What issues should be considered in the design of the equipment room subsystem?
(1) the ideal location of the equipment room should be set in the middle of the building integrated wiring trunk line. (2) The size of the equipment room should be based on the intelligent building building scale, the use of a variety of different systems, the number of installed equipment, network structure requirements and future development and other factors. (3) The equipment room is a special room for installing various equipments, which has high environmental requirements. Temperature should be 10-27 degrees Celsius, relative humidity should be maintained at 60-80 ℅ (4) equipment room should prevent the intrusion of hazardous gases, and have good dust control measures. (5) equipment room must ensure that the net height should not be less than 2.55 meters, in order to install equipment into. (6) equipment room with general lighting. (7) equipment room should have a reliable AC power (0HZ, 220V) power supply. (8) equipment room size should meet the requirements.