Summary of mine emergency plan drill

Summary is a comprehensive and systematic summary of a period of study, work or its completion. It helps us to find the laws of the development of work and things, so as to master and apply these laws. Let's write a summary. So what is the format of the summary? The following is a summary of the drill of mine emergency plan compiled by me for your reference only. Welcome to reading.

According to the national emergency management laws and regulations and the relevant requirements of the superior coal mine safety management department, combined with the actual situation of our company and the arrangement of the 20xx annual mine safety production accident emergency plan drill plan, our company conducted a comprehensive mine emergency plan drill on March 25, 20xx. With the assistance and correct guidance of the rescue team of Feicheng Mining Group and Ningyang Coal Industry Bureau, the drill of mine emergency plan has achieved the expected effect. The drill of mine emergency plan in our company for 20xx year is summarized as follows:

A, mine comprehensive emergency plan drills:

1. This drill of mine comprehensive emergency plan assumes that mine safety is threatened by bad weather and heavy rainfall on the ground.

2. In order to ensure the complete success of the mine emergency drill, according to the requirements of Ningyang County Coal Industry Administration, the company compiled the mine emergency drill plan on March 10, 20xx, and passed the audit of the company leaders.

3. The company set up a leading group for mine emergency plan drills, with Dong Fuji as the team leader, Wu Zhiling as the chief engineer, Ge as the production manager, Lv Changxin as the safety manager and deputy team leader, and the main leaders of each unit as members. The company issued a notice to organize the study of the "Drill Plan for Mine Emergency Plan", requiring all units to organize the examination according to the notice. Those who fail the exam are strictly prohibited from participating in the mine emergency plan drill.

The leading group of mine emergency plan work held a special meeting on March 23rd to conduct emergency plan desktop drills, which laid a solid foundation for the mine emergency plan drills to be carried out as scheduled and normally.

4. At 09: 00 on March 25th, the rescue team of Feicheng Mining Group arrived at the mine as scheduled; At 09: 0010 on March 25th, Yang and his party, the leader of Ningyang Coal Bureau, arrived at the company's dispatching room as scheduled to participate in the mine emergency plan drill organized by Shandong Hengda Coal Industry Co., Ltd. ..

5. Dong Fuji, the mine manager, issued the order to start the comprehensive emergency plan drill on time at 1 1: 00 according to the time and relevant requirements stipulated in the emergency plan drill plan, and the mine emergency plan drill began.

Withdrawal notice:

1 1: 00, the dispatcher Ceng Tao ordered the coal mining face 35 17 Ningting Mine to lead all the personnel in this coal mining face to quickly ascend the well according to the flood avoidance route, and gather in the wellhead waiting room to count the number of people.

1 1: 00, the dispatcher Ceng Tao instructed Li Yuhua, the track tunneling working face in No.5 mining area, to lead all personnel in the tunneling working face to quickly ascend the well according to the flood avoidance route, and gathered in the wellhead waiting room to count the number of people.

1 1: 00, the dispatcher Ceng Tao instructed Shen Jianmin, the manager of the explosive magazine, to quickly ascend the well according to the flood avoidance route and gather in the waiting room at the wellhead to count the number of people.

1 1: 0 1, the dispatcher instructed Wang, the captain of the machine transport team, to lead all the personnel of the machine transport to quickly ascend the well according to the flood avoidance route and gather in the waiting room at the wellhead to count the number of people.

1 1: 0 1, the dispatcher Ceng Tao instructed Ren Xianzhong of No.325 coal mining face to lead all the personnel in this coal mining face to quickly ascend the well according to the flood avoidance route, and gather in the wellhead waiting room to count the number of people.

1 1: 02, the dispatcher Ceng Tao instructed Zhang Yuming, the driver of class 3 monkey car, to evacuate all personnel below -270m level to -200m level, and report to the dispatching room, and quickly lift the well according to the route to avoid flooding.

1 1: 02, the dispatcher instructed the driver of class two monkey car to evacuate all personnel below-100m to -37m, and report to the operation department to quickly raise the well according to the route to avoid flooding.

1 1: 02, the dispatcher Ceng Tao instructed all the staff in the -37m production winch room to quickly lift the well according to the flood avoidance route.

1 1: 02, the dispatcher Ceng Tao instructed the hook lifting machine of -37m main inclined shaft to rise rapidly.

1 1: 02, the dispatcher instructed Wang, the driver of -37m central pump house, to arrive and wait for the notice from the dispatching room.

1 1: 00, dispatcher Sun Zhe instructed Cheng Weiguo to immediately organize emergency personnel of the production branch to gather at the stadium.

1 1: 00, the dispatcher Sun Zhe instructed Lu to immediately organize the emergency personnel of the administrative sub-bureau to gather at the stadium.

1 1: 00, the dispatcher Sun Zhe instructed Hu Ruxiang to organize the rescuers from the Second Branch to gather at the stadium immediately.

