ensure that the mine safely and smoothly passes through the flood season. The emergency plan is as follows:

1. Emergency principles:

Our mine adheres to the principle of focusing on prevention, combining prevention and robbery, unified command, unified dispatch, obeying the overall situation, and carrying forward the principle of unity to fight floods spirit, under the unified guidance of the Mine Flood Control Leading Group, actively cooperate and unite to ensure that the mines survive the floods safely.

2. Work plan:

Develop a flood prevention safety management system, ensure that all members have flood prevention awareness, and implement the system to all teams and personnel. Timely conduct education on safe flood preparedness and safety responsibility education on flood prevention. Regularly check the readiness of flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen logistics support and service work to ensure the safety of personnel, materials, equipment and on-site work.

3. Establish a frontline flood control headquarters and clarify responsibilities:

Commander-in-Chief: xxx

Deputy Commander-in-Chief: xxx

Members : xxxxxxxx

General Commander: Responsible for overall mine-wide flood control and unified command of flood control work.

Deputy Commander-in-Chief: Responsible for implementing the preemptive plan and mobilizing flood-fighting personnel and necessary supplies. Prepare emergency equipment in a timely manner, quickly move to the designated location according to the commander-in-chief's orders, and be responsible for the food, accommodation and other matters of the disaster relief personnel.

Members: Carry out the instructions of the commander-in-chief and be responsible for the supply and storage of flood control materials, the deployment and transportation of equipment, and all related matters of rescue work. Medical team: composed of staff from Nanyue Village Health Center, responsible for treating those injured during the rescue process.

4. Emergency plan:

(1) Establish a frontline flood control headquarters under the command of the mine director, divide responsibilities, clarify responsibilities, ensure that responsibilities are assigned to people, and strengthen dispatching, Ensure that all actions are directed and all actions are subject to command. When the flood season comes, assign dedicated personnel to be on-site and set up a flood prevention and rescue team.

(2) Make a material supply plan and arrange the preparation of flood control materials. Before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.

(3) The loaders and generators deployed at the rescue site should be maintained and repaired to ensure that the equipment can operate normally when the flood season comes and that the equipment can fully play its emergency role during special periods.

(4) Materials and equipment on the ground that are threatened by floods will be arranged by the mine commander and moved to high safety areas as much as possible.

(5) The commander-in-chief should organize flood control teams to dredge flood drainage channels as much as possible according to changes in water levels to minimize property losses in the mine.

(6) The custody team is headed by Xie Xiyuan, who must distribute the tools, materials and supplies needed for flood fighting and rescue work in accordance with the requirements and instructions of the headquarters to ensure that the flood fighting and rescue work can proceed smoothly.

(7) The medical team is headed by medical staff from Nanyue Village Health Center. During the rescue period, medical staff must go to the scene in person to provide timely treatment to those injured during the rescue process. Those who are seriously injured must be sent to the hospital for treatment in a timely manner.

(8) Xie Haibo is in charge of the car team. During the rescue period, enough cars must be prepared to transport the injured and medical staff.

(9) The communication team is headed by Xiong Shanbao. After the accident, he is responsible for convening flood rescue personnel and contacting relevant superior units, and reporting the relevant spirit and instructions of superiors to the commander-in-chief in a timely manner.

(10) If the accident is too large and the unit cannot handle it, the mine rescue team should be notified immediately to request rescue. Note: This emergency plan can only be implemented after a flood accident occurs.

5. Preparation quantity and storage location of emergency equipment and materials:

Factory storage room three-proof emergency plan for rainy season and three-proof winter 2

In order to ensure the enterprise Normal production, working order and the safety of life and property ensure that the company's various facilities can safely survive the summer floods.

1. Flood Prevention Leading Group

Team leader: xx.

Deputy team leader: xx.

Members: xx.

Rescue team: All company personnel have the responsibility and obligation to participate in flood fighting and rescue operations to protect the safety of company property.

2. Flood Prevention Organizational Procedures

When a danger occurs, the company office is responsible for on-site command, and the heads of various departments and Chinese and Western medicine workshops actively deploy headquarters personnel to cooperate in rescue operations. . When a dangerous situation occurs at night or on a holiday, the person on duty is responsible for temporary command and promptly notifies other members of the flood control team to rush to the scene.

