Project name: Zhoushan Jiawen International Hotel Project
Construction unit: Zhoushan Hongsheng Real Estate Co.
Design unit: Zhoushan City, Planning and Architectural Design and Research Institute
Surveying unit: Zhejiang Province, Huaxia Engineering Survey Institute
Construction unit: Zhejiang Thousand Island Construction Co. Second, the main basis for safe construction supervision
1) Chinese people *** and the State Safety Production Law.
2) construction safety management regulations.
3) Regulations on production safety issued by the competent departments of construction administration at all levels.
4) national engineering construction standards mandatory provisions of the housing construction part (Part IX construction safety) at the end of 2002
Three, the task of safety construction supervision
The main task of the construction phase safety supervision is based on the main basis of the above safety construction supervision, the Project Supervision Department to check, supervise the construction side to strictly implement the relevant laws and regulations on production safety, Provisions, norms, regulations, standards, the development of practical production safety regulations. In the construction site to implement the safety of technical measures and organizational measures to eliminate the occurrence of safety accidents, to achieve safe construction, quality and quantity to complete the construction tasks.
Four, anti-temperature, flood and typhoon supervision of the main work
1, summer and autumn season has entered the hot summer and typhoon period, the project supervision department should strengthen the daily safety supervision, supervise the construction unit to do a good job in summer and autumn season of the building construction of the production of all production safety work, in order to prevent the high temperature of the construction and typhoon caused by the safety of accidents and losses.
2, for high-temperature construction urge the construction unit attaches great importance to the prevention of heat stroke. In the high temperature period, the reasonable arrangement of site work and rest time, to avoid high temperature construction, equipped with enough heat stroke medicines, prohibit poor health personnel on duty, if the personnel occurred heat stroke phenomenon, should immediately organize a certain professional rescue knowledge of people to rescue.
3, urge the construction unit to prepare an emergency rescue plan, and set up an emergency rescue team in the project department, to ensure that a certain number of people, in the event of an accident, can immediately start the emergency rescue work, in order to reduce losses. Rescue team functionaries should be trained accordingly.
4, urge the construction unit is equipped with adequate firefighting equipment, communication equipment for external contact, trained firefighters and other functional personnel, the appropriate medical rescue equipment, standby lighting equipment, adequate funding allocation. And will be labeled flood control, fire equipment layout points, safe passage of the regional plan posted in a conspicuous position. External contact telephone: fire 119, first aid 120, weather 121, also need to be marked on the regional plan.
5, urge the project department to check once a month to ensure that flood control, fire equipment integrity, and reasonable maintenance.
6, urge the project department typhoon prone season, the liaison group pay attention to listening to weather forecasts, such as typhoons, rainstorms, to issue emergency notices, more than six typhoons to stop the construction, more than eight into the emergency typhoon, rainstorms preparation.
7, urged the project department typhoon, rainstorms before the arrival of typhoons, rainstorms, typhoon leadership and typhoon, rainstorms, rainstorms, functional teams to do a good job of typhoon, rainstorms, preparedness: the site of the material easy to dust to cover, easy to be blown away by the wind material to be collected and fixed; scaffolding should be reinforced reinforcement, scaffolding can not be put on things; check the drainage of the body of water pipeline is smooth, easy to remove clogging; the surrounding environment chores to be cleared; activity room, machinery and equipment protection shed, the scaffolding can not be placed. ; activity room, machinery and equipment protection shed, tower crane derrick to be reinforced, tower crane head can be put down put down, can not be put down, the head should be placed downwind, rotating direction of the brakes to be released; construction site power supply should be cut off, standby lighting equipment should be prepared.
8, supervise the project department is located in the area to keep the fire escape, safe passage. Office doors and windows should be closed. All levels of typhoon and rainstorm prevention leadership team and typhoon and rainstorm prevention function team communication should be open.
9, typhoons, rainstorms occur, typhoon prevention, rainstorm leading group to start the typhoon prevention, rainstorm emergency plan.
The duty officer should enter the state of emergency, to patrol the site around the situation, found abnormalities should be promptly reported to the leading group.
10, due to the typhoon caused by fire, typhoon prevention, rescue group should immediately organize the fight, and report to the leading group to start the fire emergency plan.
11, due to the typhoon caused by the collapse, such as people trapped, the evacuation team according to the scene to determine the evacuation, escape channel, organize the escape and evacuation, and is responsible for maintaining the order and counting the number of people. If there is any personnel injury, the rescue team should immediately organize rescue and report to the leading group to report the start of the emergency plan for accidental injury first aid. If the rainstorm causes blockage of water discharge pipes or environmental pollution, the environmental protection group should immediately organize dredging and control. If there are substances to be salvaged, the damage control group should immediately organize material salvage and control losses, the environmental protection group is responsible for taking measures to control environmental pollution.
12, typhoon, rainstorm leading group should be responsible for the scene of the command, rescue, communication, the use of vehicles scheduling work.
13, typhoons, rainstorms caused by the occurrence of accidents should be immediately reported to the higher authorities on duty for coordination. Correct and improve the typhoon, rainstorms occur, the Security Division is responsible for the evaluation of the emergency plan and improve the emergency plan.
It is believed that after the above introduction, we have a certain understanding of the implementation of special supervision rules for high temperature construction and flood and typhoon prevention. Welcome to visit Zhongda Consulting for more information.