Power plant quarterly work schedule template

Power Plant Quarterly Work Schedule Template

The power plant has a lot of work, heavy tasks, safety management work is arduous, the need for a reasonable plan to arrange the work, to ensure that the work is organized. Below is my compilation of "Power Plant Quarterly Work Planner" for your reading,reference. I hope you can gain!

Power Plant Quarterly Work Planner

Overall goal:

1, economic benefits target: complete or overcomplete the company's power generation tasks;

2, safety goals: to achieve safe and economic operation; no personal accidents with minor injuries and above; no responsible Equipment accidents; no fire, flood control liability accidents;

3, the production target: the main equipment integrity rate of 100%; relay protection and automatic device correct rate of 100%; the main equipment deletion of the monthly completion rate of 100%; power generation equipment forced outage number of no more than 0.5 times/year;

4, the site of the civilized production target: to keep the site of the organization of the production, neat and clean, and to achieve a civilized production.

In order to achieve the above objectives at all levels, now the specific work plan is as follows:

First, the quality of the completion or over completion of the company's power generation targets

Power generation is an important indicator of the economic operation of the power station, in order to ensure that the power station's economic benefits, operation and maintenance of the power station to continue to take the necessary measures:

1, through the January unit of the power station and the second unit and the March of the double unit of the power station, the power station and the second unit of the power station. Second unit in January and March on the double power station unit one, two units and three units of minor repair work, check the unit status, eliminate unit defects, for the flood season to create conditions for stable operation.

2, through the maintenance plan to improve the terms of the maintenance program, improve the quality of equipment maintenance, equipment maintenance, careful operation, to achieve? Zero-defect management of equipment?

3, the development of a thorough work plan, so that the implementation rate of the work plan control in more than 90%. In the equipment operation, overhaul before, fully prepared, in advance of the drill, in order to ensure safety under the premise of minimizing the operating time, reduce the power loss caused by long operating time.

4, according to the specific situation after the commissioning of the dual power station, improve the load analysis, in order to ensure that the power generation on the basis of further exploration to reduce the rate of water consumption, the effective use of the limited amount of water, to reduce the abandonment of water and sediment siltation. Reasonable deployment of load, improve unit operating head, to achieve the benefits of equipment operation.

5, through the past summary of the plant power consumption rate to summarize and analyze, continue to dig deep energy-saving potential; for dual power stations should be based on the characteristics of the equipment, feel to try to energy-saving means to reduce the rate of plant power consumption.

6, actively cooperate with the company's operating personnel, according to the actual situation of the site, to provide more power generation information.

7, proactively work in harmony with the scheduling, training duty personnel and provincial regulators to coordinate their work; centralized control center daily grasp of the water situation, the relationship between reservoir level and load, the relationship between the two stations of power generation water consumption and time difference, in a timely manner, with the company and the provincial regulator to contact, to ensure that the power station's economic operation.

8, the strict implementation of? Two votes, three systems?

8, the strict implementation of the "two votes, three systems", standardize the work behavior of employees, to eliminate the economic losses caused by security factors.

9, strict control of the load curve, the control of the load curve to take the triple gatekeeper, to eliminate human factors caused by the generation of unqualified power.

Second, the establishment of a scientific equipment maintenance management system to ensure the healthy operation of equipment

The health status of the equipment directly affects the economic operation of the power station, the safe operation of the power station has a direct link. Operation and maintenance of power stations according to the requirements of professional management of hydropower stations, according to years of experience in operation and maintenance management, the establishment of scientific and systematic equipment maintenance management.

(a) according to the maintenance plan, standards, careful maintenance of equipment

1, according to the maintenance plan bylaw clauses, strengthen the training and drills, according to the "Equipment Annual Maintenance Plan" and ? The terms of the rules? Develop a corresponding monthly maintenance plan;

2, improve the equipment? Cross maintenance? method, namely: cleaning, adjustment, fastening, lubrication, anti-corrosion. According to the site equipment operation, the specific equipment or specific components to implement regular? Cross maintenance?

3, the establishment of equipment maintenance standards, with reference to the relevant standards, manufacturers of technical information to prepare and improve the quality of overhaul equipment and process standards, overhaul the quality of the point of effective supervision and control;

(b) the establishment of online monitoring of equipment to reduce the generation of equipment defects

1, through the instruments, meters and human sensory monitoring of the equipment on-line, through the Data analysis and comparison, in advance to know whether the equipment is going to fail.