3. Flood prevention measures of the Engineering Department during the flood season

1. Flood prevention equipment is placed at the gate, mainly including woven bags, sand, shovels, etc.;

2. Key parts of the company: the entrances of all the company’s factories.

3. Danger:

(1) The entrance of the company cannot flow inward.

(2) The drainage pipe is blocked and the water level in the factory area rises.

4. Before the arrival of the flood season, office staff should carefully inspect key parts of the entire factory.

(1) Check whether the drainage ditch on the roof platform is unobstructed, and remove the garbage on the roof;

(2) Check whether there is accumulation in sewage wells and drainage pipes, and Remove them to ensure smooth drainage;

(3) Check whether there is any leakage in important machine rooms such as the power distribution room, and deal with it in time if it occurs.

4. Danger handling procedures

1. If a danger occurs in the factory, sandbags must be quickly used to block key entrances to protect company property.

2. After a dangerous situation occurs, a comprehensive inspection must be carried out to count the losses and material consumption caused by this flood, and timely replenishment of flood prevention materials to prepare for the next flood prevention;

3. The incident handling process must be recorded in detail, and the office shall report to the company leaders and superior departments.

5. Organizational command structure

General commander: (unit leader).

1. Action team: responsible for on-site firefighting.

2. Evacuation guidance group:

(Designated team leader and main person in charge of each region) coordinates personnel evacuation, on-site order maintenance, and vigilance work.

3. Safety rescue team:

(composed of personnel with certain rescue knowledge) carrying first-aid kits and first-aid facilities. On the premise that life safety is guaranteed, they are responsible for the personnel and materials at the fire scene. of rescue.

4. Communication liaison group:

(Staff in the fire control room or duty room) handles internal alarms within the company, notifies the main leaders and members of each team, and understands the fire situation and evacuation situation in each area, Communicate firefighting and evacuation instructions.

In accordance with the above requirements, each team reasonably arranges shift colleagues to ensure that relevant personnel who meet the regulations are on duty 24 hours a day, and ensure that "when called upon, they can fight". Three preventions in rainy season and three preventions in winter emergency plan 3

1. General requirements

Adhere to the policy of "safety first, always be prepared, take precautions first, and go all out to rescue", and do a good job carefully Various preparations for preventing and fighting major floods. Ensure smooth drainage of ditches and rivers, ensure the safety of people's houses, minimize disaster losses, and especially put the safety of people's lives first.

2. Main measures

This year’s flood control work must continue to prepare in accordance with the standards of “preventing major floods and fighting major floods”, insisting on paying equal attention to flood prevention and waterlogging removal, to ensure the safety of floods , strive to reduce disaster losses and ensure the normal production and life of urban and rural people. Focus on doing the following work.

(1) Carry out census and registration of dangerous houses

Each office and administrative village must conduct a network inspection of dangerous houses in their respective jurisdictions, and identify houses that have major safety hazards and are not suitable for habitation. , must be resolutely closed to ensure the safety of people's lives and property.

(2) Keep the flood discharge ditches open

Nanguan ditch, Beiguan ditch and Gucai River are the main flood drainage channels in our town. Each office and administrative village must make clear Dedicated personnel are assigned to manage and clean up siltation and debris in a timely manner to ensure the smooth flow of the river.

(3) Do a good job in rural field drainage

Field drainage projects are a weak link in our town’s flood control and drainage, and are also an important reason for local crop disasters and production reductions. Each administrative village must take the village group as a unit, actively mobilize the masses, organize a strong field commando team, open up the Ditou ditch, Zhujie ditch, and pillow ditch, clear the road ridges and road dams, and connect small ditches with large ditches and large rivers. , focusing on solving the problems of no drainage in the ground, no drainage in the river, and no way out for field drainage.

(4) Do a good job in dredging urban drainage pipes

Each office should carry out a general survey of the drainage pipe network in the low-lying and water-prone areas under its jurisdiction, and complete the pipe network as soon as possible Dredging, removing water blocking obstacles and ensuring smooth drainage. Each office is responsible for organizing the local people to clean up the sewers in small streets and alleys. Regarding the problem of water accumulation in drainage pipes on urban main roads, the town party committee and government are responsible for writing a special report to the county committee and county government, urging the urban construction department to implement dredging as soon as possible.