1 1: 00, dispatcher Sun Zhe instructed Cai Qixian to immediately organize a rescue team to meet at the stadium.

At 1 1: 00, the dispatcher instructed the rescue workers of Mongolia Organization Aircraft Transportation Branch to gather at the stadium immediately.

1 1: 0 1, the dispatcher Sun Zhe instructed Liu Xiumei in the miner's lamp room to count the number of miner's lamps.

1 1: 0 1, the dispatcher Sun Zhe instructed Li Zibing to arrange an ambulance at the wellhead to stand by.

1 1: 00, dispatcher Sun Zhe instructed Zhao Qingpu Hospital to lead medical staff and emergency medicines to the wellhead for standby.

1 1: 02, dispatcher Sun Zhe instructed Jiang Chunping at the wellhead that no one should go into the well without a well entry permit.

1 1: 03, those who received the instruction, Ge and Lv Changxin, go to the dispatching room.

1 1: 03 Zhang and Fan received instructions.

Ming, Zhao, Li

Quan Yu Liu

Shaopo

Army, Sun Xueqi, Zheng Weidong and others went to the operation department successively.

1 1: 03, Dong Fuji announced the formal establishment of the emergency rescue headquarters, and issued the procedures for stopping production and evacuating people and the instructions for emergency rescue on-site drills according to the plan.

Commander in chief issued instructions:

1. instruct the chief engineer and technical minister to make judgments according to the disaster situation and provide relevant downhole information, so as to formulate practical safety measures according to the provided information.

2. According to the actual situation of on-site feedback, guide the production and safety mine managers to predict the dynamic development and formulate the next reasonable rescue plan.

3. Instruct the Operation Department to call the Flying Mine Rescue Team to help guide the disaster relief work.

4. Instruct the security department to supervise the job responsibilities of wellhead inspectors, and all personnel without well entry permit are not allowed to enter the well.

5. Instruct the dispatching room to call the captains of rescue teams to organize rescue teams and go to the basketball court for standby;

6. Instruct the operation department to check the signature form of the early-shift downhole personnel and report it to the headquarters, assign a special person to observe the personnel monitoring system, grasp the number of people ascending wells displayed in each position, make records, and report to the headquarters once every 10 minute.

7. Instruct the ventilation department to reasonably adjust the air volume according to the development of the situation and formulate emergency ventilation and disaster relief measures.

8, command miner's lamp room, check the miner's lamp distribution records on duty, report to the headquarters.

9. Instruct the office to send medical personnel and ambulances to prepare first-aid medicines, and send bystanders to carry out rescue at the wellhead.

10, instruct the materials department to prepare all materials needed for emergency rescue and disaster relief.

1 1, instruct the mechanical transportation work area to quickly organize personnel to be responsible for transporting the required relief materials to the wellhead.

12. instruct the security department to maintain and defend the order of the ground and the production workshop, and prohibit non-working personnel from entering. Parking vehicles must make way for vehicles carrying relief materials, and non-staff members are prohibited from entering within 50 meters of the wellhead.

Plan emergency response:

1 1: 04, wellhead searcher Chen Zekui reported the number of people on duty 128. Among them, 36 people were selected; Take two 32 people; The plane transported 44 people; Functional offices 16.

1 1: 04, Cheng Weiguo, the production and rescue team, reported that 29 people had assembled in the stadium to stand by.

1 1: 04, the rescue team Cai Qixian reported that 27 people had assembled in the stadium to stand by.

1 1: 05, the second rescue team Hu Ruxiang reported that 20 people had assembled and stood by at the stadium.

1 1: 05, the administrative rescue team Lu reported that 28 people had assembled in the stadium to stand by.

1 1: 04, the emergency rescue team of Meng extension reported that 60 people had assembled at the stadium to stand by.

1 1: 06, Liu Xiumei from the charging room reported the distribution statistics of miner's lamps, with a total of 128 people. Among them, 36 people were selected; Take two 32 people; The plane transported 44 people; Functional offices 16.

1 1: 06, Li Songde, the security department, reported that the mining area has been heavily guarded, the blocked vehicles have been cleared, and the roads are now clear.

1 1: 07 technical, electromechanical, communication, national defense and other departments send all kinds of drawings and materials to the dispatching room.

1 1: 06, Li Zibing reported that ambulances, medical equipment and medical staff were in place and stood by at the wellhead.

1 1: 15 Duke of ministry of materials and equipment reported that emergency relief materials have arrived at the designated place and are waiting for arrangement.

Personnel evacuation:

1 1: 15 dispatcher Ceng Tao ordered Cai Qixian to go to the wellhead to count the number of workers in a mining area.

1 1: 15 dispatcher Ceng Tao ordered Erhu Ruxiang to go to the wellhead to count the number of workers in the second mining area.

1 1: 65438+

1 1: 16 The dispatcher Ceng Tao instructed the department office Cheng Weiguo to go to the wellhead to count the number of functional departments and offices.

1 1: 25 extension leader Wang reported that all personnel below -270 meters were evacuated to -200 meters.