2, the existence of defects in the equipment to establish the appropriate file, strengthen the number of inspections, the development of defects tracking, so that the equipment running with the disease in the scope of monitoring, such as: when the discovery of a piece of equipment with oil seepage phenomenon, it will be the phenomenon of its record, record the development of oil seepage from the oil leakage of the time, oil leakage intervals, etc., to determine whether or not to carry out overhaul, and reasonably arranged for the elimination of the low tide.

(C) Establish standardized maintenance management. Standardized maintenance operations, related to the maintenance quality of equipment, equipment life, etc., is to ensure the healthy operation of equipment management system.

Power Plant Quarterly Work Schedule

(a), the implementation of the responsibility for safety management, and consolidate the foundation of safety work

In the safety management, we have to conscientiously implement the upper two levels of the company's safety management regulations, consolidate the basic management of safety production, and improve the long-term mechanism of safety production; one will be the 201x annual safety The first is the annual safety target of 201x level by level decomposition, layer by layer implementation, and effectively achieve clear responsibilities, implementation to the person; second is the strict implementation of safety management regulations, continue to improve the production safety management system, to ensure that the production safety work is rigorous, standardized; third is the use of unit overhaul and spring prevention, the timing of the fall check to seriously eliminate equipment defects and hidden problems, improve equipment safety, environmental protection, reliability and economy, to maintain a long cycle, zero non-stop safety production target The fourth is to effectively strengthen the whole process of safety production management of the three-phase expansion project, attach great importance to safety and civilized construction, enhance the sense of responsibility, strengthen the coordination and supervision of the construction unit, increase the rewards and penalties assessment of safety management, to ensure that no infrastructure safety accidents; Fifth, is to grasp the management of hazardous sources and dangerous points, do a good job in the analysis and control of hazardous points, prevent and control misoperation accidents, through the development of frequent safety Drill and improve the critical plan to ensure that the critical rescue effective protection; attach great importance to fire prevention, flood control and traffic management, to ensure that no liability accidents.

(2), strengthen the production management, to ensure the safe and economic operation of the unit

In the production management we have to combine the power generation index is small, the summer single machine operation of the favorable opportunity to increase the staff training efforts, through the organization of skills training courses and business knowledge learning lectures and other ways to comprehensively cultivate conformity-type production personnel for the three-phase expansion project to provide the preparatory personnel, to ensure that the new unit put into operation after the demand for technical personnel. The company's business is to provide the best possible service to its customers.

In operation management, we have to improve the ability of operation personnel to analyze and deal with abnormal conditions, improve various technical measures and anti-accident measures, and strive to achieve zero non-stop, long cycle and economic and environmental protection of the unit's stable operation, to ensure that the unit is stable, and more hair, attach great importance to the unit's water, oil, electricity and environmental protection work, through the index competition, incentives for the operation of the staff of the diligent inspection and adjustment, to further improve the safety, environmental protection and environmental protection of the unit, to ensure that the unit is not only safe but also the most efficient. The company also emphasizes on water saving, oil saving, power saving and environmental protection.

In overhaul management, it is necessary to strengthen process control, further improve the overhaul process flow, fully implement the overhaul quality acceptance, cultivate the meticulous work attitude of overhaul personnel, increase the management of defects assessment, implement the management of defects discovery, registration, elimination and acceptance of the program, conscientiously rectify and rectify defects and hidden dangers raised in the ____ company's safety inspections, and practically improve the health level of the equipment, and create a safe and civilized production environment. Create a safe and civilized production environment.

(C), strengthen business management, to achieve cost-effective operation

In business management to complete the annual operating targets as the central task of the year's work, refine the decomposition of the annual operating targets, in-depth economic analysis activities, strict control of expenses and fixed costs, the implementation of the contract management, increase financial supervision, effectiveness of the work of supervision and internal audit efforts to plug management loopholes, effectively reduce financial and operational costs. Plugging management loopholes, effectively reducing financial risks and financial costs,

Comprehensive implementation of budget management, to ensure that the costs and expenses are controllable; strengthen equipment, operation, maintenance management, maintain a good state of the equipment, improve the unit's ability to operate stably and the heating period of the long cycle of operation, in order to complete the plan to provide protection of electricity, strengthen fuel management, timely and fuel management departments, coal mining enterprises and transport vehicles The coordination, communication, increase the summer coal storage efforts, control the loss of calorific value of coal, strengthen fuel management, special management of production oil, monthly assessment; efforts to reduce the loss of fuel in all aspects, through the refinement of the management to reduce fuel costs.

