Electric shock emergency drill summary and reflection report sample (Selected 6)

? Activities to write a summary after the exercise, many people do not know how to write this summary, in order to understand the completion of this activity summary is still essential. The following is my collection of "electrocution emergency drill summary and reflection report sample (selected 6)", I believe it can help you.

Electric shock emergency drill summary and reflection report model (selected 6) (Part I)

? First, the source of danger

? Pumping machine switch box, distribution box, generator, line, electrical appliances and other leakage

? Storage location: operating site

? Second, the accident may

? There are many possibilities for personal electrocution on the construction site. Such as: unskilled operators, poor safety awareness, circuit switches installed on the zero line, cable joints are not wrapped or wrapped poorly, the cable line is aging and dragging the ground (especially in the wellsite when there is water), hitching in the operating equipment, derrick, pumping, oil pipeline and so on. All of these can lead to electrocution.

? Third, the accident state:

? An electrocution accident is extremely likely to result in the death of the electrocuted person

? Fourth, the emergency command system

?1, the command telephone

?2, the rescue team list and division of labor

? Group leader:

? Duties: overall responsibility for the command of the incident and communication

? Deputy leader:

? Duties: to assist the team leader to command and handle the accident Group member: Duties: on-site rescue

? V. Accident emergency measures

? When the construction well site occurs personal electric shock, should immediately organize personnel rescue.

?1, that is, cut off the power supply, if you can not cut off the power supply can not be used to directly pull the electrocuted body, must be used to dry sticks, insulated objects to pick open the power line, or stand on a dry board or wear insulated rubber-soled shoes, and then use a hand to pull the electrocuted person, so that it is out of the power supply to rescue (at the same time, send a person to call the report).

?2, after the electrocution, did not lose consciousness, the casualty should be carried to a warmer and air-circulating place to lie down and rest.

?3, after electrocution unconscious and have lost consciousness, but still breathing, should also be carried to a warmer place to rest and air circulation. If you find that the casualty is difficult to breathe or gradually weakened, it is necessary to implement mouth-to-mouth artificial respiration or supine chest pressure method for artificial respiration.

?4, after the electrocution, if the breathing, pulse are very weak or stop but still can not be considered dead, should be immediately implemented mouth-to-mouth artificial respiration and chest extrusion of the heart for rescue, until the medical personnel to emergency.

? Six, precautionary measures

?1, construction site crews with communication tools.

?2, each class is equipped with a power test pen, the use of electrical appliances, start the pumping machine must be used before the power test pen, hit the switch must wear insulated gloves. Insulated gloves are not allowed to be used for other purposes.

?3. Strengthen the training of post personnel to improve their technical level and practical ability.

?4, the development and improvement of the management system, clear job responsibilities, team leader, team cadres should always check, supervise the implementation of the system.

?5, team level, team should be in accordance with the provisions of the electricity line safety inspection, found exposed, aging, mopping, etc. should be promptly rectified before use.

?6, all employees to strengthen the first aid method training, so that workers can use effective rescue measures for the injured.

? Seven, the nearest hospital

?XXXX

? VIII. Evacuation location:

? Outside the well site

? Nine, help security

?1, communication security:

?2, safety and protection security:

? Insulated gloves 1 pair

? 1 insulated stick 1 first aid box

? Fire extinguishers: 2 35kg, 4 8kg (fire extinguishers are checked once a month) 2 fire buckets 2 fire shovels 2 asbestos quilts: 2

Summary of the emergency drill on electrocution and reflective report model (Selected 6) (Part II)

? First, responsible for the scene, its task is to understand and grasp the accident, the organization of the scene rescue command.

? Second, responsible for liaison, its task is according to the command order, timely arrangement of the scene rescue, maintain communication with the local construction administrative departments, labor departments.

? Third, responsible for maintaining on-site order, do a good job of the parties involved, the surrounding personnel questioning records.

? Fourth, responsible for the proper handling of the aftermath of the work, according to the function of categorization is responsible for maintaining communication with the local authorities.

