First, what matters should be paid attention to in the renovation of new houses?
1. Reserve enough sockets: In daily life, we generally need to use a lot of electrical equipment, and with the passage of time, more and more electrical equipment will be added. If the prepared sockets are insufficient, it is necessary to use cuttings for wiring later, which not only affects the indoor beauty, but also is inconvenient to use, and may also lead to safety hazards.
2. Waterproof measures: For areas with large water consumption, such as balconies, kitchens and bathrooms. Waterproof measures must be taken to avoid affecting normal life in the later period. In addition, waterproof and sealing measures should be taken around the roots of pipes, the bottom of toilets and floor drains to avoid leakage.
3. Indoor pollution control: After the renovation of new houses, there will always be a lot of harmful substances such as formaldehyde and benzene indoors, which will have an impact on human health. Therefore, we suggest that you must take effective measures to clean up indoor pollution, such as asking a third-party company to help clean up, and placing tea stems or green plants indoors. So as to reduce the indoor formaldehyde content to the standard that people can live in.
Second, what are the ways to decorate the new house?
1, all inclusive:
All-inclusive means that the owner only needs to pay, and the decoration company is responsible for all aspects such as decoration materials and decoration construction. The owner only needs to make a final audit of the decoration quality. If there are quality problems later, he can ask the decoration company for help.
Step 2 clear the package
Cleaning the package means that the owners choose their own decoration materials, and they need to prepare enough materials. The decoration company is responsible for the decoration construction. This kind of decoration will make the owners more hard and need to compare and buy decoration materials everywhere. Once the decoration materials are insufficient, they need to be purchased immediately.
3. Half a pack
Half-package means that the main decoration materials are purchased by the owners themselves, and the decoration auxiliary materials and decoration construction are the responsibility of the decoration company. The advantage of this decoration method is that the owner can strictly control the decoration cost and avoid increasing his own decoration economic pressure.