(5) Organize a flood control emergency team

According to the requirements of the county flood control target responsibility letter, the town government shall organize a 50-person flood control emergency team, and each office and administrative village must also organize a flood control emergency team of 50 people. For a flood control team of less than 20 people, the town’s emergency flood control force must reach more than 700 people. Flood control teams at all levels must specify dedicated personnel to take responsibility, register and implement the personnel, and must have the five aspects of ideology, leadership, organization, materials, and technology in place to ensure that they can pull out, grab, and defend when in danger.

(6) Make preparations for flood prevention materials

The town finance department has included 200,000 yuan in flood prevention funds into the budget, and at the same time, in accordance with the method of "prepare but not collect, pay after use" to ensure quality and guarantee. Make adequate reserves of flood control materials such as woven bags and iron wire. The reserve of woven bags should reach 20,000 pieces and the iron wire should reach more than 2,000 kilograms. A designated person is responsible for the standing materials, and misappropriation is strictly prohibited to ensure that they are fully prepared, transported, and used.

3. Strengthen leadership

Conscientiously implement various flood prevention responsibility systems with the administrative head responsibility system as the core. The town government established a flood prevention work headquarters, with the town mayor Wang Yanli as the commander, the party committee secretary Liu Congxiu as the political commissar, and the entire leadership team as members to effectively strengthen the leadership of flood prevention work. Each office and administrative village must also establish a leadership organization accordingly, making it clear that the general branch secretary of the office and the secretary of the administrative village branch are the first persons responsible for flood prevention work in the unit.

4. Strict discipline

Flood prevention work is related to the overall situation. All offices and administrative villages must establish and implement the scientific concept of practice, build a harmonious society, and fully understand the importance of flood prevention and emergency rescue. nature, effectively enhance the sense of responsibility and mission, and effectively implement flood prevention work. Towns, offices, and villages must adhere to the 24-hour duty system, pay close attention to rain conditions, water conditions, and disaster situations, and ensure that flood information is communicated to the public and flood prevention commands are implemented. Those who neglect their duties or work ineffectively during the flood prevention period and cause serious consequences must be punished. Relevant leaders and parties concerned will be held seriously accountable; if the circumstances are serious enough to constitute a crime, criminal responsibility will be pursued in accordance with the law. Units and individuals that have made outstanding contributions to flood prevention and relief, emergency rescue and disaster relief should be commended and rewarded. Three precautions in rainy season and three precautions in winter emergency plan 4

1. General principles

1.1 Purpose of preparation.

We must do a good job in flood control and flood control, ensure that flood fighting and rescue work is carried out in an efficient and orderly manner, effectively respond to the hazards caused by sudden floods, and minimize casualties and property losses.

1.2 Basis for preparation.

According to the "People's Republic of China Water Law", "The People's Republic of China Flood Control Law" and the "National Public Security Emergency Emergency Plan", "xx Province Emergency Response Plan" "Overall Contingency Plan for Public Incidents", "China xx Group Company Overall Contingency Plan for Public Incidents", "China xx Group Company Flood Prevention Emergency Plan", "xx Company Overall Contingency Plan for Emergency Incidents", etc. Relevant laws, regulations, and normative documents will be used to formulate this plan.

1.3 Classification of flood prevention.

Floods are divided into three levels according to the severity of their possible consequences:

(1) Major level. It may cause rivers to overflow, floods to breach weirs, traffic paralysis, large-scale collapse of dilapidated houses, and power and water outages in large industrial areas or residential areas.

(2) Larger level. Continuing heavy rains may cause flash floods, mudslides, landslides, large-scale subsidence, slope collapse, road damage, and serious impact on production and life.

(3) General level. Continuous rain may cause the river water to exceed the warning level, forcing all or part of production to stop, and life will be affected to a certain extent, but normal life order can be maintained.

1.4 Scope of application.

This plan applies to the construction, production, and operation processes of xx Company (hereinafter referred to as the company) as well as the flood prevention and emergency response work in the urban area.

1.5 Working principles.

Adhere to the principles of people-oriented, prevention first, cooperation with the government, regional management, and overall linkage, adhere to the principle of unity and cooperation and subordination of local interests to overall interests, implement the responsibility system of administrative top leaders in each unit, unified command, and hierarchical distribution. Department is responsible.