(D), increase marketing management, to ensure that the full amount of heat recovery

In marketing management, we must vigorously carry out quality service work, and constantly improve the staff's sense of service, in the non-heat user transformation has achieved good results on the basis of continuing to assist users in the transformation of the heating system, and constantly improve the quality of heat supply to ensure that the full recovery of the heat fee, increase the work of the supply and marketing efforts to ensure that the third phase of the expansion unit next year to meet the expected results. Next year, the three-phase expansion unit to reach the expected heating area, strict network fee collection, reduce the pressure on operating funds; transformation of the primary network corrugated compensator for bidirectional compensator, according to the weather changes in time to adjust the heating load of the heat source point, and strive to do Hongzhu heat source point early stop, late start, reduce production costs.

(E), to strengthen the three expansion management, to ensure that the year heating, power generation double cast

I plant the three heating unit expansion work, related to the future development of enterprises, for which we have to tightly focus on? Early approval, early start? This main line, pay close attention to the approval, environmental approval and other key to carry out the work, to ensure that the beginning of the year to start construction, the end of the power generation, heating double put into operation, in the construction of the project, to give full play to our valuable experience in the past infrastructure projects, carry forward the staff can suffer, can fight the good style, relying on the scientific organization and strict management, in accordance with the? Accelerate the progress of the project, shorten the construction period, control the cost of the project, ensure the quality of the project? The requirements of the strict implementation of infrastructure management procedures, adhere to the process of standardization, and constantly improve the quality of commissioning, to achieve the standard commissioning, to ensure the realization of safe, stable and economic operation, in earnest to carry out infrastructure construction at the same time, but also in advance to arrange for staff training, to ensure that the production of personnel to participate in the project as soon as possible to ensure that production readiness for the smooth operation of the unit after commissioning and safe production of a good foundation.

(F), the creation of conservation and environmental protection enterprises, and solid promotion of environmental protection and energy saving and emission reduction

Energy saving and emission reduction is the responsibility of our thermoelectric enterprises, but also to improve our competitiveness of the inherent needs of this I

We have to actively implement the environmental protection department and the Group on the environmental protection of the work of the relevant requirements, and to further strengthen the management of environmental protection, regardless of the form of operation of the severe, be sure to complete the energy-saving and emission reduction, and to ensure that the work of the Group is not only to ensure the safety and efficiency of the Group. severe, we must complete the energy saving and emission reduction and environmental protection targets, seriously implement the rectification of the State Ministry of Environmental Protection's hearing, timely reporting of environmental protection approvals, and strengthen the contact and communication work to ensure that no environmental penalties occur.

In the work of energy saving and emission reduction, we must create energy-saving and environmentally friendly enterprises as an opportunity to widely carry out the unit energy efficiency benchmarking and benchmarking work, in-depth development of coal, water, electricity and pollutant emission target management, seriously do a good job in the debugging of desulphurization facilities and operational management to ensure that the desulphurization facilities play a role in doing a good job in the dust collector retrofitted with bags of dust removal transformation work, and strive to put into operation as soon as possible; and further Improve the pollutant discharge online monitoring system, improve the reliability of environmental protection facilities and commissioning rate, and strive to realize the development of saving, clean development.

(VII), strengthen the party building work, create a harmonious enterprise

In the party building work, we have to focus on the central work of the enterprise, with a highly responsible sense of mission, sense of responsibility, and make great efforts to grasp the scientific concept of development of the rectification project, and actively explore the establishment of consolidation of the results of the activities of the long-term mechanism; continue to carry out the ? Four Goods Team creation activities to improve the cohesion and combat effectiveness of the leadership team; strengthen the party's clean government, strict? Threefold and one big? Decision-making system, to build an effective system of punishment and prevention; to strengthen the letter and visit and stability work, really solve the practical difficulties of employees, to avoid the emergence of group events affecting stability; to play the role of trade unions, youth workers, women's work committees and other organizations, and widely carry out labor competitions to stimulate the enthusiasm of the staff's labor; and continue to improve the staff's production, living conditions for the successful completion of the tasks of the development of a harmonious and stable The new company has been working hard to improve the environment of the company and to create a harmonious and stable development environment.

