Heat stroke prevention program measures (Selected 5)

Persistent high temperature days sweltering, heat stroke prevention and cooling do not ignore. Summer cooling is very important, so how about more scientific cooling? The following content is what I have organized for you "heat stroke prevention and cooling program measures (selected 5)", welcome to read, I hope you can like and share!

Prevent heatstroke program measures selected (a)

In order to ensure the smooth construction of the xx project, to ensure that in the construction of emergencies, emergency rescue work can be rapid and effective, to maximize the protection of the lives of enterprise workers, property safety, according to the characteristics of the project, specially formulated this plan.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work in the confusion of the emergency, so as to reduce casualties and property losses. Emergency in construction refers to the emergence of a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

Second, the establishment of construction emergencies emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the branch manager Sun Qi is responsible for the implementation, if the commander-in-chief out of the assistant manager Lu Zhili as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the team leader to implement. The implementation of rescue work, specific personnel arrangements see emergency plan organization.

Third, when the project and building construction in the occurrence of high temperature in a variety of emergency symptomatic situation, after receiving the emergency report, should immediately start this plan. In the first time, respectively, to the company emergency rescue command center, "120" ambulance center for help, and to the municipal work safety supervision bureau, trade unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of emergencies, the branch that is, as appropriate, set up a rescue site command, by the manager of the Sun Qi as the chief commander of the scene of the accident, and set up the following leading groups:

1, heat stroke protection group

summer work process, due to the more open-air working environment; personnel work in the distribution of the region is complex, variable; labor intensity, etc., to the work of many inconveniences, to the work of a lot of people. In order to protect the legitimate rights and interests of workers and life, property safety, for the staff to create a guaranteed, comfortable environment, in the staff of the occurrence of high-temperature adverse reactions, by the team leader to immediately organize the members of the group, the accident personnel transfer and control, to prevent the increase of accident personnel around the scene. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information liaison group

by the head of the group is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization of the collection of weather and temperature conditions, and then take the necessary precautions, and on the measures taken and the development of the situation, and timely reports to the superiors and the liaison of relevant departments.

3, safety and security (vigilance) group

The evacuation zone and resettlement area of the security work, the team leader is responsible for organizing team members to monitor the development of dangerous conditions, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the various shifts in order to further enhance the awareness of safety and the organization of the site management personnel to carry out a safety inspection of the construction site, to eliminate potential safety hazards, in order to prevent the occurrence of accidents and how to prevent accidents when they occur. The occurrence of accidents and how to minimize the impact of accidents once they occur.

4, on-site medical rescue team

When the accident occurs, the team leader organizes the team members on-site classification and first aid treatment of the injured, is responsible for the first time to the injured to implement effective rescue; and timely transfer to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; to concentrate, count, transport and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistical support team

by the head of the organization is responsible for mobilizing rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be nearby from Xingtai Road and Bridge asphalt library mobilization of rescue teams, personnel, materials and equipment. At the same time professional rescue team, materials and equipment from the emergency reserve rescue team mobilization.

Six, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, materials preparation:

The acquisition of branch materials by the manager is responsible for the main medicines and medical rescue appliances are as follows:

(1), medicines: cold medicines, fever medicines, diarrhea medicines, anti-inflammatory medicines such as therapeutic medicines and Rentan, ten drops of water, orthosiphon water, chrysanthemum tea, fire-reducing herbal teas, green health food, green bean The company's products are also available in a wide range of colors and sizes.

(2), ambulance apparatus: single frame, ambulance cars, small oxygen cylinders, earpieces, beds, towels, medicines, medicine boxes, freezers (ice) and so on.

VII. Rescue methods:

1, mild patients

When the site staff dizziness, fatigue, dazzle phenomenon, the staff should immediately stop the operation, to prevent secondary accidents, other peripheral staff should be symptomatic personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the leadership of the branch.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the work site appears heatstroke personnel, the operation of the peripheral staff should immediately notify the leadership of the branch plant, and promptly transfer the accident personnel to a cool, well-ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand information on medical treatment. The branch plant should be based on the specific circumstances, the emergency commander decides whether to start the emergency plan for heat stroke prevention and cooling. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. In the case of serious symptoms, if the medical equipment of the branch plant cannot save the person, the person should be transferred to the nearest hospital for observation and treatment at the first time. And reported to the company.