? V. Emergency measures for electrocution accidents 1, the site personnel should be decisive to disengage from the power supply, as far as possible, immediately cut off the power supply (shut down the circuit), can also be used on-site to get the insulating material and other equipment to make the electrocuted personnel from the charged body. 2, the injured immediately out of harm's way, the organization of personnel rescue. 5, if the electrocuted person found to be respiratory or respiratory heartbeat are stopped, the injured person will be supine on the flat ground or flat plate immediately If the electrocuted person's breathing or heartbeat stops, lay the injured person on the flat ground or plate and immediately carry out personnel breathing or external cardiac compression. Immediately dial 120 to the local emergency center to get in touch with (hospitals in the vicinity of the hospital directly to the hospital), should be a detailed description of the accident location, the severity of the department's contact phone number, and send someone to the intersection to meet.4, that is, to the subordinate item of the Ministry of Management, the Group item of the Ministry of Management of the Emergency Response Leadership Group to report on the accident and seek support.

? Sixth, the maintenance of the scene order, close protection of the accident scene. Fourth, the emergency supplies standing drugs: disinfection supplies, first aid items (bandages, sterile dressings) and a variety of common small splints, stretchers, hemostatic bags, oxygen bags.

? Seven, communication and liaison hospital rescue center: 120 criminal police: 110 fire: 119 site duty phone: the person in charge of the phone: the project manager: cell phone: safety personnel: cell phone: the person in charge of technology: cell phone:

? Eight, precautions 1, in the absence of power supply, do not use your hands to pull the electrocuted. 2, the accident should be organized to carry out full rescue, depending on the situation, call 120 emergency telephone and immediately notify the person in charge. 3, pay attention to protect the scene of the accident, to facilitate the investigation and analysis of the cause of the accident. 4, cardiopulmonary resuscitation resuscitation measures should be adhered to constantly (including the hospital on the way) can not be given up. 5, the accident is a good example of how to prevent the occurrence of an accident, but also to prevent the occurrence of an accident.

The electrocution emergency drill summary and reflection report model (selected 6) (Part III)

? In order to strengthen the company's safety management, standardize the production site management and operational behavior, effectively prevent and reduce the losses caused by accidents, timely rescue of the accident, the development of this plan.

? First, emergency preparedness

?1. Organization and responsibilities

?1.1 Accident emergency rescue leadership group

? Leader: Deputy General Manager

? Deputy leader: safety director and deputy director, production manager

? Members: each workshop director and shift manager

? Duty phone: xxxx

?1.2 leadership group under the rescue group (leader: workshop supervisor 1), communication and liaison group (leader: human resources manager), evacuation guidance group (leader: workshop director), security alert group (leader: security team leader) and logistics support group (leader: purchasing manager, logistics manager, chief of electromechanical), the members of the group leader of the department personnel.

? Accident Emergency Rescue Leadership Group is responsible for emergency response to electrocution accidents occurring at the production site.

?2. Training and drills

?2.1 by the Ministry of production is responsible for hosting, organizing workshops once a year in accordance with the electric shock accident "emergency response" requirements for simulation drills.

?2.2 The members of the group according to their division of labor, coordination and cooperation to complete the drill.

? After the end of the exercise by the team leader to organize the evaluation of the effectiveness of the "emergency response", if necessary, the "emergency response" requirements to adjust or update.

?2.3 Records of exercises, evaluations and updates should be kept.

?2.4 The head and deputy head of safety are responsible for training relevant personnel once a year.

?2.5 The safety committee is responsible for checking the establishment of the emergency plan and rescue system.

?3. Preparation, maintenance and repair of emergency supplies

?3.1 Preparation of emergency supplies: simple stretcher, bruise medicine, bandage gauze.

?3.2 All kinds of emergency supplies should be equipped with complete and strengthen the daily management.

? Second, the emergency response

?1. detached from the power supply symptomatic resuscitation, when the occurrence of personal electrocution, the first to make the electrocuted person from the power supply. Rapid first aid, the key is "fast".

?2. For low-voltage electrocution, the following methods can be used to make the electrocuted person from the power supply.

?2.1 If there is a power switch or plug near the place of electrocution, you can immediately pull the power switch or unplug the power plug to cut off the power.

?2.2 Available with insulated handles of electrician's pliers, dry wood handle of the axe, dry wood handle of the shovel and so on to cut off the power line. Can also be used to dry wooden boards and other insulating materials inserted under the electrocuted person to isolate the power supply.

?2.3 When the power line on the electrocuted person's body or was pressed under the body, can also be used dry clothes, gloves, rope, boards, sticks and other insulators as a tool, pull open, raise or pick open the power line, so that the electrocuted person from the power supply, do not directly pull the electrocuted person.

?3. For high-voltage electrocution, the following methods can be used to make the electrocuted person from the power supply:

?3.1 Immediately notify the relevant departments of the power outage.