1 1: 38 extension leader Wang reported-/kloc-all personnel below 0/00 meters were evacuated to -37 meters.

1 1: 43, the shift supervisor of the auxiliary mine reported in the -37m parking lot that all the underground personnel were raised except Wang, the driver of the central pump house. Please count the number of people in time.

1 1: 48, the shift leader of the mine reported at the wellhead that Wang, the driver of the pump house, had safely ascended the well with two people.

1 1: 50, Guo Wei reported that all the staff in functional offices have been counted and all of them have been raised, with the number of *** 16.

1 1: 50, Cai Qixian, the first coal mine mining area, reported that all the personnel in this work area have been counted and all the wells have been raised, with 36 people.

1 1: 5 1, Hu Ruxiang in the second mining area reported that after counting, all the workers in this work area had been raised, with 32 people.

1 1: 52, Master Meng of Tuoyun work area reported that all the personnel in this work area have been counted, and all of them have been raised, with 44 people.

1 1:53, the dispatcher Ceng Tao reported to Dong Fuji, the commander-in-chief, that he had entered the well early 128 people, and all of them had been raised.

1 1: 55, the commander-in-chief Dong Fuji announced the end of the exercise.

Second, the exercise overall evaluation

1. All members of the company's emergency management leading group shall report to the dispatching room within 3 minutes according to the notification requirements. On 1 1: 03, Dong Fuji, the mine manager, announced the establishment of the mine emergency drill headquarters. Chief engineer, production manager Ge, safety manager Lv Changxin and electromechanical manager are appointed as deputy commanders, who are responsible for organizing, coordinating and directing mine emergency plan drills.

2. After receiving the notice, the emergency rescue teams of all units of the company should gather at the designated place within 5 minutes. * * * Assemble 5 teams with members 164.

3. The furthest working place is 35 17 coal mining face, where the workers received the evacuation order at 1 1: 00, and finally 1 people evacuated to the ground at 1 1: 43, which took 43 minutes.

4. According to the progress of the mine emergency plan drill, the mine manager Dong Fuji announced the end of the mine comprehensive emergency plan drill on 1 1: 55.

5. Mine comprehensive emergency drill Under the guidance of Yang, the leader of Ningyang County Coal Industry Administration Bureau, and with the strong cooperation of Feicheng Mining Group rescue team, through the joint efforts of all employees of the company, the emergency plan drill activities were ensured to proceed smoothly step by step and achieved the expected results.

6. Due to the leadership's great attention, perfect plan measures and strong organizational guarantee, the drill of mine comprehensive emergency plan has achieved the expected purpose.

This emergency plan drill lasted 55 minutes, 17 departments directly participated in the drill, and 292 people participated. During the drill, all departments of the company were able to respond to the accident accurately and quickly, perform their duties, act quickly and coordinate, all emergency measures were put in place, and personnel rescue was timely and effective, which achieved good expected results and achieved the purpose of the drill. During the drill, the dispatcher who participated in the drill was calm and able to report the abnormal situation and the progress of the drill to the relevant leaders of the mine quickly, and promptly notify all working faces to stop production and evacuate people. After hearing the evacuation order, the personnel in each work place listened to the command and quickly evacuated under the leadership of the team leader in their respective regions.

Third, the existing problems and corrective measures

Although the comprehensive emergency plan exercise has achieved the expected purpose, there are still some problems:

(1) Individual field commanders failed to report the situation to the disaster relief headquarters in time, which affected the overall command progress of the disaster relief headquarters;

(2) Organization and coordination need to be strengthened. After the arrival of the rescue team, the number of people reported should be counted and reported to the headquarters in time.

All departments of the Company shall formulate detailed rules for implementation according to Emergency Drill Plan for Stopping Production and Evacuating People in Severe Weather, so that the personnel of the department can fully master the drill and pay more attention to it, and practice more skills at ordinary times, so as to be "not surprised when something happens".

Fourth, the exercise experience

Stopping production and evacuating people in bad weather is a test of the rapid response and emergency response ability of all departments in our mine in the face of bad weather events, and it is also a process of learning and training to improve. Through this drill, it is of great help to improve the safety awareness of all personnel in our mine, improve emergency measures, and closely cooperate and coordinate after the accident. Safety responsibility is more important than Mount Tai. In the future work, we will establish a long-term mechanism for safe production to ensure safe production in mines.

Verb (abbreviation of verb) Key points of emergency management in the next step:

1, through the drill of mine comprehensive emergency plan, it fully shows that some employees pay insufficient attention to emergency work. Therefore, it is necessary to continuously carry out training and education, gradually improve the emergency awareness of all employees of the company, and ensure the comprehensive and healthy development of mine emergency management.

2. The company's emergency management leading group shall regularly organize special work meetings to study and deploy the next emergency management work and the repair of emergency plans. In order to ensure that mine emergency management and mine emergency plan adapt to and meet the actual needs of mine safety production.