VII, the aftermath of the work:

1, according to the accident "four do not spare" principle, do a good job of investigating and handling accidents, to take targeted precautions, strengthen the publicity of the team, education, so that each person has mastered the precautions of the summer construction process, so that each person knows to protect know how to protect themselves; know how to rescue others. Summarize the lessons learned, to prevent the occurrence of similar events, specific precautionary measures are as follows:

(1), set up by the information team in the construction site thermometer, and the daily collection of weather conditions, processing, and then reported to the plant to prevent heat stroke protection team, according to the specific circumstances of the corresponding safety precautions taken.

(2), when the outdoor temperature is higher than 39 ℃, the plant should be the construction of each team cooling special safety instructions, so that the team to stop the site construction work.

(3), the logistics support team should be able to ensure that the staff site at any time drinking water, emergency drugs.

(4), by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable and effective "staff schedule" to avoid the highest daily temperature (11:00 ~ 15:00) section of the construction work. Discussed by the branch, the development of the company's summer (based on the city's calendar year high temperature months for July to September) construction schedule, specifically as follows:

Morning: 8:00 ~ 12:00

Afternoon: 15:00 ~ 19:00

In the event of a rush or other special circumstances require overtime work, and then do another notice.

(5), the branch of the safety education of the team to enhance the staff of the various situations should be dealt with ability. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the staff's ability to cope with the strain of practice and processing capacity.

Eight, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should be analyzed for accidents, to be determined by the hazardous area has been safe before entering the scene, continue to operate.

IX, emergency drills

Emergency plans and emergency plans established, after effective training, branch or company before the arrival of the summer each year to carry out large-scale rescue drills. At the end of each exercise, a timely summary, there are certain gaps in the future work to improve.

1, the purpose of the exercise

1), test the effectiveness of the emergency plan and implementation procedures and the degree of adequacy

2), test the emergency equipment

3), to ensure that the emergency response organization is familiar with their tasks and responsibilities

4), test the coordination of emergency response personnel

5), to identify and correct deficiencies in the plan. /p>

6), test the adequacy and effectiveness of emergency equipment

2. Emergency plan drills

In order to improve the technical level of the rescue personnel and the overall ability of the rescue team, so as to achieve a rapid, orderly and effective effect in the rescue operations of the accident. The branch will regularly carry out a rescue drill, emergency rescue training has become an important work of the rescue team, so in the emergency rescue process, the branch also emphasizes the following four points:

(1), the drill personnel must be on time in place, and equipped with their respective protective equipment.

(2), in the rescue process should be "self-protection, rescue others" and active and effective rescue.

(3), must strictly abide by the leadership of the command, to do "false to the truth", the effective implementation of rescue measures.

(4), the basic task of emergency training and exercises is: exercise or improve the team's unexpected accidents, rapid rescue and blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminating the consequences of the hazards, to carry out on-site emergency first aid and casualty evacuation and other emergency rescue skills and emergency response to effectively reduce the hazards of the accident, reduce the accident losses.

Selected measures to prevent heat stroke program (two)

Summer is hot, the temperature gradually climbed. In order to further do a good job in the summer heat stroke prevention and cooling work, to ensure that employees' physical and mental health, improve the work of the staff, enthusiasm, to ensure that the high temperature environment in the safe, efficient, high-quality completion of the tasks, by the company decided to carry out the summer to send a cool activity, is now related to the activities of the program is as follows:

First, the time of the activity

20xx

2, the departments within a week to the summer cooling items sent to the project department in a timely manner.

3. During the activity period, we should pay special attention to the weather forecast and adjust the activity plan in time to ensure that the coolness delivery service is available on key days and times.

4, the requirements of the departments in the delivery of cool at the same time more communication with the project staff, to understand the needs of employees, the company's concern for each employee heart.

Selected measures to prevent heat stroke program (three)

First, the purpose and requirements of the exercise.