?3.2 Put on insulated gloves, insulated shoes, and use insulated tools of the corresponding voltage level to pull the switch in sequence.

?3.3 Use a high-voltage insulated pole to pick off the wires on the electrocuted person.

?4. If the electrocuted person is electrocuted while working at height, when disconnecting the power supply, prevent the electrocuted person from falling down and causing secondary injuries.

?4.1 If the electrocuted person is not seriously injured, conscious, but some panic, numbness of the limbs, general weakness or electrocuted person had a moment of coma, but has come to his senses, the electrocuted person should be quiet and rest, do not walk around, close observation and sent to the hospital.

?4.2 If the electrocution is more serious, has lost consciousness, but the heart beat and breathing still exists, the electrocution should be lifted to the air clear place, undressing, so that the electrocution of the person lying on their backs, and with soft clothes under the body, so that the head than the shoulders a little lower than to avoid impeding the respiratory, and pay attention to the heat insulation in the case of cold weather, and quickly sent to the hospital. If you find that the electrocution of breathing difficulties, spasms, should immediately prepare for the heart stops beating or respiratory arrest after the rescue.

?4.3 If the electrocuted person is seriously injured, respiratory arrest or cardiac arrest or both have stopped, should immediately carry out mouth-to-mouth artificial respiration and chest heart extrusion method of resuscitation, and sent to the hospital. On the way to the hospital, should not stop resuscitation, many electrocution is on the way to the hospital died.

?4.4 people electrocuted will find nerve paralysis, respiratory interruption, heart stops beating, showing unconsciousness, usually false death, never as a "dead man" hastily.

?4.5 For the electrocuted, especially the electrocuted falling from a height, pay special attention to the handling problem, many electrocuted, in addition to electrical injuries, there are also fall injuries, improper handling, such as broken ribs into the heart, etc., can cause death.

?4.6 For the false death of the electrocution, to quickly and permanently for the rescue, there are many electrocution, is after four hours or even longer time to rescue over. Only after a doctor's diagnosis to determine death, stop resuscitation.

?5. Artificial respiration is the first aid method applied after the electrocution stopped breathing. Various artificial respiration methods to mouth-to-mouth breathing is the most effective.

?5.1 Artificial respiration should be carried out quickly before the electrocution of the body to prevent breathing on the collar, shirt, etc. to take out the mouth to prevent breathing of food, dislodged broken teeth, blood clots, mucus, etc., so as not to block the airway, so that the electrocution of the person lying on their backs, and to make the head fully buckled tilted (can be used to drag the electrocution of the person's neck), nostrils facing up in order to facilitate the breathing of the free flow.

?5.2 Rescue personnel with their hands to make the electrocuted person's nostrils closed, breathing a mouth after the electrocuted person's mouth close to the inward blowing, the time is about 2 seconds. Blowing size, according to different electrocution people have different, each time the exhale to make the electrocution of the chest slightly bulging appropriate.

?5.3 Immediately after blowing, leave the mouth of the electrocuted person and relax the nose of the electrocuted person, so that the air is exhaled for about 3 seconds. Then repeat the blowing action. Blow evenly, about 12 times per minute. After the electrocuted person has begun to breathe freely again, the person should be carefully watched to see if breathing stops again. If stopped again, should continue to artificial respiration, this time artificial respiration with the electrocution of the weak free respiration rule consistent.

?5.4 If you can not make the electrocuted person to open the mouth, you can change the mouth to nose artificial respiration, that is, pinch the mouth tightly against the nostrils blowing.

?6. Thoracic cardiac compression is a first aid method for electrocution after the heart stops beating.

?6.1 to do chest extrusion so that the electrocuted person lying on his back in a more solid place, posture and mouth-to-mouth artificial respiration, the rescuer kneeling on the side of the electrocuted person or kneeling on both sides of the waist, the two hands stacked, the root of the palm of the hand on the top of the heart socket, the lower one-third of the sternum to one-half of the place. The root of the palm forcefully downward (the direction of the back of the spine) to squeeze out the blood inside the heart. Adults should squeeze 3 to 5 centimeters, to squeeze once per second, too fast for good results, 60 times per minute is appropriate. After squeezing, the root of the palm quickly relaxes all the way, allowing the electrocuted person's chest to recover automatically and the blood to fill the heart. The palm root does not have to leave the chest completely when relaxing.