2. Organizational system

2.1 Organizational structure.

The company’s flood control emergency rescue organization is divided into two levels. The company has a first-level emergency rescue organization, which is composed of the company’s flood control emergency rescue headquarters, the flood control emergency management office, and the company’s relevant departments; the company’s affiliated units, Each directly managed project department shall establish a secondary emergency rescue organization.

2.1.1 Flood Control Emergency Rescue Headquarters.

Commander: General Manager of the company.

Deputy Commander: Relevant leaders of the company.

Members: Relevant persons in charge of the General Manager’s Office (trade union), Human Resources Department, Production and Operations Department, Safety, Quality and Environmental Protection Department, Finance Department, Mechanical and Electrical Materials Department, Science and Technology Management Department, Urban Management Department, etc.

(See the attachment for the list of command institutions and contact numbers).

2.1.2 The company’s flood prevention and emergency management office.

The company’s Flood Prevention and Emergency Management Office is located in the Safety, Quality and Environmental Protection Department, and the Minister of Safety, Quality and Environmental Protection Department also serves as the director of the office.

2.1.3 Professional emergency rescue team.

The professional emergency rescue team mainly includes: emergency teams established by each unit, health clinics of each unit and external rescue forces, etc.

2.1.4 Flood prevention organization structure of each unit.

Each unit should set up a flood prevention leading group, with the first person in charge of administration as the group leader and the leader in charge as the executive deputy group leader, who are directly responsible to the company's flood prevention leading group. The flood prevention work office of each unit is located in the engineering management department, responsible for daily flood prevention work, and corresponds with the company's flood prevention work office to keep communication channels open.

2.2 Responsibilities.

2.2.1 Flood Control Emergency Rescue Headquarters.

(1) Command, organize and coordinate the company’s flood control emergency management and rescue work;

(2) Responsible for decision-making on major flood control emergency rescue matters;

( 3) When necessary, coordinate the professional emergency rescue teams of all parties to carry out emergency rescue work;

(4) Organize emergency rescue work according to the instructions of the local government and group companies and the requests for help from neighboring units.

2.2.2 Flood Control Emergency Management Office.

(1) Under the leadership of the company’s flood control emergency rescue headquarters, be responsible for the comprehensive management of general and above-level flood control emergency plans;

(2) Convey the company’s flood control emergency rescue command Organize, coordinate and guide flood emergency response work at general and above levels according to various instructions of the department;

(3) When collaboration and cooperation between various units of the company and social reinforcements are required, in accordance with the instructions of the emergency rescue headquarters, Coordinate and organize organizations and units capable of rescue to participate in flood control emergency rescue to prevent the expansion of the disaster;

(4) Responsible for cooperating and coordinating the investigation and handling of various flood control accidents;

( 5) Timely report flood disasters and rescue situations;

(6) Undertake other tasks assigned by the company's flood control emergency rescue headquarters.

2.2.3 Relevant member units (departments).

(1) General Manager’s Office: Responsible for the transmission of flood control emergency rescue information, guidance from superiors and neighboring units, reception of support personnel and investigators, and providing transportation support for flood control emergency rescue personnel.

(2) Mechanical and Electrical Materials Department: Responsible for material management, production machinery (including special equipment), construction power supply, etc. during flood control emergency rescue, as well as command and technical guidance for equipment evacuation and disposal.

(3) Science and Technology Management Department: Responsible for providing technical preparation and guidance for flood control emergency rescue.

(4) Trade union: Participate in the relocation and resettlement work of the masses.

(5) Urban Management Department: organize and coordinate flood control emergency rescue and command in XX urban area; be responsible for 24-hour flood control duty in the urban area; coordinate and cooperate with the public security organs and relevant units on site safety alert, traffic control and Maintenance of public security order and mass transfer in the surrounding areas.

(6) XX Company and XX Company: According to the request of the flood control emergency rescue site, organize medical treatment and health and epidemic prevention work, and provide technical support to the medical department.

(7) Other relevant departments: Establish an emergency contact working mechanism with the Flood Control Emergency Management Office to ensure smooth flow of information, and according to the needs of flood control emergency rescue work, under the organization and coordination of the company’s emergency rescue command center Good related work.