In order to implement the occupational health and safety management system standards, to deal with the potential heat stroke accident hazards, to ensure the personal safety of the workers, clear emergency rescue procedures, to ensure that the first aid plan in an orderly manner to implement the plan, especially the preparation of the plan.

Second, the preparation of the basis.

1, "xxx".

2, "xxx".

3. "xxx"

III. Time, place, and participants of the exercise.

1, drill time: xx, xx, xx, 20xx, 13:00 - 13:30.

2, drill location: production department xx cross-cutting unit operation side 1 # stacking peripheral area.

3, to participate in the exercise personnel: exercise leadership group, A operation area, warehouse A class, turning package group.

4. Exercise leadership team.

1, leader: xx.

2, deputy leader: xx (command), xx (organization), xx (organization).

3, planning: xx.

4, group members: xx, xx, xx.

V. Rescue equipment and materials:

First aid kit (medical alcohol, Rendan, ten drops of water, patchouli, bandages, disinfectant), communication tools, towels, mineral water, electric fans.

Six, the exercise process:

1, cross-cutting employee xx in the 1 # stacking operation, heatstroke collapsed on the ground (simulation of the accident), the shift leader xx found, notify the shift operations chief xx.

2, operations chief xx received the accident report, immediately reported to the exercise leading group, while starting the emergency plan, organizing the The emergency plan was activated at the same time to organize on-site salvage.

3, xx: in the rescue at the same time to isolate the scene protection, evacuation of unrelated personnel, protection of the accident scene.

7, first aid steps:

1, moving: the operation chief xx organization site personnel will heat stroke employees xx quickly lifted to ventilation, cool, cool place, make it lying down, head elevated, and unbuttoned, loosen the belt, cuffs.

2, cooling: the patient's head covered with a wet towel, with cold water bath, to accelerate heat dissipation, but can not be directly to the patient blowing, to prevent the cause of cold.

3, hydration: if the heat stroke patients awake, no nausea, vomiting, can drink salt water, play a role in cooling, replenish blood volume. When replenishing water, do not rush to replenish a large amount of water to avoid causing vomiting, abdominal pain, nausea and other symptoms.

4, to promote wakefulness: If the patient has lost consciousness, you can finger pinch the middle of the man, Hegu and other points, so that it wakes up. If breathing stops, artificial respiration should be implemented immediately.

5, transfer: for severe heat stroke patients, must be sent to the doctor in time. Transportation should be as physical as possible on the way to protect the brain, heart and lungs and other important organs. You can use a cold compress on the head, or use a medical alcohol bath until the skin is red.

6, emergency rescue after heat stroke employees slowly awakened.

7, the operation chief Yan Wei confirmed to the exercise leadership team to report the completion of the heat stroke emergency plan site exercise.

Eight, the exercise leadership team summarized the exercise and announced the end of the exercise.

IX, the exercise personnel to withdraw from the exercise site, the unit resumed operations.

X. Summarize the problems in the exercise and make plans for improvement.

Selected measures to prevent heat stroke program (four)

First, the purpose:

Into the summer season, in order to avoid safety accidents caused by the high temperature and heat, to protect the health of the operators, and constantly improve the labor conditions, to prevent heat stroke and other types of production safety accidents caused by the hot weather workers. Each workshop, section should attach great importance to, take measures, highlight the key points, and effectively strengthen the supervision and management of production safety, to prevent the occurrence of various types of accidents. Now on the effective production safety measures during the summer heat as follows:

Second, the establishment of the leading group of work to prevent heatstroke:

Leader: xx

Deputy Leader: xxx

Member: xxxx

The leading group office is located in the safety and environmental protection section, xxx as director.

Office phone xxxx

Third, the specific measures to prevent heatstroke:

(a), conscientiously implement the responsibility system to prevent heatstroke. Workshops, sections to seriously implement the specific requirements of the production site to prevent heat stroke, to the front-line staff life and health of a highly responsible attitude, and effectively strengthen the prevention of heat stroke work of the organization and leadership, improve, implement the responsibility system, the development of contingency plans, pay close attention to the implementation of preventive measures to prevent the workers from heat stroke and various types of production and safety accidents caused by the hot weather.

