1. When organizing the feasibility demonstration of construction projects, there should be the contents of occupational safety and health demonstration, and the demonstration results should be included in the feasibility demonstration documents.
2 in the preparation (or approval) of the construction project plan, the technical measures and facilities required for occupational safety and health should be prepared (approved) and included in the investment control number.
3 construction projects in the feasibility study, preliminary design review and completion acceptance, should promptly notify the labor department to participate in relevant meetings, provide relevant documents and materials.
4. In the management of construction projects, we should conscientiously implement these provisions, and make corresponding provisions in the relevant documents of construction project management, and urge and inspect the construction, design and construction units to strictly implement these provisions.
5 responsible for the annual plan of the construction project of this department and the labor department at the same level. Article 5 The construction unit shall be fully responsible for the implementation of the "three simultaneities" of occupational safety and health in construction projects.
1. When preparing the construction project plan and financial plan, the corresponding investment required for occupational safety and health should be included in the plan and prepared at the same time. The original occupational safety and health measures of imported technology and equipment shall not be reduced. If there are no measures or ineffective measures, domestic supporting investment plans should be prepared at the same time, and good working conditions should be ensured after the construction project is put into production.
2. Before the joint review of the preliminary design, the occupational safety and health evaluation report and preliminary design of the proposed construction project (including "Special Articles on Occupational Safety and Health" and "Preliminary Design Approval Form for Occupational Safety and Health of Construction Project") and relevant drawings must be submitted to the labor department.
3. The construction unit shall put forward specific requirements for the units undertaking the design and construction of construction projects, ensure that the design and construction of construction projects meet the requirements of these Provisions, and be responsible for providing necessary information and conditions. Responsible for supervising and inspecting the implementation of "three simultaneities" in the design and construction process.
4. In the debugging stage of production equipment, the occupational safety and health equipment and measures should be debugged and evaluated at the same time, and their effects should be evaluated. Occupational safety and health should be included in personnel training. Complete occupational safety and health rules and regulations should be formulated.
5. 20 days before the acceptance of the construction project, a special report should be written on the operation of occupational safety and health equipment in trial production, the effect of measures, test data, existing problems and measures to be taken in the future, together with the Approval Form for Occupational Safety and Health Acceptance of Construction Projects, and submitted to the labor department for examination and approval.
6. For the improvement opinions on occupational safety and health put forward in the acceptance, we should actively arrange manpower, material resources and financial resources to solve them on schedule, and report the rectification situation to the labor department in time. Article 6 Design units shall be responsible for the design of occupational safety and health facilities for construction projects.
1. When the feasibility of a construction project is demonstrated, the working conditions of the proposed project shall be demonstrated and evaluated at the same time.
2. When preparing the preliminary design documents, a special article on occupational safety and health should be prepared at the same time.
3. In the preliminary design, the existing occupational safety and health regulations and technical standards should be strictly observed. We should fully consider the requirements of safety and prevention of occupational hazards, and be responsible for the design work.
4. In the technical design and construction drawing design, it is necessary to constantly improve the measures and contents related to occupational safety and health in the preliminary design, and implement the occupational safety and health opinions put forward in the joint examination of the preliminary design from the design.
5. If there is any change in the design scheme involving occupational safety and health issues, it shall be approved by the labor department. Article 7 The construction unit shall be responsible for the quality of occupational safety and health facilities of construction projects.
Construction should be carried out in strict accordance with the construction drawings and design requirements, and the safety and health project should be constructed simultaneously with the main project to ensure the quality of the project. Article 8 Labor departments at all levels shall exercise state supervision over the implementation of the "three simultaneities" of occupational safety and health technical measures and design of construction projects.
1. Attend the feasibility demonstration meeting of construction projects, and be responsible for reviewing the contents of occupational safety and health demonstration in the feasibility demonstration documents.
2. In the preliminary design review, the occupational safety and health evaluation report and preliminary design documents submitted by the construction unit shall be carefully reviewed, and the review opinions shall be promptly fed back to the construction unit. When attending the joint hearing meeting, the examination opinions shall be put forward.
3. To examine and approve the special articles on occupational safety and health submitted by the construction unit, the preliminary design approval form for occupational safety and health of construction projects and the acceptance approval form for occupational safety and health of construction projects.
4. When attending the completion acceptance meeting of the construction project, the implementation of the "three simultaneities" of the construction project and its actual effect should be strictly reviewed according to the contents of the special report on trial production occupational safety and health and the preliminary design approval form submitted by the construction unit.
5. Construction projects shall not be put into use without the examination or consent of the labor department; Otherwise, the labor department has the right to refuse to handle labor services with the construction unit.
6. If an accident occurs in a construction project that is forcibly put into production or causes serious occupational hazards, the responsibility of the approved production personnel shall be investigated.