2.2.4 Flood prevention and emergency rescue organizations of each unit.

(2) Establish a flood control emergency rescue organization and various professional emergency rescue teams, equip them with necessary emergency rescue equipment and equipment, and establish an emergency linkage working mechanism with local government, owners, supervisors, companies and other flood control emergency rescue agencies. , ensure the smooth flow of information, and carry out corresponding organization and coordination work according to the needs of emergency rescue work for production accidents;

(3) Organize the publicity, training and drills of flood prevention emergency plans;

(4) After a flood occurs, quickly report and activate on-site flood control emergency rescue plan, actively and quickly organize flood control emergency rescue and disposal, provide accident site conditions and necessary flood control emergency rescue equipment and equipment, and necessary transportation support to prevent the situation from expanding and spreading. , minimize losses;

(5) Complete other related work of flood prevention, rescue and treatment.

3. Disaster Early Warning

The company’s flood control emergency management office shall, based on the flood control and flood forecast information provided by each unit, each directly managed project department or the urban flood control department, combined with the flood situation in the project location or urban area Analyze and evaluate the natural conditions, flood control standards and hydrological conditions, and make timely flood warnings.

3.1 Early warning action.

After receiving flood control emergency warning information at all levels, flood control emergency agencies at all levels will promptly study and determine response plans in accordance with the emergency plan, and notify relevant units and departments to quickly take corresponding actions.

After receiving the flood control warning information, the relevant departments of the company must pay close attention to the progress of the situation, make emergency preparations and prevention work in accordance with the emergency plan, and promptly report the flood situation to the company’s flood control leadership group and the flood control emergency management office. The Flood Prevention and Emergency Management Office supervises the implementation of flood prevention measures.

3.2 Information report.

After a flood occurs, relevant personnel on site should immediately report to the person in charge of the unit. After receiving the report, the person in charge of the unit should immediately report to the company's Flood Prevention and Emergency Management Office. The contents of reports and alarms mainly include: time, location, scope, extent, losses and trends of floods, measures taken, contact persons and phone numbers, problems that need to be solved in production and life, etc. The Flood Control Emergency Management Office immediately reports to the company's Flood Control Emergency Rescue Headquarters and, if necessary, reports to the Group Company's Flood Control Emergency Rescue Headquarters.

4. Emergency response

4.1 Graded response mechanism.

According to the level of flood control, emergency response is divided into Level I response (major level, larger level) and Level II response (general level).

4.2 Emergency response procedures.

4.2.1 Level I response.

 4.2.1.1 For Level I response, the company’s flood control emergency rescue headquarters is responsible for reporting to the group company’s flood control emergency rescue headquarters, initiating the group company’s flood prevention emergency plan, and the company implements early disposal.

4.2.2 Level II response actions.

4.2.2.1 Response from the company’s flood control emergency rescue headquarters.

(1) Organize and coordinate flood prevention emergency rescue work.

(2) Direct the company’s emergency management office and relevant member units (departments) to carry out emergency rescue work in accordance with their responsibilities.

(3) Organize and guide emergency rescue forces to rush to the scene to participate in rescue work. If necessary, request assistance from the group company or local government or the owner's professional emergency rescue team.

4.2.2.2 Response from the company’s flood control emergency management office.

(1) Timely report the flood situation and development of the situation, and the progress of the rescue work to the company’s emergency rescue headquarters;

(2) Maintain communication with the emergency rescue headquarters of the flood control unit and relevant departments

(3) Guide on-site emergency rescue work, and coordinate the reinforcement of professional emergency forces when necessary;

(4) Coordinate and implement other related matters.

4.2.2.3 Response from relevant units (departments).

(1) Activate the professional emergency plan of the unit (department) and organize or participate in emergency rescue work;

(2) Promptly report to the company’s flood control emergency rescue headquarters and emergency management office Report the progress of the rescue work;

(3) When support from other emergency forces is needed, make a request to the company's flood control emergency rescue headquarters or emergency management office.

4.2.2.4 Response of flood control units.

(1) Immediately report the flood situation to the company’s emergency rescue headquarters and emergency management office;

(2) According to the instructions of the company’s emergency rescue headquarters, activate the flood prevention emergency rescue plan , fully implement emergency rescue;

(3) When external rescue forces participate in rescue, cooperate with them.