(ii), the comprehensive organization of summer safety inspection. To effectively strengthen the safety of production, to prevent the summer heat and strong convective weather and other natural disasters caused by various types of accidents as a top priority to grasp, comprehensive organization of all professional sections, workshops for seasonal inspection, the implementation of the development of preventive measures, and make every effort to curb the occurrence of accidents during the high temperature.

(C), to strengthen the operation of the maintenance period of safety. To highlight the key projects hidden danger management, especially for electric, gas welding operations, limited space, work at height, etc. supervision, strict implementation of safety precautions before overhaul. All personnel participating in the overhaul should strictly comply with the safety measures of the Overhaul Safety and Environmental Protection Program. Open a good overhaul pre-shift meeting, to participate in the overhaul of the personnel to carry out the "five", that is, handing over the construction task, handing over safety measures, handing over the safety overhaul method, handing over the safety precautions, handing over to comply with the relevant safety regulations. The guardian must be on-site supervision from beginning to end, can not be unauthorized, carefully check the construction site, the implementation of safety and technical measures.

(D), strengthen the safety control of hazardous chemicals. In view of the rising temperatures easily caused by hazardous chemicals volatilization, leakage and deflagration, to increase the monitoring of major sources of hazardous chemicals, hazardous chemicals devices and pipelines to do a good job of explosion-proof, anti-lightning, anti-leakage, etc., and conscientiously implement the production and storage of hazardous chemicals production and storage of ventilation, cooling, waterproofing, moisture-proofing, fire prevention, explosion-proof, lightning protection and other measures, warehouses, pumps should be ventilated at any time to change the ventilation, the storage tanks should be Ensure that the alarm device is intact; the production and storage of hazardous chemicals should be "three inspections a day" and "three fixed" (i.e., quantitative storage, regular temperature measurement, regular ventilation); loading and unloading platforms should be well prepared for lightning protection, anti-static, emergency rescue and accident disposal. Strictly control the loading flow rate during the loading process to prevent the accumulation of static electricity. In order to avoid high temperature weather, benzene hydrogenation storage and transportation, tar storage and transportation, tar modified asphalt loading and unloading platform in the 11:00 to 15:00 period prohibited loading and unloading operations.

(E), strengthen the rotation of rest at work. According to the links of operational activities, adjust the labor organization, inspection and maintenance operators to take the intermittent mode of operation, the site of other operators to shorten a continuous operation time, to strengthen the work of the rotation rest.

(F), to ensure that the site drinking water supply is sufficient. Comprehensive office is fully responsible for all kinds of summer cooling supplies, drinking water contact collocation, distribution work, supply workshop enough health requirements of drinking water, beverages, summer tea and a variety of soups, etc., effective prevention of heat stroke, to avoid heat stroke events.

(VII), the implementation of summer cooling items. Safety and environmental protection section is responsible for the issuance of the workshop heat stroke medicines and the tracking and inspection of employees taking medicines. Strengthen the publicity of the knowledge of heat stroke prevention and cooling, and require operators to take or apply heat stroke prevention medicines before operation, such as: Rendan, Qingliang oil, anemarrhen, etc., and implement the heat stroke prevention and cooling items for each worker.

(H), effectively do a good job of health and epidemic prevention. To effectively do a good job on-site and dormitory health epidemic prevention work, strengthen the drinking water to strengthen the monitoring of summer-prone diseases, the site operators occur statutory infectious diseases, food poisoning, should be promptly reported to the scheduling, safety and environmental protection section. Dormitory hygiene should be made clean, the house should be moderately ventilated, pay attention to personal hygiene, often use hand sanitizer (soap) and water to wash hands, especially after coughing or sneezing. When coughing or sneezing, cover your mouth and nose with a tissue and throw the tissue in the trash. To achieve "early detection, early reporting, early isolation, early treatment", to improve the staff's ability to prevent disease, to ensure personal safety.

(ix), do a good job of summer fire prevention. For the summer heat, dry weather, fire accidents are easy to occur in the actual situation, to further strengthen the fire prevention measures, electrical instrumentation workshop organization of the distribution room, oil pump room and other flammable places to carry out regular special inspections, found that the problem immediately rectified to avoid accidents.