A new year, a new starting point. In the face of complex and severe business situation, heavy and arduous tasks, we need to conscientiously implement the two levels of the company's work deployment, continue to carry forward the pragmatic, hard-working style of work, unity and hard work, forge ahead and proactively do a good job of the work for the full completion of the performance appraisal objectives in 201x, and to promote the enterprise and good and fast hair development and hard work.

Power Plant Quarterly Work Schedule

Under the care and guidance of the company's leadership, all members of the power station through the past year's hard work, in the triumphant completion of the company's power station, switching station, based on the established objectives, with the owner of the acceptance, acceptance of the commissioning of the dual power station, and quickly carried out a large number of elimination of equipment, defects, site environmental remediation work, make a good and fast development of the enterprise, and strive to achieve the goals. The company also quickly carried out a lot of work to eliminate equipment defects and improve the site environment, so that the safety and production conditions of the dual power stations were quickly put on the right track and achieved better power generation revenue. In order to consolidate the results achieved in the past year, and strive to work in the new year to a higher level, the plan is as follows:

Overall goal:

1, economic efficiency goals: complete or overcompletion of the company's power generation tasks;

2, safety goals: to achieve safe and economic operation; no personal injuries and accidents; not responsible for the equipment Accidents; no fire, flood control accidents;

3, production goals: the main equipment integrity rate of 100%; relay protection and automatic devices correct rate of 100%; the main equipment deletion of the monthly completion rate of 100%; power generation equipment ___ out of service no more than 0.5 times / year;

4, civilized production goals: to keep the production site organized, neat and clean, and to achieve civilized production.

In order to achieve the above objectives at all levels, now the specific work plan is as follows:

First, the quality of the completion or over completion of the power generation targets issued by the company

The power generation is an important indicator of the economic operation of the power station, in order to ensure that the power station's economic benefits, operation and maintenance of the power station to speak to continue to take the necessary measures:

1, through the January unit of the power station and the second unit and the March of the dual unit of the power station and the power station. Second unit in January and March on the double power station unit one, two units and three units of minor repair work, check the unit status, eliminate unit defects, for the flood season to create conditions for stable operation.

2, through the maintenance plan to improve the terms of the maintenance program, improve the quality of equipment maintenance, equipment maintenance, careful operation, to achieve? Zero-defect management of equipment?

3, the development of a thorough work plan, so that the implementation rate of the work plan control in more than 90%. In the equipment operation, overhaul before, fully prepared, in advance of the drill, in order to ensure safety under the premise of minimizing the operating time, reduce the power loss caused by long operating time.

4, according to the specific situation after the commissioning of the dual power station, improve the load analysis, in order to ensure that the power generation on the basis of further exploration to reduce the rate of water consumption, the effective use of the limited amount of water, to reduce the abandonment of water and sediment siltation. Reasonable deployment of load, improve unit operating head, to achieve the benefits of equipment operation.

5, through the past summary of the plant power consumption rate to summarize and analyze, continue to dig deep energy-saving potential; for dual power stations to be based on the characteristics of the equipment, feel to try to energy-saving means to reduce the rate of plant power consumption.

6, actively cooperate with the company's operating personnel, according to the actual situation of the site, to provide more power generation information.

7, proactively work in harmony with the scheduling, training duty personnel and provincial regulators to coordinate their work; centralized control center daily grasp of the water situation, the relationship between reservoir level and load, the relationship between the two stations of power generation water consumption and time difference, in a timely manner, with the company and the provincial regulator to contact, to ensure that the power station's economic operation.

8, the strict implementation of? Two votes, three systems?

8, strict implementation of the "two votes, three systems", standardize the work behavior of employees, to eliminate the economic losses caused by security factors.

9, strict control of the load curve, the control of the load curve to take the triple gatekeeper, to eliminate human factors caused by the generation of unqualified power.

Second, the establishment of a scientific equipment maintenance management system to ensure the healthy operation of equipment

The health status of the equipment directly affects the economic operation of the power station, the safe operation of the power station has a direct link. Operation and maintenance of power stations according to the requirements of professional management of hydropower stations, according to years of experience in operation and maintenance management, the establishment of scientific and systematic equipment maintenance management.