4.3 Emergency end.

The basic conditions for the termination of flood control emergency rescue are: the danger of flood control has disappeared and the flood situation has been stably controlled.

For the emergency termination of Level I response, the company’s flood prevention work leading group shall issue an emergency termination order based on the instructions issued by the group company. For emergency termination of Level II response, the company's flood prevention leading group shall issue an emergency termination order.

5. Safeguard Measures

5.1 Communication and information security.

The company’s flood control emergency management office organizes the establishment and improvement of the company’s flood control emergency rescue comprehensive information network system and information reporting system, and improves the corresponding database; under normal circumstances, emergency command agencies and key personnel at all levels should maintain communication 24 hours a day Normal flow.

5.2 Emergency team support.

Flood control emergency rescue headquarters at all levels shall establish and improve flood control emergency rescue teams in accordance with the law, and supervise, inspect and master the formation and implementation of relevant emergency rescue forces of affiliated units and project departments to ensure that the organization is sound and personnel are in place , to ensure that rescue can be carried out promptly and effectively in emergency situations.

5.3 Emergency supplies and equipment support.

The flood control and emergency management agencies of each unit guide and coordinate the units to prepare relevant flood control emergency rescue materials and special rescue equipment, improve relevant systems, and achieve maximum sharing of resources.

The mechanical, electrical and material management departments of each unit should establish a reserve system for emergency rescue facilities, equipment, etc., reserve necessary emergency supplies, equipment and equipment, and supervise, inspect and master the reserve status of emergency supplies at all levels.

5.4 Funding guarantee.

Flood prevention and emergency management agencies at all levels should make necessary financial preparations for flood prevention and emergency rescue.

5.5 Transportation guarantee.

Flood control emergency management agencies or relevant departments at all levels shall promptly coordinate relevant units and departments to provide transportation support according to rescue needs.

5.6 Medical and health security.

All health centers affiliated to the company should strengthen the construction of medical rescue capabilities, formulate emergency response action plans, and equip necessary medical treatment drugs, equipment, equipment and personnel. Engineering construction project departments that do not have medical institutions should establish an emergency linkage working mechanism with the local or owner's medical and health institutions to ensure timely and effective emergency response.

6. Publicity, training and drills

6.1 Public information exchange.

The company, its affiliated units and relevant departments must organize and carry out publicity and education on emergency laws and regulations and common knowledge on flood prevention, risk avoidance, disaster avoidance, self-rescue, mutual rescue, first aid, etc., to improve the crisis awareness of all employees. .

6.2 Training.

All units must organize pre-job training and professional training for emergency rescue agencies and professional emergency rescue personnel at all levels to improve flood prevention emergency rescue capabilities. The company's flood control emergency management office is responsible for inspection and guidance.

6.3 Walkthrough.

The company’s Flood Prevention and Emergency Management Office and relevant departments guide, coordinate, and supervise the flood prevention and emergency rescue drills. Emergency agencies at all levels shall organize flood control emergency rescue drills at least once a year and keep records. At the end of the exercise, the results of the exercise should be evaluated, their effectiveness tested, and existing deficiencies analyzed for further modification, addition, and improvement.

7. Supplementary Provisions

7.1 Plan management.

This plan was formulated by the company’s Safety, Quality and Environmental Protection Department, approved by the company’s Emergency and Flood Prevention Management Committee, and the company’s Flood Prevention and Emergency Management Office is responsible for interpretation and organization of implementation. All relevant units shall perform their duties in accordance with the provisions of this plan and formulate emergency plans that are connected with this plan and relevant superior plans.

7.2 Release and Implementation.

This plan will be implemented from the date of release.

Three preventions in rainy season and three preventions in winter emergency plan 5

1. Guiding ideology

In order to do a good job in flood prevention and rescue work and ensure that the company can survive the flood safely, the preparation of the plan adheres to the principle of "safety first" , always be prepared, put prevention first, and combine prevention with robbery", and adhere to the principle of "unity and cooperation and local interests subordinate to overall interests", carefully analyze the actual situation with a scientific attitude, and respond to sudden disaster weather based on preventing major floods , earnestly make various preparations for flood prevention and drainage, take effective measures to avoid leakage, backflow, flooding and other phenomena in the rainy season, avoid and reduce economic losses, ensure the normal progress of production and operation during the flood season, and prepare a highly operational flood prevention plan, Ensure the safety of life and property of the company and its employees.