?6.2 It should be noted that the heartbeat and breathing are not linked. When the heart stops beating, breathing will soon stop. When breathing stops, the heart does not beat for long. Once respiration and cardiac arrest have occurred, mouth-to-mouth resuscitation and chest compressions should be performed simultaneously. If there is only one person at the scene, alternate between the two methods. Can be squeezed 4 times after blowing once, and blowing and squeezing speed should be increased a little, in order not to reduce the effect of resuscitation.

? Third, the accident after treatment work

?1. Identify the cause of the accident and the person in charge.

?2. In writing to the field to write a report, including the occurrence of the accident time, location, casualties, name, gender, age, type of work, the degree of injury, injury parts.

?3. Develop effective preventive measures to prevent the recurrence of such accidents.

?4. Organize accident education for all personnel.

?5. Publicize the results of the accident to all personnel, and the treatment of the person in charge.

? Fourth, the end of the plan

?1. After the completion of all the plan, the person in charge of the original release of the start of the plan to announce the end of the plan, and at the same time to report to the general manager.

?2. 7 days after the end of the plan to assess the implementation of the plan.

? Assessment meeting hosts according to the level of the accident and management authority to determine the assessment report should be reported to the general manager. The assessment meeting for general accidents is presided over by this safety commissioner, and the assessment of serious and serious accidents is presided over by the company's designated personnel.

?3. The assessment of the plan to make a judgment on the right and wrong and conformity issues, not to discern the objective factors, the focus of the assessment is:

?3.1 plan timeframe is implemented.

?3.2 Whether the units and departments participating in the implementation of the plan are working according to the requirements of the plan, with or without omissions, faults, and who is responsible.

?3.3 management personnel involved in the implementation of the plan, the leadership of the plan according to the provisions of the organization to carry out the work, there are no omissions and faults, and who is responsible.

?3.4 Whether the emergency plan needs to be modified, how to modify.

? The department that hosts the assessment takes responsibility for the authenticity and conformity of the assessment report. For the departments and personnel at fault in the implementation of the plan, the safety committee should be responsible for the responsible person to put forward a clear criticism of the circumstances and the seriousness of the fault need to be given disciplinary action, the safety committee to put forward the views of the treatment of personnel cadres according to the jurisdiction of the authority of the personnel cadres reported to the approval of the level by level.

The emergency drill summary of electrocution and reflective report (selected 6) (Part IV)

? According to the safety of electricity "installed safely, dismantled thoroughly, used correctly, repaired in a timely manner," the basic requirements for the prevention of electrocution injuries to the operating requirements are:

?1, non-electrician is strictly prohibited from privately dismantling and connecting the electrical wiring, plugs, sockets, electrical equipment, electric lights and so on.

?2, the use of electrical equipment must be checked before the line, plug, socket, leakage protection device is intact.

?3, electrical lines or machinery failure, should find an electrician to deal with, non-electrician shall not repair or troubleshooting. The power distribution box, switch box for inspection, maintenance, must be before the first level of the corresponding power switch switching power, and hang the blackout sign, is strictly prohibited to work with electricity.

?4, the use of vibrators and other hand-held electric machinery and other electric machinery to engage in wet work, by the electrician to connect the power supply, the installation of leakage protector, the operator must be empty wearing insulated shoes, insulated gloves and then work.

?5, relocation or move electrical equipment must first cut off the power supply.

?6, handling steel, steel pipe and other metal objects, it is strictly prohibited to touch the wire.

?7 Prohibit the hanging of sunshine materials on the power lines.

?8 Prohibit the use of the illuminator baking, heating, prohibit the unauthorized use of electric stoves and other high-power electrical appliances and other electric heaters.

?9, in the overhead transmission lines near the work, should stop the transmission of electricity, can not stop the power, there should be isolation measures, to maintain a safe distance, to prevent touching.

?10, the power line must be overhead, not on the ground, construction work surface arbitrary drag, if you have to pass through the ground, construction work surface should be protected by the road, materials, cars, people are not allowed to trample grinding power lines.

The electrocution emergency drill summary and reflection report model (selected 6) (Part V)

? Electrocution is a common accident in highway and bridge construction. It is also the main type of personal injury and death accident in the enterprise. From the point of view of the final degree of injury to the electrocuted person, when the electrocuted person is rescued in time, the correct method is very likely to be saved. Preparation of emergency response plan for electrocution is to do our best to save the electrocuted injured from the death line back to the accident, the casualties reduced to a minimum.