(a) according to the maintenance plan, standards, careful maintenance of equipment

1, according to the maintenance plan bylaw clauses, strengthen the training and drills, according to the "Equipment Annual Maintenance Plan" and ? The terms of the rules? Develop a corresponding monthly maintenance plan;

2, improve the equipment? Cross maintenance? method, namely: cleaning, adjustment, fastening, lubrication, anti-corrosion. According to the site equipment operation, the specific equipment or specific components to implement regular? Cross maintenance?

3, the establishment of equipment maintenance standards, with reference to the relevant standards, manufacturers of technical information to prepare and improve the quality of overhaul equipment and process standards, overhaul the quality of the point of effective supervision and control;

(b) the establishment of online monitoring of equipment to reduce the generation of equipment defects

1, through the instruments, meters and human sensory monitoring of the equipment on-line, through the Data analysis and comparison, in advance to know whether the equipment is going to fail.

2, the existence of defects in the equipment to establish the appropriate file, strengthen the number of inspections, the development of defects tracking, so that the equipment running with the disease in the scope of monitoring, such as: when the discovery of a piece of equipment with oil seepage phenomenon, it will be the phenomenon of its record, record the development of oil seepage from the oil leakage of the time, oil leakage intervals, etc., to determine whether or not to carry out overhaul, and reasonably arranged for the elimination of the low tide.

(C) Establish standardized maintenance management. Standardized maintenance operations, related to the maintenance quality of equipment, equipment life, etc., is to ensure the healthy operation of equipment management system.

Third, seriously implement the hydropower plant power quality, metal, chemical, insulation, thermal, electrical measurement, environmental protection, relay protection, energy saving and dam work ten aspects of technical supervision.

At present, the ten technical supervision has begun to establish, plan to complete in the first half of the year, the establishment of the relevant accounts, the second half of the year on the start of the ten technical supervision of continuous improvement, according to the requirements of the technical supervision of the corresponding work plan, summary of the work and the relevant records. The establishment of technical supervision network, clear responsibilities of personnel at all levels.

Fourth, safety management

Operation and maintenance of power stations through the development of strict safety management, the goal is to achieve ___ annual safe and economic operation; no minor injuries, serious injuries; no equipment accidents; no fire, flood control accidents.

1, constantly improve the safety management system, clarify the departments, positions of personnel safety responsibilities, do a good job security control;

2, do a good job safety inspection and safety assessment management, complete the annual safety inspection, safety evaluation, pre-holiday safety inspections and special inspection plan, the inspection of hidden security problems timely rectification;

3, do a good job anti-accident measures plan and Safety and technical labor protection measures plan;

4, do a good job of staff safety education, organize staff to learn the national guidelines on electric power production safety, policies, decrees and regulations; learning safety management regulations, operation and maintenance procedures, technical procedures for special types of work; to electric power production of accident cases combined with the actual situation of the unit to sum up the experience and lessons learned and the development of appropriate preventive measures; regular anti-accident studies, fire drills and fire drills. Anti-accident learning, fire drills and flood control drills.

5, do a good job of special tools, safety equipment, electrical equipment management, according to the required time to do the inspection of safety equipment, do a good job of safety equipment account management.

6, do a good job of fire management, set up a fire team organization, clear security responsibilities at all levels, and develop specific measures for fire prevention.

Fifth, the site of civilized production management

Through the site of 5s management, continue to consolidate and deepen the level of site management of the station, improve the site management of the switching station, and completely change the current situation of the double power station production site, and in the year to make the double power station site civilized production management basically reached the level of first-class hydropower plant management.

1, through the standardization of grooming, speech and behavior, to establish the external image of the power station;

2, improve the equipment, facilities, labeling work, so that the site to achieve visual management;

3, continuous improvement of the ?5s? activities, the establishment of the ?5s? activities to implement the plan.

Six, technical data management

The operation and maintenance of the management process of the original records, drawings, information and other scientific management, taking into account the paper data records are not easy to access, operation and maintenance of the power station to further improve the database management system and the formation of a management system, part of the important records using the database and the manual records of the two ways at the same time, the management of the database to use regular Backup. Sound all the books, tables and ledgers, this year, constantly on the need for continuous improvement of technical information.