2. Flood prevention work command system

Flood prevention work strictly implements the hierarchical responsibility system under the leadership of the administrative head, and consolidates responsibilities at every level. During the flood prevention period, the leaders of each workshop department personally take charge, and at the same time, for the use of All flood prevention command work was carried out in an orderly manner, and the company established a flood prevention work headquarters. The members are as follows:

Commander-in-Chief: Secretary of the Party Committee and General Manager of the Group Company Deputy Commander-in-Chief: Deputy Secretary of the Party Committee of the Group Company and Chairman of the Trade Union.

Members: leaders in charge of the company and heads of various departments in the headquarters.

Contact person: xxx.

Duty phone number: xx.

Corporate office: xx.

General Department: xx.

Night duty: xx.

Duty room: xx.

3. Establish an emergency response team

During the flood season, in order to prevent disasters from affecting production and operations, we follow the instructions of xx Group (Holdings) Co., Ltd., district and street flood control headquarters According to the requirements, an emergency rescue team composed of security teams and fire brigade should be formed. The emergency rescue team should obey the leadership of the company's flood control headquarters and enter flood control and rescue operations at any time in case of flood emergencies to be responsible for handling emergencies.

4. Build a flood-fighting and rescue team

1. In order to make preparations for preventing and evacuating major floods, we have established a militia in accordance with the requirements of the superior flood control headquarters. The 200-person rescue team composed of mainly young and middle-aged workers will be mobilized by the district flood control headquarters in the event of severe floods and be prepared to go up embankments to fight floods and rescue operations.

2. During the flood prevention period, in order to carry out the company's internal rescue and drainage work, a rescue team of 100 people was formed by the company's employees, and all rescue work was mobilized by the company's flood prevention headquarters.

5. Be prepared to prevent heavy floods, rain leaks and backflow

In order to survive the floods safely and ensure that corporate property is not damaged, when heavy rains and heavy rains are forecast, Each workshop and department should strengthen flood prevention capabilities and ensure that there are no less than 2 people on duty. At the same time, in order to ensure the safety of the factories, warehouses and key parts of the production workshops of the company's affiliated enterprises during the flood season, especially to prevent various bacteria from contaminating food through underground drainage, the workshops and departments have accordingly done a good job in preventing leakage and inspecting the factory areas before the flood. Inspect underground drainage pipes in the interior, and conduct anti-backflow inspections in all warehouse locations. If problems are found, find the competent department to solve them promptly. Measures to prevent backflow should be taken for low-lying areas, and ensure safe weathering of floods so that no leakage occurs during moderate to light rain. There will be no backflow of heavy rains to ensure normal production and operation.

6. Make preparations for flood prevention materials

In order to do a good job in this year's flood prevention, emergency rescue, waterlogging drainage and other work, and to be prepared, all relevant departments have prepared flood prevention facilities, flood prevention tools, Management, repair and maintenance of drainage pipes, flood control soil, flood control gates, waterproof rubber plugs, communication lines, duty vehicles and other materials to keep them in a good state of combat readiness. At present, our company has flood prevention tools: 50 shovels, 50 shoulder poles, 3 drainage pumps, and 18 baskets.

7. Strict flood prevention duty system

In order to ensure safe passage through floods, company leaders and managers are arranged to be on flood prevention duty during the flood season.

Set up a dedicated duty system for key parts, and a duty system for leaders of workshops and relevant departments. Especially when there is moderate or heavy rain, leaders of the workshop department must be on duty at each key part so that problems can be discovered and solved in a timely manner.

8. Responsibilities of each department in flood prevention work

In flood prevention work, we must implement the principles of "whoever leads, who is responsible" and "whoever is on duty, who is responsible", and establish an overall concept, Make preparations for major floods. To this end, the relevant job responsibilities are formulated:

During the flood season, actively organize and arrange production and do various tasks to prevent rain leakage and sewage backflow, timely grasp the weather changes during the flood season, and assist the organization based on actual production Drainage and rescue. In the event of rain forecast or sudden rain at night, the main leaders of each workshop and department and the leaders of key flood control departments must immediately go to work to inspect the leakage and water accumulation of the workshop and department, and obey the company's arrangements.