(10), do a good job on duty and information reporting. Each section, workshop should seriously develop heat, flood control, fire prevention, anti-poisoning emergency plan, do a good job of emergency teams and emergency supplies. Arrange for high temperature, strong convective weather during the duty work, the occurrence of dangerous situations and accidents, must be immediately reported, and in the first time to the scene to deal with, to prevent the expansion of the accident.

Selected measures to prevent heat stroke program (five)

First, the purpose

In order to strengthen the high temperature operation, hot weather labor protection, in order to effectively do a good job in the summer construction site prevention of heat stroke work, to protect the health of the operators, and constantly improve the labor conditions, to prevent heat stroke of the workers due to the hot weather and other types of production Safety Accidents. According to "xxx", "xxx", "heat stroke prevention measures management measures" and other relevant laws and regulations, special planning this program.

Second, the scope of use

Shuangfu production plant of all personnel and interns

Third, the definition of terms

1) the daily maximum temperature reaches 35 ℃ or more, 37 ℃ or less for the general high-temperature weather;

2) the daily maximum temperature reaches 37 ℃ or above, 40 ℃ or below for moderate hot weather;

3) daily maximum temperature reaches 40 ℃ or above for intense hot weather;

4) sustained high temperature refers to more than five consecutive days of "high temperature days"

5) hot weather operation refers to the employer in the period of hot weather arrangements for laborers to carry out operations in a hot natural weather environment.

Fourth, the implementation time

20xx x month ~ 20xx x month (if the outdoor temperature continues to be 36 ℃ or more, the implementation date is appropriately postponed)

Fifth, the relevant requirements

1) the regulatory requirements: xxx

During hot weather, the employer shall, in accordance with the following provisions, according to the characteristics of production and specific conditions, take measures such as reasonable arrangement of working hours, rotating operations, appropriately increasing the rest time of workers in the hot working environment and reducing labor intensity, and reducing the number of outdoor operations during hot periods:

The employer shall, in accordance with the forecast temperature issued by the weather stations under the municipal meteorological authorities on the same day, adjust the

(a) general hot weather, the employer shall take shift rotation and other ways to shorten the continuous operation time of workers, and shall not arrange for outdoor open

day operation of workers overtime; the employer shall effectively do a good job in the hot weather heatstroke prevention and cooling work, to formulate and implement heatstroke prevention measures, to ensure that the heatstroke prevention and cooling equipment, devices and equipment to operate normally.

(b) moderate high temperature weather, the employer all day arrangement of workers outdoor open-air work time should be in accordance with the safety supervision of the General Health [20xx] 89 document

provisions of the implementation of the moratorium on 12-16 hours of high-temperature outdoor open-air work. Because of the production process requirements must be in the heat of the open-air work, the employer should be reasonable adjustment of work and rest time, and take measures to prevent heat stroke.

(c) intensity of hot weather, should stop the day of outdoor work. Because of the requirements of the production process must be open-air work, the employer should reasonably adjust

Adjustment of work and rest time, and take measures to prevent heat stroke.

2) the current situation on site:

(a) due to the assembly workshop is hotter; work time has been when the sun, no ventilation, the roof is a board room to absorb heat, the temperature in summer can reach more than 50 degrees; (b) the actual temperature of the assembly plant site is higher than the temperature of the Chongqing Weather Report 2 ° above the assembly plant has been 4 employees heat stroke on July 9;

Six, costs Budget:

xx yuan

(a) Heatstroke prevention supplies budget: ¥ xx yuan

(b) Cool drinks budget: ¥ xx yuan

(c) Cooling equipment budget: ¥ xx yuan

(1) summer high-temperature operation time adjustment

Remarks:

x mid-month ~ xx month It is estimated that there are 65 days the temperature reaches 35 ° above the temperature above 35 ° for the four major workshops to prepare the following cooling food:

1, mung bean soup: 30 pounds of mung beans / day

2, 10 pounds of sugar / day

3, relief tea: 1 pound / day