? I. Scope of application of the plan

? This emergency plan applies to all employees engaged in the production of this project, in the workplace electrocution accidents, take responsibility for others electrocuted to implement emergency rescue. In the event of electrocution in other places, the obligation to provide emergency care to outsiders is assumed.

? Second, the simulation exercise

? Assuming that the electrocution accident occurred in the contract section of the project site, a project personnel accidentally touched the exposed wires, resulting in electrocution fell to the ground, the situation is very critical.

? Third, the time of the exercise

? Exercise time is scheduled for July 9, 20XX morning.10:00

? Fourth, the plan organization and responsibilities:

?1, electrocution accident emergency drill organization (commander-in-chief)

? Commander-in-chief: xxx

? Main responsibilities:

?a, fully responsible for the scene of emergency first aid work;

?b, decided to start the emergency plan;

?c, command emergency first aid work.

? Deputy commander-in-chief: xx, xxx

? Main responsibilities:

?a, organizing emergency first aid work;

?b, coordinating the unified scheduling work of all departments;

?c, responsible for the investigation, monitoring and first aid program determination.

?2, the composition of the groups:

? Accident Investigation Group:xx

? Medical rescue group:xx

? Vigilance and Liaison Group: xx

? Logistic Support Group:xx

? Field Operation Group: xx

? Responsibilities of each group:

? (1) Accident Investigation Group: Protect the scene and accident investigation.

? (2) medical rescue group: the main task is to rush to the scene of the accident in time to rescue electrocuted people, depending on the injury decided at the scene or the nearest hospital first aid, to ensure the safety of personnel life.

? (3) vigilance liaison group: the main task is to upload and send the leadership instructions and channeling traffic routes, and send people to the intersection to meet.

? (4) logistical support group: the main task is to follow the instructions of the commanding leader to arrange for the deployment of rescue vehicles and the timely supply of emergency funds.

? (5) field operation group: on-site emergency rescue, to understand the cause of the accident, the first time to the project manager to report the scene situation.

? Five, drill procedures:

?1, 10:00 a project personnel accidentally stepped on the exposed wires, resulting in electrocution fell to the ground, passing colleagues Zhang Wei saw immediately find a dry stick will be a wire dial away from the injured personnel and at the same time, call for help, the foreman of the foreman Li Enmin heard the call for help and immediately rushed to the scene, a preliminary understanding of the situation on the scene and the personnel injured and immediately reported to the project manager, xxx received a phone call, and immediately reported to the project manager. The project manager reported, xxx received the call immediately after the start of the emergency plan, and rushed to the scene.

?2, 10:03xxx arrived at the scene of the accident, to understand the situation on the scene, the telephone notification of the electrician to immediately disconnect the main switch to prevent the expansion of the injury, told the surrounding onlookers to evacuate the scene.

?3, 10:05 medical rescue team arrived at the scene, immediately on the casualty check, found that the casualty is more seriously injured immediately to take "mouth-to-mouth artificial respiration" and "cardiac extrathoracic compression method" on the electrocution personnel first aid.

?4, 10:07 alert contact group arrived at the scene, immediately set up the main intersection of the cordon and warning signs to ensure that the rescue channel is open.

?5, 10:09 accident investigation team arrived at the scene, the accident investigation team for the protection of the accident scene and forensics, and command rescue;

?6, 10:10 injured persons injured to get the initial control, xxx sent vigilance liaison group to the intersection of the emergency ambulance.

?7, 10:15 logistics support group led the emergency ambulance arrived at the scene, the injured to the hospital, xxx sent xx follow to the hospital, contact family members to do a good job of pacifying the work, and stay in the accident investigation team personnel on the scene whether there are other hidden dangers to investigate, vigilance personnel to do a good job of protecting the scene, waiting for the accident investigation.

?8, after the end of the rescue xxx to the resident office, director office, command report the accident,.

? Six, the end

?xx announced the end of the exercise

? Seven, comment

? The director of the Office, command, quality supervision station leaders to give instructions on the exercise process deficiencies, missing links, etc. to make comments.

? Eight, summarize

? Through this drill so that all of our construction workers more clear and clear emergency rescue plan rescue procedures. In response to emergencies to ensure the implementation of emergency plans in an orderly manner, for the rescue to buy time, to achieve the purpose of the exercise.

The electrocution emergency drill summary and reflection report model (selected 6) (Part VI)

? In order to improve the accident emergency rescue capacity of the project department, effectively dispose of unexpected accidents, establish and improve the scientific, effective and well-functioning emergency rescue system, test the practical effect of the emergency departments, organize and carry out a good project emergency rescue drill for electrocution accidents, and specially formulate this program.