1, drawing data classification, regular sorting, labeling, on-site wiring replacement, timely modification of drawings;

2, field ledger through database management, prior to the classification of all the technical ledger, requiring the operation of the duty officer will be related to the classification of technical information, data, etc. entered into the computer, the formation of a system, and regular back-up;

3, the operation of the maintenance of power plants Need to improve and perfect the following books, tables, ledgers and records:

DC insulation resistance record of generator, DC insulation resistance record of motor, DC insulation resistance record of transformer, circuit breaker switching records, maintenance records, equipment fuel consumption records, equipment regular test rotation records, relay protection and automatic device records, unit vibration and oscillation records, equipment defects records, lightning arrester discharge records, gate head water level periodic calibration, and the record of the water level of the gate. Records of regular calibration of gate head water level, operation log, operation records of monitoring devices, equipment temperature measurement records, equipment inspection records, work ticket records, intermittent records of work tickets, records of insecurity, records of accident forethought, records of operation analysis, records of questioning and explaining, records of grounding and dismantling, records of tour inspection, records of opening and closing operations of gate head gates, electricity statistical tables, flow ledgers, load curve execution tables, production The situation briefing, water statements, company statements, electrical monthly statements, mechanical monthly statements, electrical measurement supervision records, power quality supervision records, chemical supervision records, environmental protection supervision records, relay protection supervision records, insulation supervision records, metal supervision records, energy-saving supervision records, thermal supervision records, dam workers supervision records.

4, according to the operation of equipment over the past year, complete the "dual power plant operating procedures", "Jiuzhai centralized control center operating procedures" for the first time to amend the work;

5, the preparation of writing the "dual power plant maintenance procedures", collect information on the "dual power plant maintenance procedures" to improve and reported to the company for review and approval;

VII, equipment management

In order to get better Power station and gate head, power station and gate head, Jiuzhai centralized control center and switching station equipment management, improve the following equipment management in ___:

1, equipment history management, improve the dual power station and gate head equipment base database, further verification of the power station, gate head and switching station equipment base database, the equipment variance verification to ensure that the equipment information for the latest.

2, equipment defects management, do a good job of recording and eliminating equipment defects, record the elimination of defects, the defects not eliminated in time to establish equipment defects tracking records. The annual defects of the power station are controlled within 30 items, and the elimination rate reaches more than 90%. Dual power station annual defects control within 60, elimination rate of more than 90%.

3, do a good job of equipment overhaul work, work in strict accordance with the process steps, quality standards construction, while doing a good job of standardized overhaul work. After the maintenance work, do a good job of detailed maintenance of equipment delivery.

4, do a good job of equipment acceptance, before the overhaul work, according to process standards, overhaul the quality of the preparation of equipment acceptance criteria, after the end of the overhaul, according to the content of the overhaul, in accordance with the acceptance criteria for the acceptance of equipment. Minor repairs and the following overhaul, according to the principle of two-level acceptance; transformation, minor repairs and more overhaul according to the principle of three-level acceptance;

5, the establishment of the equipment reliability management system, do a good job of reliability data statistics and information management;

6, do a good job of ___ years of equipment ratings;

7, do a good job of the management of special equipment (such as: pressure vessels, lifting machinery)

VIII, complete staff training

___year training objectives: each employee proficiency in equipment performance, operating skills, focusing on mastering equipment accidents, failures, abnormalities in the treatment and disposal, improve equipment maintenance skills.

1, the systematic preparation of staff training programs, implemented by the operation and maintenance management engineers and checked by the project chief engineer, take regular and occasional exams, check the implementation of training and results;

2, through the team focused on learning, summarizing the individual maintenance skills, and mutual exchanges to achieve a person will be everyone will be;

3, to strengthen welding, lifting of special types of work Training, regular special types of work to reflect the power plant to receive training;

4, combined with the actual situation, do a good job under different circumstances of the anti-accident, flood control, fire and the whole plant emergency plan drills, and make a good record of checking the staff on the above drills to learn the situation.

5, through the standby watchman and the new watchman's intensive training, the rapid transformation of its business level, so as to improve the overall business level of the power station.

Nine, material management

1, continue to improve the material management regulations, detailed plans for material procurement, minimize the temporary procurement of materials;

2, the procurement of materials in a timely manner into the warehouse, regular inventory, to ensure that the three unity? three unified?

3, on the inventory of spare parts materials to strengthen the maintenance management, to avoid material inventory period damage, loss.