? First, the guiding ideology and purpose of the exercise to implement the "safety first, prevention first, comprehensive management" policy, to establish and improve the project emergency management system, the formation of a unified leadership, timely response, scientific decision-making, disposal of organized emergency response system, and comprehensively enhance the project to cope with emergencies and risk capacity. Through the set accident emergency drill, test the feasibility and operability of the accident emergency rescue plan of the project department, improve the emergency team rescue and disaster relief ability, and constantly improve the overall level of emergency rescue work of the company, and effectively safeguard the project department employees' life and property safety.

? Second, the drill time, place and participating units

? (A) the drill time is proposed on June 29, 20XX.

? (B) the drill location Fangjiashan Project Department construction site.

? (C) drill participating units and personnel

?1, the project department leadership: general manager, quality assurance manager, HSE department manager, each construction team manager

?2, safety officers, part of the team, ambulance drivers, nurses.

? Third, the accident set up accident set up: June 29, 20XX, 9:30 am, employee × × × in the cutting operation, due to the aging of the power line insulation skin breakage led to the tertiary distribution box charged, when another employee × × × in the opening of the door of the distribution box electrocuted, the employee electrocuted coma, the situation is very critical. The employee who carried out the cutting operation found that he immediately took measures to provide first aid and reported to the HSE department.

? Fourth, the drill program and task division of labor

? (A), personnel arrangements

?1, commander-in-chief: project general manager deputy commander-in-chief: quality assurance manager

?2, group members: other leaders of the Department of managers, managers of various departments, each professional construction team / factory in charge.

?3, the participants: safety officers, shift personnel, ambulance drivers, nurses, ambulance personnel, integrated office personnel.

?4. Records and photography: HSE management room personnel as well as integrated office personnel

? (B), the exercise program: electric shock rescue

? (C), the preliminary preparations:

?1, the construction of safe use of electricity and anti-electrocution knowledge window publicity; (HSE Department, the integrated office is responsible for)

?2, the site of the temporary power facilities for inspection; (Ministry of Engineering, electrician class is responsible for)

?3, the site of the drill site layout. (HSE Department and the construction team is responsible for)

? (D), electrocution rescue specific arrangements:

?1, the collection of participants in the exercise;

?2, clean up the site, prepare the tools;

?3, listen to the safety management personnel.

?4, start the drill. Employee × × in the cutting operation, due to the aging of the power line insulation skin breakage caused by the tertiary distribution box charged, resulting in another employee × × electrocuted when opening the door of the distribution box. After the accident, each participating drill unit carried out rescue according to the following procedures and assigned tasks.

?1) 9:30 minutes, the employee × × electrocution, the cutting operation personnel found the accident immediately went to the main switch out to pull down the electric switch, quickly on-site first aid, and telephone report to the Ministry of HSE personnel as well as the higher leadership, the Ministry of HSE received the report immediately after the organization of personnel rescue and report to the higher level;

?2) 9:38 minutes, the Ministry of HSE rescue vehicles as well as paramedics arrived at the scene for first aid treatment. The HSE Department rescue vehicle and ambulance personnel arrived at the scene to carry out first aid treatment;

?3) 9:40 minutes, the project general manager or quality assurance manager received the report and quickly rushed to the scene of the accident, and simulated notification of the County Administration of Work Safety and the County Construction Bureau authorities;

?4) 9:45 minutes, the electrocuted person will be lifted into an ambulance and sent to the hospital for examination and treatment.

?5, focus on the content of the exercise:

?1) the site construction team in the report at the same time pulling the electric switch;

?2) at the scene of cardiopulmonary resuscitation and other methods of resuscitation;

?3) the injured will be sent to the hospital for examination and treatment;

?6, the end of the exercise (announced);

?7, clean up the scene.

? V. Exercise command and rescue action organization system and responsibilities

? According to the "Emergency Preparedness and Response Control Procedures", the major accident emergency rescue command, rescue action organization system and responsibilities are as follows:

? Commander-in-chief: general manager of the project, responsible for overall command.

? Deputy commander-in-chief (site command): quality assurance manager, responsible for construction site command.

? (A) medical rescue group: responsible for the emergency evacuation of the site personnel safety evacuation work, responsible for the transportation of injured people to the hospital treatment, responsible for the accident area alert work.

? (B) information liaison group: responsible for the accident scene communication and external contact.